Official UK procurement notice
Provision of Flexible & Temporary Workforce (3 Lots) Highways Day to Day Operatives; Drainage Work - Excavations; Drainage Work - High Pressure Jetting
Authority: BLACKPOOL COUNCIL (Local council)
What is being bought3 lots · detail below
Published requirement descriptionBlackpool Council is looking to appoint 3 ranked contractors on a framework (per lot) to supply skilled and trained operatives on a flexible and temporary basis to support the existing in-house team to deliver various works across the town.
- Lot 1 Highways Day to Day Operatives – General maintenance of Highways and Public Realm.
- Lot 2 Drainage Works – Excavation. Repairs to the Council’s drainage infrastructure, collapsed sewers, gully replacement and all other associated maintenance of the Council’s drainage assets.
- Lot 3 Drainage works - High Pressure Jetting, de-silting, CCTV investigations, root cutting of the Councils drainage assets up to 1,200mm diameter
This contract covers day shifts for highways day to day maintenance. Overtime and weekend working may be a requirement.
The framework will operate between 1st April 2025 and 31st March 2027 with an option to extend for 1 year plus a further 1 year.
CPV: Repair and maintenance services · Repair, maintenance and associated services related to roads and other equipment
How this framework works
From the published notice- Bids received
- 11 bids on the busiest of 3 lots · 9 suppliers appointed
Lots and requirements (3)Procurement structure
3 lots · no lot values published · same evaluation weights on every lotLot #1Provision of Flexible & Temporary Workforce (3 Lots) Highways Day to Day OperativesAwardedRenewal
Lot 1 - Highways Day to Day Operatives - General maintenance of the Highway & Public Realm
The intention is to carry out various aspects of the work e.g. laying block paving, kerbs, flagstones, general maintenance of highways assets. Laying tarmac/reinstating potholes. This work can take place across the town.
Typical duties will include:
- Tarmac Laying
- Concrete Laying
- Kerbing, Flagging and Blocking
- Maintenance and repair of Highway Related Assets
- Work on own or as part of a multi-disciplinary team
Lot #2Provision of Flexible & Temporary Workforce Drainage Work - ExcavationsAwardedRenewal
Lot 2 - Drainage Work - Excavations
The intention is to investigate, identify, repair and record excavations onto Highways and other public sewers. This work can take place across the town.
Typical duties will include:
- Excavation in made/unmade ground to locate and repair defective pipework
- Connection of various sized pipes in varying materials
- Backfill and reinstatement of the excavation
- Record and submit detailed report of the repair
Drainage digs require a suitable wagon for tools and spoil along with a mini-excavator.
Lot #3Provision of Flexible & Temporary Workforce Drainage Work - High Pressure JettingAwardedRenewal
Lot 3 - Drainage Work –High Pressure Jetting
The intention is to investigate, identify, repair and record cctv surveys along with a detailed video report onto Highways and other sewers. This work can take place across the town.
Maintenance of other assets by means of de-silting (up to 1,200mm diameter as well as pumping station wet wells), root cutting of sewers, various diameters.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published award criteria (3)
- Quality: 30
- Social Value: 20
- Price: 50
- Staff
- Names and qualifications of delivery staff must be submitted
- Price carries 50 of 100 points: a 10% discount moves about 5 points. This one is won on the number: sharpen the price before polishing the prose.
- “Provision of Flexible & Temporary Workforce (3 Lots) Highways Day to…” is a framework: the contest is a place on its panel, not a single contract.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record- Procedure method
- Open procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Services
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- No (one-off requirement)
- First published
- 18 Dec 2024, 09:53 GMT
- Last source update
- 24 Apr 2025, 16:50 BST
- Award evaluation window
- 31 Jan 2025 – …
- Authority reference
DN755706- FTS notice number
2025/S 000-016873- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-04c8faFind a Tender
How it was run
Official notice- Appointment period ends
- 31 Jan 2025, 10:00 GMT
- Submission channel
- {"electronicSubmission"}
- Accepted languages
- en
- Bids opened
- 31 Jan 2025, 10:00 GMT
Timeline
31 Jan 2025 → 24 Apr 2025 · 3 dates- Admission / appointment period endsperiod end, not a bid countdown31 Jan 2025, 10:00 GMT
- Bids opened31 Jan 2025, 10:00 GMT
- Notice published24 Apr 2025, 16:50 BST
Notice history
1 event · 2 releases on Find a Tender- Status changed to complete24 Apr 2025, 16:50 BST
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast9 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.
Contracts
Provision of Flexible & Temporary Workforce Drainage Work - Excavations
- Signed
- 11 Mar 2025
- Value
- —
- Status
- active
Provision of Flexible & Temporary Workforce Drainage Work - Excavations
- Signed
- 11 Mar 2025
- Value
- —
- Status
- active
Provision of Flexible & Temporary Workforce Drainage Work - Excavations
- Signed
- 11 Mar 2025
- Value
- —
- Status
- active
Provision of Flexible & Temporary Workforce Drainage Work - High Pressure Jetting
- Signed
- 11 Mar 2025
- Value
- —
- Status
- active
Provision of Flexible & Temporary Workforce Drainage Work - High Pressure Jetting
- Signed
- 11 Mar 2025
- Value
- —
- Status
- active
Provision of Flexible & Temporary Workforce Drainage Work - High Pressure Jetting
- Signed
- 11 Mar 2025
- Value
- —
- Status
- active
Provision of Flexible & Temporary Workforce Highways Day to Day Operatives;
- Signed
- 4 Mar 2025
- Value
- —
- Status
- active
Provision of Flexible & Temporary Workforce Highways Day to Day Operatives;
- Signed
- 4 Mar 2025
- Value
- —
- Status
- active
Provision of Flexible & Temporary Workforce Highways Day to Day Operatives;
- Signed
- 4 Mar 2025
- Value
- —
- Status
- active
Bid statistics published by the authority
| Lot | Bids | SME | VCSE | Valid bid range |
|---|---|---|---|---|
| 1 · Provision of Flexible & Temporary Workforce (3 Lots) Highways Day to Day Operatives | 6bids · 6 electronic · 6 from abroad | 5 | — | £1 – £1,000,000 |
| 2 · Provision of Flexible & Temporary Workforce Drainage Work - Excavations | 7bids · 7 electronic · 7 from abroad | 6 | — | £1 – £800,000 |
| 3 · Provision of Flexible & Temporary Workforce Drainage Work - High Pressure Jetting | 11bids · 11 electronic · 11 from abroad | 9 | — | £1 – £400,000 |
| Whole notice | — | — | — | £1 – £2,200,000 |
Contracting authority & participating public bodies
Dispute resolution & review bodies
- High Court JusticeReview body
Framework contractors & participating bidders
9 commercial parties on the notice- Bethell Construction LimitedFramework contractor
- Bethell Group plcFramework contractor
- Clearway Drainage Systems LimitedFramework contractor
- LARKINS ENVIRONMENTAL SERVICES LIMITEDFramework contractor
- Lanes Group LimitedFramework contractor
- Toman Contracting LimitedFramework contractor
- Ventbrook LtdFramework contractor
- W. H. Tarmacadam limitedFramework contractor
- Water Saving Techniques LtdFramework contractor
Official documents & specifications (1)
Official links; attachments are not copiedTender pack and attachments
- Technical selection criteria