Official UK procurement notice
Wightfibre Circuits - County Hall Datacentre
Authority: Isle of Wight NHS Trust (Central government)
What is being bought
Published requirement description2 x 500Mbps direct internet connections at County Hall datacentre
CPV: IT services: consulting, software development, Internet and support · Software package and information systems
The lotProcurement structure
single lot · no lot value publishedLot #12 x 500Mbps direct internet connections at County Hall datacentre:
2 x 500Mbps direct internet connections at County Hall datacentre:
(i) July 2024 - 2025 (with 12m extension possible to July 2026)
(ii) December 2024 - 2025 (with 12m extension possible to December 2026)
Cost includes whole life cost (12m + 12m) for both.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published award criteria (2)
- Quality: 50
- Price: 50
- Price carries 50 of 100 points: a 10% discount moves about 5 points. This one is won on the number: sharpen the price before polishing the prose.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record- Procedure method
- Negotiated without publication of a contract notice
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Services
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- Unspecified in notice
- First published
- 25 Oct 2024, 09:53 BST
- Last source update
- 25 Oct 2024, 12:27 BST
- Authority reference
DN748850- FTS notice number
2024/S 000-034654- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-04b140Find a Tender
- Why no open competition
The works, supplies or services can be provided only by a particular economic operator due to absence of competition for technical reasons
- Published justification
2 x 500Mbps direct internet connections at County Hall datacentre:
(i) July 2024 - 2025 (with 12m extension possible to July 2026)
(ii) December 2024 - 2025 (with 12m extension possible to December 2026). The services are split for additional resilience in the event of a problem arising. The supplier (Wight Fibre) has its own Island Infrastructure already in situ; any other supplier would depend on utilising BT Open Reach infrastructure to supply our requirements, which in itself carries a higher cost than is offered by Wight Fibre, whose infrastructure is already in place. A cost comparison was carried out and Wight Fibre were lowest cost, but with additional benefits such as monitoring of real time bandwidth and traffic usage. Wight Fibre’s offering also includes a large number of public IP addresses on two of the direct internet connections, upstream DNS mirroring, built in resilience, 24/7 365 days a year coverage for faults, monitoring, and reporting.
Continuity of supply of our connection(s) is of high importance and as well as the cost effectiveness mentioned.
The Isle of Wight Council will be observing a 10-day standstill period which will end at midnight on 04 November 2024.
Notice history
2 releases on Find a TenderPublished amendments (1 · 0 deadline changes)
| When | What | Before | After | Shift |
|---|---|---|---|---|
| — | TextExplanation · IV,1.1 | 2 x 500Mbps direct internet connections at County Hall datacentre: (i) July 2024 - 2025 (with 12m extension possible to July 2026) (ii) December 2024 - 2025 (with 12m extension possible to December 2026). The services are split for additional resilience in the event of a problem arising. The supplier (Wight Fibre) has its own Island Infrastructure already in situ; any other supplier would depend o… | 2 x 500Mbps direct internet connections at County Hall datacentre: (i) July 2024 - 2025 (with 12m extension possible to July 2026) (ii) December 2024 - 2025 (with 12m extension possible to December 2026). The services are split for additional resilience in the event of a problem arising. The supplier (Wight Fibre) has its own Island Infrastructure already in situ; any other supplier would depend o… |
1 amendment published without a description.
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| Wight FibreSME | £32,400 † | — | Awarded |
Contracts
Contract 034608-2024-1 · Wight FibreSME
- Signed
- 25 Oct 2024
- Value
- £32,400
- Status
- active
Contracting authority & participating public bodies
Dispute resolution & review bodies
- The High Court of England and WalesReview body
Bidders & participating suppliers
1 commercial party on the notice- Wight FibreAwarded supplier
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.