Replacement of Steam Boilers

Authority: MHRA (Central government)

WorksOpen procedureAbove threshold
Sectors: Industrial machinery (42)Construction & Civil Engineering (45) Delivery: Delivery location not published
Published estimate£5,833,333≈ £4.7m / year · £7,000,000 inc. VAT
Submission deadline 20 Nov 202616:00 GMT · 24 days left
Clarification cut-off 16 Oct 202617:00 BST · questions to the authority
Contract term 1 yr 3 moends 10 Apr 2028 · starts 11 Jan 2027

What is being bought

Published requirement description

MHRA invites tenders for the detailed design, supply, installation, testing, commissioning and handover of replacement steam-boiler systems at MHRA Laboratories, Blanche Lane, South Mimms, Potters Bar, Hertfordshire EN6 3QG. The contract will be awarded to the supplier submitting the most advantageous tender in accordance with the published award criteria and assessment methodology in this ITT.

The works form South Mimms Electric Steam Boiler Project and are intended to replace three existing individual 3,900 kg/h gas-fired steam boilers with two individual 3,000 kg/h electric steam boilers, together with the associated mechanical, electrical, controls, building, civil and enabling works. The site is a live operational medical-research facility. Maintaining safe operations, continuity of steam, electrical resilience and controlled access is fundamental to the delivery approach.

The objectives are;

  • deliver a safe, coordinated and maintainable replacement steam-boiler installation without unacceptable disruption to the live site;
  • secure a technically credible design and executable programme covering design, enabling works, installation, testing, commissioning and handover;
  • obtain a transparent and comparable activity-schedule price under NEC3 ECC Main Option A;
  • allocate interface, access, electrical-capacity, continuity and commissioning risks clearly;
  • secure measurable social-value commitments relevant to the contract and local delivery; and
  • appoint a contractor capable of collaborative NEC delivery, disciplined change control and complete handover.

CPV: Boiler installation work · Boiler installations · Electrical engineering installation works · Mechanical engineering installation works

The lotProcurement structure

single lot · value published
Lot #1 1 yr 3 moPublished value£5,833,333
Contract period: 11 Jan 2027 – 10 Apr 2028 (1 yr 3 mo)Value: £5,833,333 exc. VAT · £7,000,000 inc. VAT
Turnover guideline: ~£9,339,303/yr≈ 2× annual value
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    Suppliers must first register, and if already registered, login to the MHRA Atamis Health Family Portal. atamis-1928.my.salesforce.com ↗

    Suppliers must read the Supplier Instruction and sign the NDA - attached in Atamis - Project Ref C458575 - Replacement of Steam Boilers.

    When access to the documentation is provided then:

    Confirm annual turnover for the latest available year exceeds £14m.

    Property damage and third-party liability £10,000,000 for any one event.

    Death or bodily injury to Contractor’s employees £10,000,000 for any one event.

    The minimum limit of indemnity for Professional Indemnity Insurance is £10,000,000 for each and every claim.

    The insurance shall be maintained for a period of 12 years from Completion of the whole of the works.

    Insurance of the works, Plant and Materials

    Full reinstatement value in accordance with the NEC3 Insurance Table, subject to confirmation of who provides each insurance and applicable deductibles.

  • Technical & professional ability

    Must hold the following standards or equivalents:

