Find a TenderAwarded
Published 29 Sept 2026, 09:49 BST

Official UK procurement notice

Provision of Data Network Core Switch Replacements (Black Diamonds) plus Support and Maintenance

Official notice

Authority: Isle of Wight NHS Trust (Central government)

Framework agreementGoods
Framework ceiling (notional)Value not publishedframework ceiling, not attributable revenue
Awarded 31 Jul 2023
Framework period 5 yrsends 31 Jul 2028 · starts 1 Aug 2023

What is being bought

Published requirement description

No description was published on the notice. See the official documents.

CPV: IT services: consulting, software development, Internet and support · Installation services (except software) · Radio, television, communication, telecommunication and related equipment · Technical services

How this framework works

From the published notice
Framework period
5 yrs from 1 Aug 2023, 3 years initial term contract and 1+1 year extension.

The lotProcurement structure

single lot · no lot value published
Lot #1Provision of Data Network Core Switch Replacements (Black Diamonds) plus Support and Maintenance 5 yrs

The provision of Data Network Core Switch Replacements (Black Diamonds) plus support and maintenance and licenses.

  1. (a) Data Network Core Switch replacements
  2. (b) Support, Maintenance and Licenses (S/M/L) will commence after installation and acceptance testing milestone sign off. This will start the S/M/L element of the contract for the Data Network Core Switch replacements. The initial term of the S/M/L contract will be 3 years from the date of the acceptance testing milestone sign off.
  3. Existing Equipment Support and Maintenance (S/M) and any required Licenses (one off or ongoing). To clarify, this element of the contract will have a separate start/end date to the S/M/L contract that will be in place for (1) above.

The initial term of the contract will be three years for (1) above once the Installation Phase is completed. The initial term of the contract will be three years for (2) above from the start date of the contract.

Both elements of the contract (1) and (2) can be extended by up to 24 months in 2 x 12 month segments, at the sole discretion of the Authority. The contract price may be increased by no more than the rate of CPI at the time of the new contract year commencing.

The procurement was carried out via further competition under the Crown Commercial Services (CCS) Network Services Framework RM3808 Lot 2.

Please note that the contract value is the expected whole life value of the contract (3+1+1 years) acknowledging that CPI for years 4 and 5 - if taken - is unknown at this stage. Please also note that the contract type stated is services but there is an element of Products too for 1(a) as set out in the description above re replacement equipment. Also please note that 1(a) is for the replacement Data Network Core Switches equipment and 1(b) is for the ongoing S/M/L contract that will be in place for the replacement equipment which will begin once the Installation Phase is completed. The initial term of the contract will be three years for (1) once the Installation Phase is completed. For (2) - Existing Equipment Support and Maintenance (S/M) and any required Licenses, this element of the contract will have a separate start/end date. The initial term of the contract for (2) will be three years from the start date of the contract. Both elements of the contract (1) and (2) can be extended by up to 24 months in 2 x 12 month segments, at the sole discretion of the Authority. The contract price may be increased by no more than the rate of CPI at the time of the new contract year commencing. Contract award date and start date are both 01 August 2023 however this had to be set out as start date of 02 August 2023 for the purposes of the form. Note - is a mix of supplies and services.

Contract period: 1 Aug 2023 – 31 Jul 2028 (5 yrs)
Delivery: South East

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
What this means for your bid
  • “Provision of Data Network Core Switch Replacements (Black Diamonds)…” is a framework: the contest is a place on its panel, not a single contract.

Procedure terms & legal framework

From the official record
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Goods
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
29 Sept 2026, 09:49 BST
Last source update
29 Sept 2026, 09:49 BST
Authority reference
DN663244
FTS notice number
2026/S 000-091670
Classification (CPV)
IT services: consulting, software development, Internet and supportInstallation services (except software)Radio, television, communication, telecommunication and related equipmentTechnical services
Delivery area
South East (UKJ34)
Official registry OCID
ocds-h6vhtk-077c0b Find a Tender

How it was run

Official notice
Appointment period ends
—

Timeline

1 Aug 2023 → 29 Sept 2026 · 2 dates
  1. Contract starts
    1 Aug 2023, 00:00 BST
  2. Notice published28 days ago
    29 Sept 2026, 09:49 BST

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast

1 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.

Contracts

  • Contract 091670-2026-1-1

    Signed
    31 Jul 2023
    Value
    £209,176
    Period
    1 Aug 2023 – 31 Jul 2028
    Status
    active
    • Change (1) The contract will co-term on 31 January 2027 (previously there were 2 start and end dates, one relating to existing support, one relating to new; the original end date for the existing support was 31 July 2026. Both will extend from 01 February 2027). (2) The extension provision will be a three year extension from 01 February 2027 to 31 January 2030 instead of the two year extension originally set out., Need for additional works, services or supplies by the original contractor/concessionaire: Initial Term cost: £158,175.85 - Duration 3 years Anticipated WLC (incl 2 year potential ext): (2 x £26,671.30 = £53,342.60) £211,518.45 for 5 years Revised WLC: £158,175.85 + £51,000 = £209,175.85 for 6 years The change from this is the duration, due to the benefit of the costs as set out above. Given the financial benefit to the 3-year extension, we rely on 72(1) (b) For additional works, services, or supplies by the original contractor that have become necessary and where a change of supplier is unviable due to economic or technical reasons.

Contracting authority & participating public bodies

Isle of Wight Council

Contracting authorityCentral Government County Hall, High Street, Newport, South East, PO30 1UDContact name, email, phone

Dispute resolution & review bodies

  • The High Court of England and WalesReview body London

Framework contractors & participating bidders

2 commercial parties on the notice

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.