Official UK procurement notice
(NU/1661) Framework Agreement for the Provision of Surveying, Servicing Maintenance and Repair for LEV Systems
Authority: Newcastle University (Education)
What is being bought
Published requirement descriptionNewcastle University own and use multiple Local Exhaust Ventilation (LEV) systems such as fume hoods, Microbiological Safety Cabinets (MSCs) and numerous, often bespoke, systems including capture hoods and booths. The Control of Substances Hazardous to Health (COSHH) Regulations 2002 require LEV systems to undergo a thorough examination and test every 14 months by a competent person. To ensure regulatory compliance the University wishes to engage with a demonstrably competent supplier to assist with the management of our LEV systems by providing thorough examination and tests, fumigation and repair services including the provision of building-wide surveys and action planning. Testing is required in multiple buildings within the city centre campus and outlying sites including, but not limited to, the University farms at Cockle Park and Nafferton and the Dove Marine facility in Cullercoats (See Appendix 1 Campus Map and Appendix 2 Number of LEV). LEV systems are grouped by building but can also be grouped by the Unit (School/Institute/service) that owns and is responsible for the system(s). One building may house systems owned by multiple Units. End user contacts are assigned to each LEV system and this is based on the Unit to which the LEV belongs. The scope of the contract is to establish a framework agreement with one supplier appointed to deliver the entire service as described in the technical specification (Section 3). The supplier will be appointed based on the award criteria stated in Section 2.5. The chosen supplier will be required to carry out University-wide management of our LEV systems including servicing according to Regulation 9 of COSHH, repair, fumigation and building-wide surveys at the locations stated in Section 2.2 and appendix 2. Please note the numbers of LEV systems is subject to fluctuations. No warranties can be given as to the exact number of LEVs are to be serviced or fumigated each year. The management of our LEV systems includes whole scale management of the testing programme. Once provided with the details of LEV equipment, scope of works, locations and contacts the preferred contractor will manage the whole process to ensure the scope of works are completed.
CPV: Architectural, construction, engineering and inspection services · Inspection of ventilation system · Ventilation consultancy services
How this framework works
From the published notice- Places
- up to 1 suppliers · 2 bids received (2.0 per place) · 1 appointed (full)
The lotProcurement structure
single lot · value publishedLot #1To ensure regulatory compliance Newcastle University wishes to engage with a…AwardedRenewalPublished value£400,000
To ensure regulatory compliance Newcastle University wishes to engage with a demonstrably competent supplier to assist with the management of our LEV systems by providing thorough examination and tests, fumigation and repair services including the provision of building-wide surveys and action planning.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published award criteria (2)
- Quality: 60
- Price: 40
- Price carries 40 of 100 points: a 10% discount moves about 4 points. The method statement decides this lot, not the discount.
- “(NU/1661) Framework Agreement for the Provision of Surveying,…” is a framework: the contest is a place on its panel, up to 1 suppliers, not a single contract.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record- Procedure method
- Open procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Services
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- No (one-off requirement)
- First published
- 11 May 2021, 14:17 BST
- Last source update
- 18 Aug 2021, 13:46 BST
- Award evaluation window
- 15 Jun 2021 – …
- Authority reference
DN543053- FTS notice number
2021/S 000-020202- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-02af97Find a Tender
- Review procedure
Newcastle University will incorporate a minimum 10 calendar day standstill period at the point information on the award of the contract is communicated to tenderers. This period allows unsuccessful tenderers to seek further debriefing before the contract is entered into. Applicants have 2 working days from notification of the award decision to request additional debriefing and 4 / 4 that information has to be provided a minimum of 3 working days before expiry of the standstill period. Such additional information should be requested from the address referred to in part 1.1 above. If an appeal regarding the award of a contract has not been successfully resolved, the Public Contracts Regulations 2015 provide for aggrieved parties who have been harmed or are at risk of harm by a breach of the rules to take action in the High Court (England, Wales and Northern Ireland). Any such action must be brought promptly. Where a contract has not been entered into the Court may order the setting aside of the award decision or order the authority to amend any document and may award damages. If the contract has been entered into the Court may only award damages
How it was run
Official notice- Appointment period ends
- 15 Jun 2021, 12:00 BST
- Submission channel
- {"electronicSubmission"}
- Accepted languages
- en
- Bid validity
- 90 days from the deadline
- Bids opened
- 15 Jun 2021, 14:00 BST
Timeline
15 Jun 2021 → 18 Aug 2021 · 3 dates- Admission / appointment period endsperiod end, not a bid countdown15 Jun 2021, 12:00 BST
- Bids opened15 Jun 2021, 14:00 BST
- Notice published18 Aug 2021, 13:46 BST
Notice history
1 event · 2 releases on Find a Tender- Status changed to complete18 Aug 2021, 13:46 BST
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast1 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.
Contracts
Framework Agreement for the Provision of Surveying, Servicing, Maintenance and Repair for LEV Systems
- Signed
- 2 Aug 2021
- Value
- —
- Status
- active
Bid statistics published by the authority
| Lot | Bids | SME | VCSE | Valid bid range |
|---|---|---|---|---|
| To ensure regulatory compliance Newcastle University wishes to engage with a… | 2bids · 2 electronic | 2 | — | £250,000 – £400,000 |
| Whole notice | — | — | — | £250,000 – £400,000 |
Contracting authority & participating public bodies
Framework contractors & participating bidders
1 commercial party on the notice- Holiday Fielding Hocking LtdFramework contractor
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.