Official UK procurement notice
North Taunton and Oake Woolaway Refurbishment
Authority: Somerset West and Taunton Council (Local council)
What is being bought2 lots · detail below
Published requirement descriptionThis procurement is being conducted as an Open Procedure in compliance with Somerset
West and Taunton contract Standing Orders. The opportunity is being advertised via the
Procontract portal, Contracts Finder and the Find a Tender Service in compliance with
PCR2015 Procurement Regulations.
If an Applicant is bidding for both Lots, a completed set of tender documents must be submitted separately for each Lot.
At the conclusion of the Award stage, the intention is to award the Contract to one or two
Applicants for Lots 1 and 2.
Lot 1 Refurbishment of Woolaway Houses North Taunton – Phase E
Lot 2 Refurbishment of Woolaway Houses Oake
The Works comprise the complete refurbishment of the properties on the basis that all the
external walls, windows and doors are replaced; all roofing is stripped and re-laid; and a full
package of internal replacement and upgrading is provided all as shown and described on
the tender and contract drawings and the specifications
CPV: Building construction work · Construction work for multi-dwelling buildings and individual houses
Lots and requirements (2)Procurement structure
2 lots · no lot values published · win at most 2 of themLot #1Refurbishment of Woolaway Houses North Taunton – Phase E
The Works comprise the complete refurbishment of the properties on the basis that all the external walls, windows and doors are replaced; all roofing is stripped and re-laid; and a full package of internal replacement and upgrading is provided all as shown and described on the tender and contract drawings and the specifications.
The Works will be executed in Sections using the following parameters:
Section 1: Works to 4 Bodmin Road; 9, 25 & 27 Dorchester Road Date of Possession to be 4 calendar weeks after the signing of the JCT Contract. The Date for Completion to be 20 calendar weeks after the Date of Possession.
Section 2: Works to 17, 23, 33 & 35 Dorchester Road Date of Possession to be 2 weeks after the completion of Section 1. The Date for Completion to be 16 calendar weeks after the Date of Possession.
Lot #2Refurbishment of Woolaway Houses Oake
The Works comprise the complete refurbishment of the properties on the basis that all the external walls, windows and doors are replaced; all roofing is stripped and re-laid; and a full package of internal replacement and upgrading is provided all as shown and described on the tender and contract drawings and the specifications.
The Works will be executed in Sections using the following parameters:
Section 1: Works to 21, 23 and 24 Oake Close Date of Possession to be 4 calendar weeks after the signing of the JCT Contract. The Date for Completion to be 20 calendar weeks after the Date of Possession.
Section 2: Works to 17, 18 and 19 Oake Close Date of Possession to be 2 weeks after the completion of Section 1. The Date for Completion to be 16 calendar weeks after the Date of Possession.
Section 3: Works to 2, 3 and 4 Oake Close Date of Possession to be 2 weeks after the completion of Section 2. The Date for Completion to be 16 calendar weeks after the Date of Possession.
Section 4: Works to 25 Oake Close Date of Possession to be 2 weeks after the completion of Section 3. The Date for Completion to be 16 calendar weeks after the Date of Possession.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Procedure terms & legal framework
From the official record- Procedure method
- Open procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Closed
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- No (one-off requirement)
- First published
- 22 Jul 2022, 17:37 BST
- Last source update
- 21 Oct 2022, 15:22 BST
- Award evaluation window
- 25 Nov 2022 – …
- Authority reference
DN638595- FTS notice number
2022/S 000-029796- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-035509Find a Tender
How it was run
Official notice- Submission deadline
- 25 Nov 2022, 12:00 GMT
- Submission channel
- {"electronicSubmission"}
- Accepted languages
- en
- Bids opened
- 25 Nov 2022, 12:00 GMT
Timeline
21 Oct 2022 → 25 Nov 2022 · 3 dates- Notice published21 Oct 2022, 15:22 BST
- Submission deadline25 Nov 2022, 12:00 GMT
- Bids opened25 Nov 2022, 12:00 GMT
Notice history
1 event · 2 releases on Find a Tender- Deadline moved to 25 Nov 2022, 12:00 GMT21 Oct 2022, 15:22 BST+81 days · was 5 Sept 2022, 12:00 BST
Contracting authority & participating public bodies
Official documents & specifications