Official UK procurement notice
Decarbonisation Project - Complete Transition of Heating Systems
Authority: Mid Yorkshire Hospitals NHS Trust (Central government)
What is being bought
Published requirement descriptionThis project entails the complete transition of all heating systems at Ashton Centre, Cullingworth House and Woodkirk from fossil fuel to electric, through the use of air source heat pumps (ASHP). This project also includes the installation of solar panels to aid in the additional electrical requirements of the heat pump solution. <br/>The project has received government funding for design and construction of the low carbon system through the PSDS funding stream.
CPV: Solar collectors for heat production · Solar energy · Solar installation · Solar panel roof-covering work · Solar panels
How this framework works
From the published notice- Places
- up to 1 suppliers
The lotProcurement structure
single lot · value publishedLot #1Published value£1,000,000
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
- Suitability
This tender is being run via the CCS Demand Management + Renewables Framework - RM6314 and in particular the following lots: <br/><br/>Lot 1.1 Solar Photovoltaic – Projects £0 - £1M <br/><br/>Lot 3.1 Heat Pumps – Projects £0 - £1M
- Staff
- Names and qualifications of delivery staff must be submitted
- “Decarbonisation Project - Complete Transition of Heating Systems” is a framework: the contest is a place on its panel, up to 1 suppliers, not a single contract.
Procedure terms & legal framework
From the official record- Procedure method
- Open procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Closed
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- No (one-off requirement)
- First published
- 5 Jan 2024, 15:07 GMT
- Last source update
- 5 Jan 2024, 15:07 GMT
- Award evaluation window
- 2 Feb 2024 – …
- Authority reference
C233280- FTS notice number
2024/S 000-000376- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-042b0eFind a Tender
- Electronic trading
- e-invoicing allowed · electronic ordering · electronic payment
How it was run
Official noticeTender documents are also served through a separate tool: https://health-family.force.com/s/Welcome ↗
- Appointment period ends
- 2 Feb 2024, 09:00 GMT
- Submission channel
- {"electronicSubmission","written"}
- Accepted languages
- en
- Bids opened
- 2 Feb 2024, 12:00 GMT
Timeline
5 Jan 2024 → 2 Feb 2025 · 4 dates- Notice published5 Jan 2024, 15:07 GMT
- Admission / appointment period endsperiod end, not a bid countdown2 Feb 2024, 09:00 GMT
- Bids opened2 Feb 2024, 12:00 GMT
- Bids must remain valid until2 Feb 2025, 23:59 GMT
Contracting authority & participating public bodies
Dispute resolution & review bodies
- Calderdale and Huddersfield NHS Foundation TrustMediation body
- Leeds Teaching Hospitals NHS TrustReview body
Official documents & specifications (2)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria
- Technical selection criteria