Published requirement descriptionThe University of East Anglia's Anatomy suite has been in operation for circa 20 years. It is HTA registered and during this period it has undergone 3 upgrades to ensure it was fit for
purpose and compliant, the last works being undertaken in 2013. It is currently sited within the Queens buildings and totals 335 m². To allow for a proposed expansion in Courses delivered and to meet new standards of "Chemical working exposure levels" set by both the EU and WHO, the existing suite requires redevelopment to meet its proposed needs.
- Increased numbers for Teaching,
- Additional courses provided
- Changes in technological teaching methods
- Changes to reflect Health and Safety legislation
- Changes in Embalming methods to reduce WEL levels for both staff and students.
The University has completed a feasibility study to determine the best solution / location for
this expansion. The study identified that the preferred option is The Edith Cavell Building on West Campus.
This contract award is for the Main Contractor to build the anatomy suite
CPV: Construction work
The lotProcurement structure
single lot · no lot value publishedLot #1Awarded
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
- Price
- Suitability
As set out in the procurement documents.
Procedure terms & legal framework
From the official record · publisher note attached- Procedure method
- Open procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- No (one-off requirement)
- First published
- 9 Feb 2024, 12:11 GMT
- Last source update
- 7 Aug 2024, 13:33 BST
- Award evaluation window
- 5 Apr 2024 – …
- Authority reference
PURCON2002- FTS notice number
2024/S 000-024864- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-0438c9Find a Tender
- Performance terms
As set out in the procurement documents.
- Review procedure
Th University will incorporate a minimum of 10 calendar days standstill period at the point the information on the award of contract is communicated to tenderers. If an appeal regarding the award of contract has not been successfully resolved, then the Public Contracts Regulations 2015 provide for aggrieved parties who have been harmed or are at risk of harm by breach of the rules to take action in the High Court. Any such action must be brought promptly and within the limitation period described in the Public Contracts Regulations 2015.
Publisher note: If you wish to express an interest and access the procurement documents, please visit In-Tend https://in-tendhost.co.uk/universityofeastanglia/aspx/Login
How it was run
Official notice- Submission deadline
- 5 Apr 2024, 12:00 BST
- Submission channel
- {"electronicSubmission"}
- Accepted languages
- en
- Bids opened
- 5 Apr 2024, 12:15 BST
Timeline
5 Apr 2024 → 7 Aug 2024 · 4 dates- Submission deadline5 Apr 2024, 12:00 BST
- Bids opened5 Apr 2024, 12:15 BST
- Contract starts28 May 2024, 00:00 BST
- Notice published7 Aug 2024, 13:33 BST
Notice history
1 event · 3 releases on Find a Tender- Status changed to complete10 Jul 2024, 14:08 BST
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| R.G. CARTER LIMITED | £4,040,467 † | — | Awarded |
| R.G. CARTER LIMITED | £4,684,261 † | — | Awarded |
Contracts
New Anatomy Suite, Edith Cavell Building · R.G. CARTER LIMITED
- Signed
- 8 Jul 2024
- Value
- £4,040,467
- Period
- … – 26 Aug 2025
- Status
- active
New Anatomy Suite, Edith Cavell Building · R.G. CARTER LIMITED
- Signed
- 8 Jul 2024
- Value
- £4,684,261
- Period
- … – 26 Aug 2025
- Status
- active
- Change Approval has been has been given to add the first floor shell, the value of the addition is £643,793.90. The modification was allowed for in the initial procurement documents. During the later stages of design development, the possibility for the need to further extend the building was explored and alternative designs were tabled. Following approval, the further Phases, which at the time did not have funding approval from UEA, were added to both the Planning Drawings which were subsequently approved, and to the tender documents for the initial phase of works. It was declared during the tender that there was a possibility that if funding became available either before start on site or during the works, the successful Contractor may be asked to negotiate a variation to include for the additional phase of works within the main Contract. The modification does not alter the overall nature of the contract and is not deemed to be a substantial modification within the meaning of paragraph 72(8) of the Public Contracts Regulations 2015. To retender this additional element of the work would not be proportionate and would cause substantial duplication of costs (b ii)., Need for additional works, services or supplies by the original contractor/concessionaire: The economic and technical reasons that prevent a change of contractor are as follows. The tight and constrained nature of the site making it impractical to have two contractors safely working in very close proximity. Continuity of design and warranty responsibilities as well as stakeholder engagement, is critical. The safe management of a site immediately next to the blue light emergency route for the Norfolk and Norwich University Hospital, would be compromised by a duplication of traffic to the site. There are potential programme gains if the extension is incorporated into the main works project which prevents both abortive works and significant abortive costs. Taking into account the reasons set out above, it is considered that from an economic, technical and programming perspective, the negotiation of the extra phase of works would be the most beneficial solution.
Bid statistics published by the authority
| Bids | SME | VCSE | Valid bid range |
|---|---|---|---|
| 3bids · 3 electronic | — | — | — |
Contracting authority & participating public bodies
Bidders & participating suppliers
1 commercial party on the notice- R G Carter LtdAwarded supplier
Official documents & specifications (2)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria