Find a TenderPast planning noticePreliminary market engagement notice
Published 21 May 2025, 14:42 BST

Official UK procurement notice

Power Plant Repair and Maintenance Framework

Official notice

Authority: Docklands Light Railway Limited (Public body)

Framework agreementServicesSME suitableVCSE suitable
Planned pipeline valueValue not publishedpipeline notice, not a live tender
Tender notice expected 1 Oct 2025from the planned procurement notice
Framework period 4 yrsends 30 Mar 2030 · up to 30 Mar 2034 with extensions · starts 31 Mar 2026

What is being bought

Published requirement description

Transport for London (TfL) is issuing a preliminary market engagement notice to obtain market feedback in relation to the supply of Repair and Maintenance Services across a range of Power Plant activities for the Asset Performance Directorate TfL business unit by issuing a Market Sounding Questionnaire (MSQ).

The primary focus of the MSQ is to better understand the market, supplier appetite, capacity, and capability, as well as perceived risks and opportunities. The engagement will also provide feedback and help to develop the lotting strategy for the framework.

The purpose of the framework is to support the area within TfL, by allowing services to be competed through the framework, ensuring value for money for TfL.

TfL envisage that the framework will be an open framework which will be reopened and to competition during the life of the framework, however this could change following feedback from the market and TfL reserve the right to change our procurement approach.

Full details of the MSQ and how to engage in the process can be found in the notice below.

Lots covered under this framework include:

  • London Underground: Transformer In-service unit repair, refurbishment/rebuild and on-site fault diagnostics.

Rectifier transformers - ABB 1580KVA & 2140KVA & Auxiliary transformers - ABB 800KVA 500KVA.

•Substation High Voltage, Low Voltage and Direct Current switchgear repair, refurbishment and replacement.

•High Voltage Power Third Party Support Services

•Substation battery and charger systems

CPV: Repair and maintenance services

How this framework works

From the published notice
Framework period
4 yrs · up to 8 yrs from 31 Mar 2026

The lotProcurement structure

single lot · no lot value published
Lot #1PlannedRenewal 4 yrsSMEVCSE
Contract period: 31 Mar 2026 – 30 Mar 2030 (4 yrs) · up to 30 Mar 2034 with extensions
Delivery: LondonEligibility: SME eligibleVCSE eligible
Extensions: Extension options published

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
What this means for your bid
  • “Power Plant Repair and Maintenance Framework” is a framework: the contest is a place on its panel, not a single contract.

Procedure terms & legal framework

From the official record
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Services
Notice status
Past planning notice
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
21 May 2025, 14:42 BST
Last source update
19 Jun 2025, 15:57 BST
Authority reference
WS2501391626
FTS notice number
2025/S 000-033804
Latest notice
Preliminary market engagement notice (UK2)
Classification (CPV)
Repair and maintenance services
Delivery area
London (UKI)
Official registry OCID
ocds-h6vhtk-051b1f Find a Tender

How it was run

Official notice
Appointment period ends
—

Timeline

21 May 2025 → 31 Mar 2026 · 5 dates
  1. Planning notice published
    21 May 2025, 14:42 BST
  2. Latest notice published
    19 Jun 2025, 15:57 BST
  3. Market engagement
    18 Jul 2025, 23:59 BST

    TfL invites suppliers to participate in this Preliminary Market Engagement exercise by completing an Market Sounding Questionnaire (MSQ). All feedback received will be treated confidentially and will help to shape the upcoming procurement opportunity.

    Information on the engagement process and the procurement can be found in MSQ documents which will be emailed to interested suppliers.

    The engagement process consists of the following key steps:

    1. Registering Interest - Suppliers who wish to participate should express their interest by emailing powerplantrepairandmaintenance@tfl.gov.uk and quoting 'Power Plant Repair and Maintenance Framework - Registering MSQ interest'.
    2. Review and complete the MSQ document.
    3. Email the completed MSQ document back to powerplantrepairandmaintenance@tfl.gov.uk before the deadline of 17:00 on Friday 18th July 2025.

    TfL reserve the right to hold 1-2-1s with suppliers following the submission of the MSQs.

    If you have any questions about the process, please do not hesitate to get in touch with Tamsyn Busby and Davina Alvares at powerplantrepairandmaintenance@tfl.gov.uk.

    We look forward to hearing from you.

  4. Tender notice expected391 days ago
    1 Oct 2025, 23:59 BST
  5. Contract starts211 days ago
    31 Mar 2026, 00:00 BST

Notice history

2 events · 2 releases on Find a Tender · since 21 May 2025
  1. Pipeline notice published
    21 May 2025, 14:42 BST
    UK1
  2. Preliminary market engagement notice published
    19 Jun 2025, 15:57 BST
    UK2

Commercial outcome & contract awards

Pipeline notice
Awards (0)
No award published
Contracts (0)
No contract published
Bid statistics
No aggregate bid statistics published

Contracting authority & participating public bodies

Transport for London

Contracting authorityPublic authority - central government GB-PPON: PHMT-6197-NWNZ 5 Endeavour Square, London, London, E20 1JNContact name, email

Official documents & specifications (2)

Official links; attachments are not copied

Notices published for this procedure