Published estimate£4,900,000total for 3 lots
Submissions closed 21 Mar 2023awarded 30 Jun 2023
Awarded to Montel Civil Engineering Limited
Contract term Ends 31 May 2024

What is being bought3 lots · detail below

Published requirement description

Devon County Council (DCC) are delivering a key piece of infrastructure on behalf of

Teignbridge District Council (TDC) in the Shutterton area of Dawlish (Grid Ref – 296289,

78512). Homes England are an interested party.

The scheme will provide a section of new link road, through a green field

site, which will eventually join up with 3rd party infrastructure and housing deliveries.

DCC’s scheme extends on from the first section of link road that has been built by

Persimmon Homes.

The “Dawlish HiF (Housing Infrastructure Fund)” scheme that DCC are

delivering includes, but not limited to, the construction of:

  • A 26m span highway bridge
  • Approximately 110m of highway embankments on the approaches to the bridge, including

carriageway and foot/cycle paths

  • Approximately 360m of at grade carriageway
  • Surface water and foul water drainage features
  • Drainage basins, swale and associated items
  • Ecological mitigation enhancement features
  • Landscaping
  • Fencing

DCC will deliver the full scope of the works in connection with the delivery

of the infrastructure between CH310 to CH800, on behalf of TDC.

DCC and TDC had the option to deliver a reduced scope of works (CH310-440 only) only if

the Tender offered by all Tenderer’s for the full scope of the works was above the available

funding budget available or below the minimum quality or TDC Full Council did not approve

the additional funding to allow for its award.

In addition, DCC could not award all or some of the lots until the necessary Land and

Highways Agreements had been secured.

The maximum funding available for the works is £4,900,000.00. The maximum funding

available for the reduced scope of works, in the eventuality that additional funding was not

approved by TDC, is £3,700,000.00.

The Procurement had been divided into Lots. Tenderers could bid for one or more of the

following lots:

Lot 1 Bridge and Spine Road (Entire scheme CH310-800) - Additional Funding

This includes for the entire scheme works in accordance with the entirety of the Contract

Documents. Therefore, the delivery of all features within the Contract Documents in

connection to the delivery of infrastructure between Chainages 310 and 800.

These works are consented under Planning Consents References 21/02872/FUL and

21/02674/MAJ.

Lot 2 Bridge works alone (Reduced scheme CH310-440 only) - Additional Funding and Lot 3

Bridge works alone (Reduced scheme CH310-440 only)

This includes for a reduced extent of scheme works. Lot 2 and 3 is for the delivery of all

features within the Contract Documents in connection to the delivery of infrastructure

between Chainages 310 and 440 only.

These works are consented under Planning Consents Reference 21/02872/FUL.

DCC expected to appoint 1 Contractor for Lot 1. If TDC Full Council did not approve the

funding for the preferred tenderer’s Tender Price or tender returns be returned at a level that

did not achieve a qualitative evaluation score of 50% or more of the total percentage

available for quality or planning permission for the planning application reference

‘21/02674/MAJ’ was refused by TDC, DCC expected to appoint 1 Contractor for Lot 2 instead, which is a reduced scope of works. If TDC did not approve the additional funding

required to deliver Lot 1 or 2, DCC expected to appoint 1 Contractor for Lot 3 instead.

DCC reserved the right to not award all or some of the lots.

Works are anticipated to commence Summer 2023.

CPV: Construction work

Lots and requirements (3)Procurement structure

3 lots · 2 with a published value (£8,600,000 together) · win at most 1 of them · same evaluation weights on every lot
Lot #1Bridge and Spine Road (Entire scheme CH310-800) - Additional FundingAwardedLot estimate not published

This includes for the entire scheme works in accordance with the entirety of the Contract

Documents. Therefore, the delivery of all features within the Contract Documents in

connection to the delivery of infrastructure between Chainages 310 and 800.

These works are consented under Planning Consents References 21/02872/FUL and

21/02674/MAJ.

Contract period: … – 31 May 2024
Delivery: South West
Variant bids: not allowed
Lot #2Bridge works alone (Reduced scheme CH310-440 only) - Additional FundingCancelledPublished value£4,900,000

This includes for a reduced extent of scheme works. Lot 2 is for the delivery of all features

within the Contract Documents in connection to the delivery of infrastructure between

Chainages 310 and 440 only.

These works are consented under Planning Consents Reference 21/02872/FUL.