    ISO 9001

    ISO 14001

    ISO 45001

Who is likely to bid for this lot ↓

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids are scored
Quality: 60%Price: 30%Social value: 10%
Published sub-criteria (11)
  • Relevant live-site experience: 5%
  • Design and technical solution: 15%
  • Safety permits and logistics: 10%
  • Programme and resources: 10%
  • Continuity and resilience: 8%
  • Testing and commissioning: 5%
  • Handover training and asset information: 3%
  • Warranty and response support: 2%
  • Added value: 2%
  • Price: 30%
  • Social value: 10%
Published award criteria (11)
  • Relevant live-site experience: How directly relevant experience and lessons will be applied by the proposed team to this contract.
  • Design and technical solution: Completeness, integration and compliance of the proposed multidisciplinary design and delivery solution.
  • Safety permits and logistics: Control of construction, operational, access, lifting, permit and live-site risks.
  • Programme and resources: Credibility of the integrated programme, critical path, resources and delivery controls.
  • Continuity and resilience: Protection of steam continuity and operational resilience through transition and commissioning.
  • Testing and commissioning: Completeness of inspection, testing, commissioning, proving and acceptance arrangements.
  • Handover training and asset information: Quality and completeness of handover, training and operational information.
  • Warranty and response support: Responsiveness and effectiveness of warranty and post-completion support.
  • Added value: Relevant, deliverable improvement beyond the minimum requirement without transferring unpriced risk to MHRA.
  • Social value: Relevant and measurable social, economic and environmental value arising from contract delivery.
  • Price: Total price of activities listed in the Activity Schedule.
Conditions of participation2
  • Economic & financial standing

    Suppliers must first register, and if already registered, login to the MHRA Atamis Health Family Portal. atamis-1928.my.salesforce.com ↗

    Suppliers must read the Supplier Instruction and sign the NDA - attached in Atamis - Project Ref C458575 - Replacement of Steam Boilers.

    When access to the documentation is provided then:

    Confirm annual turnover for the latest available year exceeds £14m.

    Property damage and third-party liability £10,000,000 for any one event.

    Death or bodily injury to Contractor’s employees £10,000,000 for any one event.

    The minimum limit of indemnity for Professional Indemnity Insurance is £10,000,000 for each and every claim.

    The insurance shall be maintained for a period of 12 years from Completion of the whole of the works.

    Insurance of the works, Plant and Materials

    Full reinstatement value in accordance with the NEC3 Insurance Table, subject to confirmation of who provides each insurance and applicable deductibles.

  • Technical & professional ability

    Must hold the following standards or equivalents:

    ISO 9001

    ISO 14001

    ISO 45001

What this means for your bid
  • Price carries 30 of 100 points: a 10% discount moves about 3 points. The method statement decides this lot, not the discount.
  • Turnover usually expected at this size: about £9,339,303 (twice the annual value).

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula. Turnover is an indicative market norm (≈2× annual value), not a published condition.

Competition analysis · published record, not a forecast of who will bid

How MHRA buys Boiler installations (CPV 4216), and who usually turns up

MHRA’s published record next to the market for the same work. Frameworks and DPS are left out: they draw different bid counts. Whole-market view: Boiler installations (CPV 4216) →

1

How the contest usually goes

Winner shares use published awards; bid and price charts use contested lots.

Question for the bid
This buyerMHRA · all categories
What to do with it
How often do SMEs win?
i

How often small and medium firms win.

Share of awards where the winner’s size is known.

The counts under this question show how many awards have a known supplier size.

Last 36 months.

Buyer: 10 of 35 known-size awards · market: CPV 4216 · UK-wide, n=27
29%74%

Small firms have won here. Neither number says whether you qualify; it describes who has been winning.

How often do local suppliers win?
i

How often local firms win similar work.

Winners with a registered address in the delivery region, out of awards with a known address.

Local means the winner is registered in the region where that award was delivered. The market figure counts awards delivered in Greater London (authority’s region).

A local branch does not count if the registered address is elsewhere.

Last 36 months.

Buyer: 3 of 13 known-location awards · market: CPV 4216 · Greater London (authority’s region), n=8
23%0%

Most of this buyer’s recorded winners were registered outside the region where that award was delivered.

How long to a decision?
i

How long buyers here take to decide after bids close.

Middle value in days from the bid deadline to the award date, on competitions that published both.

Only decided tenders count, so slow ones still waiting are not in.

Last 36 months.

Buyer: 20 decided notices · market: CPV 4216 · UK-wide, n=6
37 days27 days

Half of these awards have an award date within 37 days of the bid deadline.

How often single-bid or direct?
i

How often work is awarded with no recorded rival.

