HE0914 A350 Chippenham Duelling Scheme April 2023
Authority: Wiltshire Council (Local council)
What is being bought
Published requirement descriptionhe A350 is one of the most important routes in Wiltshire. It is a primary north-south route with regional significance connecting the south coast with the M4 and onwards to Bristol and the Midlands. In Wiltshire it passes around the principal settlements of Chippenham and Trowbridge via the town of Melksham and on to Westbury and Warminster.
It has been a longstanding priority to improve north-south connectivity along the A350, and Wiltshire Council has been progressively bringing forward the dualling of the A350 Chippenham bypass.
Over recent years three major capital schemes (Phases 1, 2 and 3) have been brought forward to improve capacity and safety on the route, largely funded through successful Department for Transport (DfT) and/or Local Enterprise Partnerships (LEP) funding bids.
Most recently, an Outline Business Case (OBC) bid was made to DfT for funding to bring forward a scheme to complete the dualling of the A350 bypass at Chippenham.
In the spending review in October 2021 the government announced that it would allocate funds for a scheme to dual the remaining single carriageway sections of the A350 route round Chippenham. The project was also included within the list of forthcoming infrastructure projects as part of The Growth Plan 2022 published in September 2022.
Wiltshire Council and its consultants Atkins are now pressing forward to complete the design of the remaining Phases 4 and 5 of the scheme, and preparing the Full Business Case (FBC). Subject to the FBC being approved by the DfT, it is anticipated that construction works will be undertaken during 2024 and 2025.
The scheme is likely to include for the following key elements
Phase 4 dualling: widening the A350 over a total distance of some 1.5km to dual 2-lane between Chequers roundabout and Lackham roundabout. The dualling would take place within the existing wide highway verge to the west of the current carriageway.
Phase 5 dualling: widening the A350 over a total distance of some 1.75km to dual 2-lane between Cepen Park South roundabout and Bumpers Farm roundabout. Again, the dualling would take place within the existing wide highway verge to the west of the current carriageway. When implemented with Phase 4, this would extend the dualling to cover the full stretch of the A350 Chippenham Bypass.
Bumpers Farm Roundabout capacity enhancements: increasing the circulatory from 2 lanes to 3; signalising 4 approach arms; increasing approach arms from A350 (S), A420 (W), A350 (N) and A420 (E) to 3 lanes; and dualling the exits onto the A420 (E) and A420 (W) and
Lackham roundabout capacity enhancements: dualling the exit to the A350 north as part of the phase 4 works.
The works will be designed and built-in accordance with current standards and guidelines and will include for all key aspects of highway construction – earthworks, carriageway, footways, drainage, street lighting, signage, statutory authority (gas, water electric etc) service diversions and provision, and hard and soft landscaping works.
The works will be contained within the existing highway boundary extents and there should be no requirement for additional land. The existing bridges along this route were constructed to accommodate the additional carriageways without needing further major works, and as such there are no major structural works anticipated.
The A350 route will need to remain in operation throughout the works, and as such careful traffic management considerations and phasing, particularly in connection with the Bumpers Farm Roundabout enhancements, will be required. There will be a desire to minimise impacts on traffic flows during the works and ensure that the scheme is undertaken with suitable and appropriate levels of public engagement and liaison.
CPV: Construction work for highways · Construction work for highways, roads · Dual carriageway construction work · Erection of road-barriers · Foundation work for highways · Foundation work for highways, roads, streets and footpaths · Installation of road signs · Installation of street furniture · Main road construction works · Ring road construction work · Road construction works · Road-surface painting work · +3 more
The lotProcurement structure
single lot · value publishedWhat it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published award criteria (2)
- Quality: 40
- Price: 60
- Price carries 60 of 100 points: a 10% discount moves about 6 points. This one is won on the number: sharpen the price before polishing the prose.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record- Procedure method
- Restricted procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- No (one-off requirement)
- First published
- 13 Oct 2022, 16:06 BST
- Last source update
- 30 Apr 2025, 15:29 BST
- Authority reference
DN637737- FTS notice number
2025/S 000-018102- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-037589Find a Tender
How it was run
Official notice- Submission deadline
- 31 May 2023, 12:00 BST
- Submission channel
- {"electronicSubmission"}
- Accepted languages
- en
Timeline
27 Apr 2023 → 30 Apr 2025 · 3 dates- Next notice expected27 Apr 2023, 00:00 BST
- Submission deadline31 May 2023, 12:00 BST
- Notice published30 Apr 2025, 15:29 BST
Notice history
5 events · 5 releases on Find a Tender · since 27 Apr 2023- Status changed to active27 Apr 2023, 22:51 BST
- Procurement method changed27 Apr 2023, 22:51 BST
- Deadline published: 30 May 2023, 12:00 BST27 Apr 2023, 22:51 BST
- Deadline moved to 31 May 2023, 12:00 BST24 May 2023, 11:58 BST+1 days · was 30 May 2023, 12:00 BST
- Status changed to complete30 Apr 2025, 15:29 BST
Published amendments (1 · 1 deadline change)
| When | What | Before | After | Shift |
|---|---|---|---|---|
| — | DeadlineTime limit for receipt of tenders or requests to participate · IV.2.2 | 30 May 2023 | 31 May 2023 | +1 d |
1 amendment published without a description.
Routine re-releases (5)
- 2023-03: 1 release · 16 Mar 2023
- 2022-10: 1 release · 13 Oct 2022
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| MJ Church (Plant) Limited | £21,191,000,000 †very large published value · not counted until verified, check the notice | — | Awarded |
Contracts
HE0914 A350 Chippenham Duelling Scheme April 2023 · MJ Church (Plant) Limited
- Signed
- 29 Apr 2025
- Value
- £21,191,000,000
- Period
- … – 2 Feb 2026
- Status
- active
Bid statistics published by the authority
| Bids | SME | VCSE | Valid bid range |
|---|---|---|---|
| 13bids · 13 electronic · 13 from abroad | 5 | — | — |
Contracting authority & participating public bodies
Dispute resolution & review bodies
- High Court of England and WalesReview body
- High Court of England and Wales, The Royal Court of JusticeReview body
Bidders & participating suppliers
1 commercial party on the notice- MJ Church (Plant) LtdAwarded supplier
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.