Curo Places Limited: Contract Register & Procurement Profile
Companies House: Registered Society·Social housing register: Registered society·South West England·Bath
Official UK PPONPGWN-1556-MMBG
i
Tenders you can still bid for.
Notices at tender stage whose deadline has not passed, counted the way the search counts them: a notice shows under every code and region it names.
i
Notices published in the last 12 months.
Counted per tender, not per lot, against the 12 months before where shown.
i
How many companies usually bid when this buyer runs a tender.
Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.
Based on 4 lots from this buyer’s competitions, last 24 months. Small sample.
i
How much of this buyer’s work goes to its three most frequent suppliers.
Share of its awarded tenders that name at least one of the top three. Each tender is counted once.
21 awarded tenders, 28 different suppliers.
Describes the record. It is not a sign of favouritism.
i
Contracts that finish in the next 18 months.
Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.
An end date does not confirm a new procurement.
i
How much this buyer has awarded recently, by published values.
Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.
Published values, not actual spend. The biggest rows are listed so you can check.
What they buyi
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
i
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
Last 24 months · CPV divisions on published procedures · a notice with several divisions counts in each
45 Construction work12 procedures · 71%50 Repair and maintenance services5 procedures · 29%71 Architectural, construction, engineering2 procedures · 12%31 Electrical machinery1 procedure · 6%35 Security, fire-fighting, police1 procedure · 6%44 Construction structures and materials1 procedure · 6%51 Installation services (except software)1 procedure · 6%75 Administration, defence and social security1 procedure · 6%How they buyi
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Last 24 months · 17 notices · commercial tool and route as published on the notice, not a legal-regime claim
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Contract100%(17 notices)
17 of 17 notices are Contract (100%).
i
Which procedures buyers here use.
Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.
Open59%(10 notices)
10 of 17 notices are Open (59%).Limited / restricted24%(4 notices)
4 of 17 notices are Limited / restricted (24%).Direct award12%(2 notices)
2 of 17 notices are Direct award (12%).Route not published6%(1 notice)
1 of 17 notices is Route not published (6%).
i
How many companies usually bid when this buyer runs a tender.
Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.
Based on 4 lots from this buyer’s competitions, last 24 months. Small sample.
i
How long this buyer takes to decide after bids close.
Middle value in days from the bid deadline to the award date, on this buyer’s own tenders.
Based on 4 decided tenders across all categories, last 24 months.
i
How often this buyer changes a notice after publishing it.
Middle number of amendments per notice. Deadline extensions and corrections both count.
Based on 17 notices across all categories, last 24 months.
i
Do this buyer’s awards land above or below its own estimates.
Each lot’s published estimate against its award, on this buyer’s competitions, like for like.
Based on 2 lots with both an estimate and an award, last 24 months. Small sample.
A past pattern, not a price to bid.
Who wins herei
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
i
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
All published awards naming a supplier · ranked by distinct procedures, not pounds · panel and call-off entries inflate award records
| Supplier | Procedures | Share | Last 24m | Award records | Last activity |
|---|---|---|---|---|---|
| Severnside Security | 2 | 9.5% | 2 | 2 | 12 Jun 2026 |
| Curo Enterprise Limited | 2 | 9.5% | 1 | 2 | — |
| FLEXMR LIMITED | 1 | 4.8% | 1 | 1 | — |
| Joyner P.A. Limited | 1 | 4.8% | 1 | 1 | — |
| Cade Roofing and Building Services Ltd | 1 | 4.8% | 1 | 1 | — |
| CLASSIC LIFTS LTD | 1 | 4.8% | 1 | 1 | — |
| LivGreen Futures Limited | 1 | 4.8% | 1 | 1 | — |
| ORBIS PROTECT LIMITED | 1 | 4.8% | 1 | 1 | — |
The three most frequent suppliers are named on 24% of 21 awarded procedures (each procedure counted once, so a panel shared by several of them is not double-counted); 28 distinct suppliers hold at least one. Descriptive concentration of published awards, not a statement of preference.
i
How much this buyer has awarded recently, by published values.
Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.
Published values, not actual spend. The biggest rows are listed so you can check.
i
The middle published award value for this buyer.
Middle value of the same awards as the total above.
Largest published awards iThe biggest published awards. Awards to a single supplier with a published value, largest first, so you can check the totals against the notice. A repeated framework total can appear here. Open the notice to check. | Supplier | Awarded | Term | Published value |
|---|---|---|---|---|
| WH-SHF (Wave 3) Energy Efficiency Works | LivGreen Futures Limited | — | — | £16,545,427 † |
| Design and Construction of 32 Dwellings - Walnut Buildings | Curo Enterprise Limited | — | — | £9,758,608 † |
| Block Roof Replacements v2 | Cade Roofing and Building Services Ltd | — | 3 yrs · up to 4 yrs | £1,413,579 † ≈ £471k/yr |
| Supply and Installation of Replacement Windows and Doors and Cyclical Works | D R Jones Yeovil Ltd | 27 Feb 2026 | 2 yrs | £1,259,216 ≈ £630k/yr |
| Provision of Access Management service: servicing, maintenance and repairs | Severnside Security | 12 Jun 2026 | 3 yrs · up to 5 yrs | £921,256 ≈ £307k/yr |
Contracts endingi
Contracts that finish in the next 18 months.
Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.
An end date does not confirm a new procurement.
i
Contracts that finish in the next 18 months.
Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.
An end date does not confirm a new procurement.
19 of 24 contracts carry an end date, 10 estimated from the duration · not a retender forecast
| Contract | Holder | Ends | Published value |
|---|---|---|---|
| Supply and Installation of Door Entry Fob Readers and Fobs | Guardian Security (South West) Ltd | 1 Apr 2027 | £216,831 |
| Online Community Software | FLEXMR LIMITED | 11 Jul 2027 | £67,000 |
| Responsive Maintenance Framework v2 | 3 Solutions (2011) Limited, Cosgrove and Drew Ltd, Cross Property Maintenance Limited +2 | 13 Oct 2027 estimated | £6,966,667 |
| Void Property Cleaning, Clearance and Specialist Cleaning Framework | Imperial Cleaning Services (South West) Limited | 29 Dec 2027 estimated | £135,000 |
| Void Property Cleaning, Clearance and Specialist Cleaning Framework | Superclean Uk Ltd | 29 Dec 2027 estimated | £135,000 |
| Void Property Cleaning, Clearance and Specialist Cleaning Framework | aAFD Services | 29 Dec 2027 estimated | £135,000 |
| Void Property Cleaning, Clearance and Specialist Cleaning Framework | Imperial Cleaning Services (South West) Limited | 29 Dec 2027 estimated | £119,265 |
| Cornish Mansard Roof Replacements | Joyner P.A. Limited | 19 Apr 2028 | £360,750 |
Recent procedures
Latest 30 of 30 procedures where this authority buys, is the authority the work is for, or runs the procurement
| Procedure | Status | Published | Published value |
|---|---|---|---|
| Streetlights | Awarded / complete | 9 Sept 2026 | — |
| Provision of Access Management service: servicing, maintenance and repairsInstallation services of electrical and mechanical equipment | Awarded / complete | 26 Aug 2026 | £1,000,000 |
| Online Community Software | Awarded / complete | 20 Jul 2026 | — |
| Cyclical Decoration and Maintenance RepairsOther building completion work | Planning | 14 Jul 2026 | £33,531,123 |
| Active Fire Safety WorksFire extinguishers | Awarded / complete | 2 Jul 2026 | £3,007,898 |
| Reactive Roofing and ScaffoldingRoof repair and maintenance work | Open | 28 May 2026 | £8,000,000 |
| Block Roof Replacements v2Roof maintenance work | Awarded / complete | 24 Apr 2026 | £1,605,333 |
| Cornish Mansard Roof ReplacementsRoof maintenance work | Awarded / complete | 24 Apr 2026 | £360,750 |
| Supply and Installation of Door Entry Fob Readers and FobsElectrical installation work | Awarded / complete | 27 Mar 2026 | £365,320 |
| Supply and Installation of Replacement Windows and Doors and Cyclical WorksDecoration work | Awarded / complete | 2 Mar 2026 | £1,400,000 |
| Cyclical Electrical Inspections & Remediations (EICRs)Electrical services | Awarded / complete | 19 Nov 2025 | £2,997,999 |
| Passenger Lift Servicing, Maintenance, Repairs and ReplacementLift installation work | Awarded / complete | 27 Oct 2025 | £900,000 |
| Block Roof ReplacementsRoof works and other special trade construction works | Cancelled | 11 Sept 2025 | £1,605,333 |
| WH-SHF (Wave 3) Energy Efficiency WorksRefurbishment work | Awarded / complete | 10 Jul 2025 | — |
| Supply and Installation of Windows and DoorsInstallation of doors and windows and related components | Awarded / complete | 21 May 2025 | — |
| Curo Reactive Pest ControlPest-control services | Awarded / complete | 7 May 2025 | — |
| Design and Construction of 32 Dwellings - Walnut BuildingsConstruction work | Awarded / complete | 16 Apr 2025 | — |
| Void Property Cleaning, Clearance and Specialist Cleaning FrameworkBuilding-cleaning services | Awarded / complete | 13 Jan 2025 | — |
| Responsive Maintenance Framework v2Repair and maintenance services | Awarded / complete | 28 Oct 2024 | — |
| Framework for New Build Construction and Development ProjectsArchitectural | Awarded / complete | 15 Oct 2024 | £170,000,000 |
About this data
- Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
- One profile per authority. Different spellings and registration numbers of the same body are merged into this profile. It includes tenders the authority ran for other bodies and tenders run on its behalf; spend is credited to the body that pays.
- Values are published values. Award values are what the authority published, excluding VAT and framework ceilings. They are not a budget or total spend.
- Contract end dates. 19 of 24 published contracts have an end date; 10 of those are estimated as the signature (or publication) date plus the published duration and are marked “estimated”. They feed “Contracts ending”, the same rule as the retender radar.
- Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.