Direct awards and tenders where every published lot count shows one bid.

Both shares are minimums: some awards have no bid count.

Thin markets produce this too; it is not proof of a tailored specification.

Last 36 months.

Buyer: at least 32 of 54 procurements with awards had no recorded rival · market: CPV 4216 · Greater London (authority’s region), n=9
59%33%

Direct awards or one recorded bid are common here. Check the route before spending time on a bid.

How many bids did past lots attract?

i

How many bids past lots received.

Each colour is a bid-count range. Only competed lots with a published count are included.

Past bids do not predict this tender.

Last 36 months.

This buyer21 lots with bid counts · all categories
43% had one bid
The market8 lots with bid counts · CPV 4216 · UK-wide
0% had one bid
Buyer / market · select a colour for counts
1 bid43% / 0%
Buyer: 9 of 21 lots with published bid counts. Market: 0 of 8 lots with published bid counts.
2–324% / 25%
Buyer: 5 of 21 lots with published bid counts. Market: 2 of 8 lots with published bid counts.
4–624% / 25%
Buyer: 5 of 21 lots with published bid counts. Market: 2 of 8 lots with published bid counts.
7+10% / 50%
Buyer: 2 of 21 lots with published bid counts. Market: 4 of 8 lots with published bid counts.

How did awards compare with estimates?

i

Where winning prices landed against estimates.

Each colour shows awards below, close to or above the published estimate, one lot at a time.

Past prices are a guide, not a bid price.

Last 36 months.

This buyer11 lots with estimate and award · all categories
45% below estimate
The market9 lots with estimate and award · CPV 4216 · UK-wide
56% below estimate
Buyer / market · select a colour for counts
Below estimate45% / 56%
Buyer: 5 of 11 lots with an estimate and award. Market: 5 of 9 lots with an estimate and award.
Within ±2%18% / 11%
Buyer: 2 of 11 lots with an estimate and award. Market: 1 of 9 lots with an estimate and award.
Above estimate36% / 33%
Buyer: 4 of 11 lots with an estimate and award. Market: 3 of 9 lots with an estimate and award.
2

Assess each lot
i

What past awards tell you about each lot.

See the forecast, this buyer’s earlier suppliers and firms with relevant wins.

No supplier is confirmed as a bidder.

Open a lot for its forecast, this buyer’s previous supplier and possible competitors, from published award history, not a bid list

Lot #1CPV 453315 monthsPublished estimate£5.8m

This lot is listed as CPV 4533. The table above uses the notice category.

Expected competition
i

How many bids this lot may attract.

The forecast uses similar past competitions. The bar shows either that forecast or past bid counts; the line below says which.

Each lot shows its own forecast based on its own category; forecasts for different lots of the same notice are not comparative.

A forecast, not a list of bidders.

2expected bids35% chance of a single bid
similar past contests in this category: 2
Forecast chances for this lot
1 bid35%
Chance this lot gets 1 bid: 35%. This is a forecast.
2–325%
Chance this lot gets 2–3: 25%. This is a forecast.
4–634%
Chance this lot gets 4–6: 34%. This is a forecast.
7+5%
Chance this lot gets 7+: 5%. This is a forecast.
Commercial price forecast
i

Where the award price may land.

The forecast uses similar awards and the buyer’s estimate. The band covers the middle half of likely prices.

Based on 1 comparable award. Each lot reflects its own category; forecasts for different lots of the same notice are not comparative.

A statistical guide from past awards, not a price to bid.

£5.7m3% below estimate
1 comparable award
Forecast compared with the buyer’s estimate
Middle 50%£5.4m–£5.8m
Half of likely prices fall between £5,446,865 and £5,833,333.
Estimate£5.8m
The buyer published an estimate of £5,833,333 for this lot.
A 25% chance the award lands exactly on the estimate.

Who has supplied this buyer on similar work?
i

Who has done similar work for this buyer.

Past contracts are matched by buyer, title and type of work.

A past supplier may not bid again.

No earlier contract of this buyer matches this lot on the published record.

Who could compete for this lot?
i

Who could compete for this lot?

Firms with relevant past wins. On a framework, we show firms on that agreement.

None is confirmed as a bidder.

SupplierWon in this categoryLive contractsAward vs estimate
£1.2m11 awards in 36m · last 2 months ago2 live · £545k
i

Public contracts this supplier still holds.

Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book.

Unexpired says nothing about spare capacity.

no comparable pairs
£395k3 awards in 36m · last 3 months ago1 live · £77k
i

Public contracts this supplier still holds.

Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book.

Unexpired says nothing about spare capacity.

13% below n=2
£1.9m8 awards in 36m · last 9 months ago5 live · £4.8m
i

Public contracts this supplier still holds.

Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book.

Unexpired says nothing about spare capacity.

17% below n=3
£23k3 awards in 36m · last 1 month ago1 live · £45k
i

Public contracts this supplier still holds.

Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book.

Unexpired says nothing about spare capacity.

no comparable pairs
£2.0m15 awards in 36m · last 2 months agoNone on fileno comparable pairs
About this data
  • Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
  • Two views, kept apart. The authority’s own track record and the wider market for the same kind of work sit side by side and are never mixed. Where the local picture is too thin, a figure widens to a broader market and says which one it used.
  • Forecasts are labelled. The price forecast and its range, possible competitors and the earlier-work matches are our estimates from past awards: not published facts, not win chances and not price advice. Official notices do not say who is bidding.
  • Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.

Procedure terms & legal framework

From the official record
Procedure method
Open procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Works
Notice status
Open for tender
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
12 Oct 2026, 14:40 BST
Last source update
12 Oct 2026, 14:40 BST
Award evaluation window
Submission end – 11 Jan 2027
Authority reference
C458575
FTS notice number
2026/S 000-096140
Latest notice
Tender notice (UK4)
Classification (CPV)
Boiler installation workBoiler installationsElectrical engineering installation worksMechanical engineering installation works
Delivery area
Not published
Official registry OCID
ocds-h6vhtk-0785be Find a Tender
Contract terms summary

30 Days

How to participate & submission route

Official notice Submit via Atamis (Health Family)
Submission portal named on this notice: Atamis (Health Family) · Who buys & how to bid on Atamis
Supplier login requiredElectronic submission allowedLanguage: EN
Access & registration note: Free · one account PER buying organisation portal · password resets come "from Salesforce.com" (check spam)
Requests to participate (first stage)
—
Tender submission deadline
20 Nov 2026, 16:00 GMT
Clarification deadline
16 Oct 2026, 17:00 BST
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release
Published estimate £5,833,333 excludes VAT (£7,000,000 including VAT).

Timeline

12 Oct 2026 → 11 Jan 2027 · 5 dates
  1. Tender notice published15 days ago
    12 Oct 2026, 14:40 BST
  2. Clarification questions by10 days ago
    16 Oct 2026, 17:00 BST
  3. Today
    27 Oct 2026
  4. Submission deadlinein 24 days
    20 Nov 2026, 16:00 GMT
  5. Contract startsin 75 days
    11 Jan 2027
  6. Award decision expected byin 76 days
    11 Jan 2027, 23:59 GMT

Notice history

1 event · 1 release on Find a Tender
  1. Tender notice published
    12 Oct 2026, 14:40 BST
    UK4

Commercial outcome & contract awards

Nothing awarded yet
Awards (0)
No award published
Contracts (0)
No contract published
Bid statistics
No aggregate bid statistics published

Contracting authority & participating public bodies

MHRA

Contracting authorityPublic authority - central government GB-PPON: PJLJ-9824-VXPG 10 South Colonnade, Canary Wharf, London, London, E14 4PUContact email

Official documents & specifications (2)

Official links; attachments are not copied

Tender pack and attachments

  • Bidding documents and specifications tenderBidding documents and specificationsDOCXSupplier are required to sign a Non-Disclosure Agreement before access to the tender documents can be provided.

Notices published for this procedure

  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender