Fire Safety Remediation Works, London E8

Official notice

Authority: Metropolitan Housing Trust (Housing)

Works
Planned pipeline value£10,000,000pipeline notice, not a live tender
Tender notice expected 4 Dec 2023from the planned procurement notice

What is being bought

Published requirement description

Scope of Works - The block consists of 68 flats over 5 stories including some commercial units at ground level. Constructed in 2009 recent investigations have identified deficiencies in fire compartmentation. These have been detailed in the Fire Engineers PAS 9980 report and subsequent investigations into the internal areas of the building. The requirement now is to rectify the areas of non-compliance identified and it is proposed to enter into a JCT D&B contract with the successful tenderer to complete these works. External works include provision of cavity barriers at floor levels, compartment walls window openings and around vents. Removal and replacement of combustible material within external walls. Finishes to walls are mixture of brickwork, stone panels and zinc. Internal works include replacement of flat entrance doors, communal doors, upgrading of risers, AOV shafts, partitions and fire stopping. Potential upgrading of partitions within flats. The flats are a mixture of general needs rent and leaseholders. The work will be done with residents in occupation. Budget - The current estimate for the works is between £5m to 10m excluding VAT Outline Programme – Estimated Key dates -

  • Issue Tender Documents – estimated between1st December 2023 and 30th April 2024
  • Tender returns – 4 weeks after issue
  • Approval to proceed – 4 weeks after returns
  • Start on site – Spring 2024
  • Contract completion – Autumn 2025

CPV: Construction work · Fireproofing work · For fire protection

The lotProcurement structure

single lot · no lot value published
Lot #1Scope of Works: The block consists of 68 flats over 5 stories including some…Planned

Scope of Works: The block consists of 68 flats over 5 stories including some commercial units at ground level. Constructed in 2009 recent investigations have identified deficiencies in fire compartmentation. These have been detailed in the Fire Engineers PAS 9980 report and subsequent investigations into the internal areas of the building. The requirement now is to rectify the areas of non-compliance identified and it is proposed to enter into a JCT D&B contract with the successful tenderer to complete these works. -------------------------------------- External works include provision of cavity barriers at floor levels, compartment walls window openings and around vents. Removal and replacement of combustible material within external walls. Finishes to walls are mixture of brickwork, stone panels and zinc. ------------------------------------------------------------------------------------------ Internal works include replacement of flat entrance doors, communal doors, upgrading of risers, AOV shafts, partitions and fire stopping. Potential upgrading of partitions within flats. The flats are a mixture of general needs rent and leaseholders. The work will be done with residents in occupation. Budget: The current estimate for the works is between £5m to 10m excluding VAT ------------------------------------------------------------------------------------- Outline Programme – Key dates: ----------------------------------------------------------------------------------------------------------------

  • Issue Tender Documents – estimated between1st December 2023 and 30th April 2024 ---------------------------------
  • Tender returns – 30 days after issue -----------------------------------------------------------------------------------------------------------
  • Approval to proceed – 4 weeks after returns ---------------------------------------------------------------------------------------------
  • Start on site – Spring 2024
  • Contract completion – Autumn 2025
Delivery: London · Inner London – East

Procedure terms & legal framework

From the official record · publisher note attached
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Works
Notice status
Past planning notice
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
Unspecified in notice
First published
6 Oct 2023, 14:05 BST
Last source update
6 Oct 2023, 14:05 BST
Authority reference
2023-2024-054
FTS notice number
2023/S 000-029545
Classification (CPV)
Construction workFireproofing workFor fire protection
Delivery area
London (UKI4)
Official registry OCID
ocds-h6vhtk-0408a0 Find a Tender

Publisher note: feedback is invited on the scope and a bidders' day is anticipated in November/December 2023 To view this notice, please click here: <a href="https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=812670334" target="_blank">https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=812670334</a> GO Reference: GO-2023106-PRO-24132337

How it was run

Official notice
Submission deadline
—

Timeline

6 Oct 2023 → 4 Dec 2023 · 2 dates
  1. Notice published
    6 Oct 2023, 14:05 BST
  2. Tender notice expected
    4 Dec 2023

Commercial outcome & contract awards

Pipeline notice
Awards (0)
No award published
Contracts (0)
No contract published
Bid statistics
No aggregate bid statistics published

Contracting authority & participating public bodies

Metropolitan Housing Trust

Contracting authorityHousingBody governed by public lawHousing and community amenities The Grange, 100 High Street, Southgate, London, London, N14 6PWContact email, phone

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.