Contract period: … – 31 May 2024
Delivery: South West
Variant bids: not allowed
Lot #3Bridge works alone (Reduced scheme CH310-440 only)CancelledPublished value£3,700,000

This includes for a reduced extent of scheme works. Lot 3 is for the delivery of all features

within the Contract Documents in connection to the delivery of infrastructure between

Page 10 to 13

Chainages 310 and 440 only.

These works are consented under Planning Consents Reference 21/02872/FUL.

Contract period: … – 31 May 2024
Delivery: South West
Variant bids: not allowed

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored · same split on all 3 lots
Quality: 20%Price: 80%
Published award criteria (2)
  • Quality: 20
  • Price: 80
Lot distribution rule: There is a limit on the number of lots awarded to one provider. DCC is expecting to appoint 1 Contractor for Lot 1. If TDC Full Council does not approve the funding for the preferred tenderer’s Tender Price or tender returns be returned at a level that does not achieve a qualitative evaluation score of 50% or more of the total percentage available for quality or planning permission for the planning application reference ‘21/02674/MAJ’ is refused by TDC, DCC is expecting to appoint 1 Contractor for Lot 2 instead, which is a reduced scope of works. If TDC do not approve the additional funding required to deliver Lot 1 or 2, DCC is expecting to appoint 1 Contractor for Lot 3 instead.
What this means for your bid
  • Price carries 80 of 100 points: a 10% discount moves about 8 points. This one is won on the number: sharpen the price before polishing the prose.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Open procedure
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Works
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
No (one-off requirement)
First published
27 Jan 2023, 17:22 GMT
Last source update
30 Jun 2023, 10:01 BST
Award evaluation window
21 Mar 2023 – …
Authority reference
DN635120
FTS notice number
2023/S 000-018626
Classification (CPV)
Construction work
Delivery area
South West (UKK43)
Official registry OCID
ocds-h6vhtk-039b9f Find a Tender

How it was run

Official notice
Run through: ProContract (Due North) · Who buys & how to bid on ProContract
Supplier login requiredLanguage: EN
Access & registration note: Free · short registration with manual review; public opportunity list
Submission deadline
21 Mar 2023, 12:00 GMT
Submission channel
{"electronicSubmission"}
Accepted languages
en
Bids opened
21 Mar 2023, 12:00 GMT
Detailed submission instructions & authority contactsFrom official release

Timeline

21 Mar 2023 → 30 Jun 2023 · 3 dates
  1. Submission deadline
    21 Mar 2023, 12:00 GMT
  2. Bids opened
    21 Mar 2023, 12:00 GMT
  3. Notice published
    30 Jun 2023, 10:01 BST

Notice history

1 event · 3 releases on Find a Tender
  1. Status changed to complete
    30 Jun 2023, 09:45 BST
Published amendments (1 · 0 deadline changes)
WhenWhatBeforeAfterShift
—DateDate of conclusion of the contract · V.2.130 Jun 202324 Jun 2024+360 d

1 amendment published without a description.

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awards 1
Awarded value £4,710,2361 contract exc. VAT
Bids received 5
Contracts signed 1latest 30 Jun 2023
Awarded toValueDateStatus
Lot 1 · Bridge and Spine Road (Entire scheme CH310-800) - Additional Funding1 award
Montel Civil Engineering LimitedSMECP2251-22 Dawlish HIF - Lot 1 Bridge and Spine Road (Entire scheme CH310-800) - Additional Funding£4,710,236 †—Awarded

Contracts

  • CP2251-22 Dawlish HIF - Lot 1 Bridge and Spine Road (Entire scheme CH310-800) - Additional Funding · Montel Civil Engineering LimitedSME

    Signed
    30 Jun 2023
    Value
    £4,710,236
    Period
    … – 31 May 2024
    Status
    active

Bid statistics published by the authority

LotBidsSMEVCSEValid bid range
1 · Bridge and Spine Road (Entire scheme CH310-800) - Additional Funding5bids———

Contracting authority & participating public bodies

Devon County Council

Contracting authorityLocal CouncilRegional or local authorityGeneral public services County Hall, Topsham Road, Exeter, South West, EX2 4QDContact name, email, phone Published organisation website ↗

Dispute resolution & review bodies

  • The High Court of JusticeReview body London

Bidders & participating suppliers

1 commercial party on the notice

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.