Air Conditioning / Air Ventilation - Maintenance & Inspection

Official notice

Authority: Offshore Renewable Energy Catapult

Framework agreement2 lotsGoodsOpen procedure
Framework ceiling (notional)Value not publishedframework ceiling, not attributable revenue
Submissions closed 1 May 2023awarded 28 Aug 2023
Lots 2see the lot list below

What is being bought2 lots · detail below

Published requirement description

This is a contract award notice.

The purpose of the ITT was to assist ORE Catapult in establishing a Framework Agreement for the provision of Air Conditioning / Air Ventilation Maintenance as well as the purchase and installation of new equipment to ORE Catapult site in Blyth, Northumberland.

CPV: Construction work · Industrial machinery

How this framework works

From the published notice
Bids received
4 bids on the busiest of 2 lots · 3 suppliers appointed

Lots and requirements (2)Procurement structure

2 lots · no lot values published · same evaluation weights on every lot
Lot #1Inspection and Maintenance of Air Conditioning / Air Ventilation SystemsAwardedRenewal

ORE Catapult was seeking to appoint a specialist Contractor to undertake servicing and maintenance of Air Conditioning / Air Ventilation systems which are installed at various locations across its site in Blyth, Northumberland.

Delivery: North East
Extensions: Option to extend by up to twenty-four (24) months.Variant bids: not allowed
Lot #2Supply and Installation of new and replacement Air Conditioning / Air Ventilation SystemsAwardedRenewal

ORE Catapult was seeking to appoint multiple specialist Contractors to Lot 2 of this Framework Agreement to undertake any requirements for supply and installation of Air Conditioning / Air Ventilation systems, or major refurbishment of the current systems as and when required for the site in Blyth, Northumberland.

Delivery: North East
Extensions: Extension of p to twenty-four (24) months.Variant bids: not allowed

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored · same split on all 2 lots
Quality: 60%Price: 40%
Published sub-criteria (2)
  • Technical: 60%
  • price: 40%
Published award criteria (2)
  • Technical: 60
  • Price: 40
What this means for your bid
  • Price carries 40 of 100 points: a 10% discount moves about 4 points. The method statement decides this lot, not the discount.
  • “Air Conditioning / Air Ventilation - Maintenance & Inspection” is a framework: the contest is a place on its panel, not a single contract.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Open procedure
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Goods
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
No (one-off requirement)
First published
29 Mar 2023, 12:14 BST
Last source update
28 Aug 2023, 15:26 BST
Award evaluation window
1 May 2023 – …
Authority reference
DN663184
FTS notice number
2023/S 000-025221
Classification (CPV)
Construction workIndustrial machinery
Delivery area
North East (UKC)
Official registry OCID
ocds-h6vhtk-03b6fe Find a Tender

How it was run

Official notice
Run through: ProContract (Due North) · Who buys & how to bid on ProContract
Supplier login requiredLanguage: EN
Access & registration note: Free · short registration with manual review; public opportunity list
Appointment period ends
1 May 2023, 12:00 BST
Submission channel
{"electronicSubmission"}
Accepted languages
en
Bids opened
1 May 2023, 12:05 BST
Detailed submission instructions & authority contactsFrom official release

Timeline

1 May 2023 → 28 Aug 2023 · 3 dates
  1. Admission / appointment period endsperiod end, not a bid countdown
    1 May 2023, 12:00 BST
  2. Bids opened
    1 May 2023, 12:05 BST
  3. Notice published
    28 Aug 2023, 15:26 BST

Notice history

1 event · 2 releases on Find a Tender
  1. Status changed to complete
    28 Aug 2023, 15:26 BST

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 3admitted to the panel · see the list ↓
Bids received 4busiest of 2 lots
Contracts signed 2latest 28 Aug 2023

2 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.

Contracts

  • Inspection and Maintenance of Air Conditioning / Air Ventilation Systems

    Signed
    28 Aug 2023
    Value
    —
    Status
    active
  • Supply and Installation of new and replacement Air Conditioning / Air Ventilation Systems

    Signed
    28 Aug 2023
    Value
    —
    Status
    active

Bid statistics published by the authority

LotBidsSMEVCSEValid bid range
1 · Inspection and Maintenance of Air Conditioning / Air Ventilation Systems4bids——£1 – £250,000
2 · Supply and Installation of new and replacement Air Conditioning / Air Ventilation Systems4bids——£1 – £250,000
Whole notice———£1 – £250,000

Contracting authority & participating public bodies

Offshore Renewable Energy Catapult

Contracting authorityCompliance with funding agreementResearch & Development Inovo, 121 George Street, Glasgow, North East, G1 1RDContact name, email, phone Published organisation website ↗

Dispute resolution & review bodies

  • Royal Courts of JusticeReview body London

Framework contractors & participating bidders

3 commercial parties on the notice

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.