Find a TenderPast planning notice
Published 10 Oct 2022, 09:14 BST

Official UK procurement notice

Cell Assembly Equipment for UKBIC Flexible Industrialisation Line (FIL)

Official notice

Authority: UK Battery Industrialisation Centre

3 lotsGoods
Planned pipeline valueValue not publishedpipeline notice, not a live tender
Tender notice expected 13 Feb 2023from the planned procurement notice
Lots 3see the lot list below

What is being bought3 lots · detail below

Published requirement description

UKBIC has a requirement to purchase a range of equipment for the assembly of both cylindrical and pouch cells to establish a Flexible Cell Assembly Line at the UK Battery Industrialisation Centre.

The UK Battery Industrialisation Centre (UKBIC) is part of the UK Government’s Faraday Battery Challenge. UKBIC is a national battery manufacturing development facility helping to scale-up battery manufacturing and facilitate upskilling in the battery sector. We are a publicly funded, open access facility, funded by the Faraday Battery Challenge at UK Research and Innovation (UKRI).

This PIN lists the general requirements for cylindrical and pouch cell manufacturing equipment, which is required for the manufacture of high quality, commercially relevant, high power or high energy, cylindrical and pouch cells in low volumes.

This requirement is split into three lots:

Lot 1 – Vacuum drying ovens

Lot 2 – Cylindrical cell assembly equipment

Lot 3 – Pouch cell assembly equipment

Suppliers will be able to bid for individual lots, however bids that offer combined solutions incorporating more than one aspect of this equipment are encouraged.

Bidders are also encouraged to put forward energy efficient solutions.

All equipment to provide UKCA conformity.

CPV: Electrical machinery, apparatus, equipment and consumables; lighting · Industrial machinery

Lots and requirements (3)Procurement structure

3 lots · no lot values published
Lot #1Vacuum Drying OvensPlanned

Lot 1 – Vacuum drying ovens

Two independent vacuum ovens for the drying of electrodes. The ovens should have an internal volume of between 100l and 200l and a drying temperature range of 50 to 150ºC. The system should have the capability to program the vacuum drying sequence to operate on a schedule.

The drying ovens shall be supplied with vacuum pumps that are compatible with the moisture and trace levels of solvents that will be removed from the anode and cathode electrodes.

Suppliers should highlight any other special features available, such as the ability to purge with inert gas before/after drying.

Delivery: West Midlands
Lot #2Cylindrical Cell Assembly EquipmentPlanned

Lot 2 – Cylindrical cell assembly equipment

Cylindrical cell assembly equipment for the manufacture of 21700 and/or 46800 cells. The equipment should be capable of producing high quality commercially relevant cylindrical cells in low volume, such as 1-10 cells per hour.

It is anticipated that the assembly equipment will comprise multiple semi-automated stations that cover the entire cell manufacturing process from taking reels of anode and cathode electrode at the input and producing finished cells ready for FA&T (Formation Age & Test) as the output.

Ideally UKBIC wants the capability to produce both cylindrical cell types, however suppliers who can only offer a solution for one or other of the cell sizes are encouraged to do so.

Suppliers shall highlight what degree of flexibility there is to produce other cell sizes using this equipment, for example by reconfiguring the stations and the use of different sets of tooling.

Delivery: West Midlands
Lot #3Pouch Cell Assembly EquipmentPlanned

Lot 3 – Pouch cell assembly equipment

Pouch cell assembly equipment for the manufacture of pouch cells up to a size of 300mm long x 100mm wide x 4-12mm thick (counter sided taps). The equipment shall be capable of producing high quality commercially relevant pouch cells in low volume, such as 1-10 cells per hour.

It is anticipated that the assembly equipment shall comprise multiple semi-automated stations that cover the entire cell manufacturing process from taking reels of anode and cathode electrode at the input and producing finished cells ready for FA&T (Formation Age & Test) as the output.

Suppliers should highlight what degree of flexibility there is to produce other cell sizes using this equipment, for example by reconfiguring the stations and the use of different sets of tooling.

Delivery: West Midlands

Procedure terms & legal framework

From the official record · publisher note attached
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Goods
Notice status
Past planning notice
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
Unspecified in notice
First published
10 Oct 2022, 09:14 BST
Last source update
10 Oct 2022, 09:14 BST
Authority reference
DN636361
FTS notice number
2022/S 000-028351
Classification (CPV)
Electrical machinery, apparatus, equipment and consumables; lightingIndustrial machinery
Delivery area
West Midlands (UKG)
Official registry OCID
ocds-h6vhtk-037438 Find a Tender

Publisher note: We welcome the following information from any interested suppliers: • Timings • Layout / footprint (operational and equipment) • Brochures • Specification sheets • Unique selling points compared to competition • Technical and service support in the UK • Typical Services required for: Power (Load - XX kw)/ Chilled water (Load - XX kW) / Compressed air (Min/Max Pressure - XX bar)/ Special Gas requirements/ Compressed air (Min/Max Pressure - XX bar)/ Equipment heat load (Thermal power released - XX W)/ Wastewater and -air

How it was run

Official notice
Submission deadline
—

Timeline

10 Oct 2022 → 13 Feb 2023 · 2 dates
  1. Notice published
    10 Oct 2022, 09:14 BST
  2. Tender notice expected
    13 Feb 2023

Commercial outcome & contract awards

Pipeline notice
Awards (0)
No award published
Contracts (0)
No contract published
Bid statistics
No aggregate bid statistics published

Contracting authority & participating public bodies

UK Battery Industrialisation Centre

Contracting authorityBody governed by public lawResearch & Development Rowley Road, Baginton, Coventry, West Midlands, CV8 3ALContact name, email, phone

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.