Mining Remediation Authority: Contract Register & Procurement Profile
GOV.UK register: Executive non-departmental public body·Central government·East Midlands·Nottinghamshire
Official UK PPONPRPD-5825-QDVY
i
Tenders you can still bid for.
Notices at tender stage whose deadline has not passed, counted the way the search counts them: a notice shows under every code and region it names.
i
Notices published in the last 12 months.
Counted per tender, not per lot, against the 12 months before where shown.
i
How many companies usually bid when this buyer runs a tender.
Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.
Based on 6 lots from this buyer’s competitions, last 24 months.
i
How much of this buyer’s work goes to its three most frequent suppliers.
Share of its awarded tenders that name at least one of the top three. Each tender is counted once.
103 awarded tenders, 119 different suppliers.
Describes the record. It is not a sign of favouritism.
i
Contracts that finish in the next 18 months.
Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.
An end date does not confirm a new procurement.
i
How much this buyer has awarded recently, by published values.
Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.
Published values, not actual spend. The biggest rows are listed so you can check.
Open notices
2 live · deadline in the future or not published · as of page build
| Notice | Deadline | Days left | Published value |
|---|---|---|---|
| CA18/5956 Construction, Environmental & Technical Professional Services Framework (CETPS) | 6 Nov 2026 | 10d | £9,400,000 |
| CA18/05985 Mine Entry Inspections Framework | 10 Nov 2026 | 14d | £0 |
What they buyi
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
i
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
Last 24 months · CPV divisions on published procedures · a notice with several divisions counts in each
45 Construction work20 procedures · 21%71 Architectural, construction, engineering13 procedures · 14% · 2 open79 Business services: law, marketing, consulting7 procedures · 7%72 IT services: consulting, software, internet5 procedures · 5% · 1 open90 Sewage, refuse, cleaning and environmental5 procedures · 5%34 Transport equipment and products3 procedures · 3%48 Software package and information systems3 procedures · 3%76 Services related to the oil and gas industry3 procedures · 3%How they buyi
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Last 24 months · 95 notices · commercial tool and route as published on the notice, not a legal-regime claim
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Contract88%(84 notices)
84 of 95 notices are Contract (88%).Framework12%(11 notices)
11 of 95 notices are Framework (12%).
i
Which procedures buyers here use.
Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.
Limited / restricted37%(35 notices)
35 of 95 notices are Limited / restricted (37%).Selective19%(18 notices)
18 of 95 notices are Selective (19%).Route not published18%(17 notices)
17 of 95 notices are Route not published (18%).Open14%(13 notices)
13 of 95 notices are Open (14%).Direct award13%(12 notices)
12 of 95 notices are Direct award (13%).
i
How many companies usually bid when this buyer runs a tender.
Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.
Based on 6 lots from this buyer’s competitions, last 24 months.
i
How long this buyer takes to decide after bids close.
Middle value in days from the bid deadline to the award date, on this buyer’s own tenders.
Based on 8 decided tenders across all categories, last 24 months.
i
How often this buyer changes a notice after publishing it.
Middle number of amendments per notice. Deadline extensions and corrections both count.
Based on 95 notices across all categories, last 24 months.
i
Do this buyer’s awards land above or below its own estimates.
Each lot’s published estimate against its award, on this buyer’s competitions, like for like.
Based on 5 lots with both an estimate and an award, last 24 months.
A past pattern, not a price to bid.
Who wins herei
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
i
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
All published awards naming a supplier · ranked by distinct procedures, not pounds · panel and call-off entries inflate award records
| Supplier | Procedures | Share | Last 24m | Award records | Last activity |
|---|---|---|---|---|---|
| Soil Engineering Geoservices Limited | 6 | 5.8% | 3 | 12 | — |
| NAL Plant Ltd | 5 | 4.9% | 4 | 6 | 27 Jan 2026 |
| Llettyshenkin Construction Company Ltd | 5 | 4.9% | 4 | 5 | 27 Jan 2026 |
| Jim Davies Civil Engineering Ltd | 5 | 4.9% | 4 | 5 | 27 Jan 2026 |
| Bethell Construction Ltd | 4 | 3.9% | 3 | 4 | 27 Jan 2026 |
| Thomas Menzies (Builders) Ltd | 4 | 3.9% | 3 | 4 | 27 Jan 2026 |
| Northern Powergrid (Northeast) PLC | 3 | 2.9% | 3 | 4 | 3 Feb 2026 |
| Phoenix Software Ltd | 3 | 2.9% | 3 | 3 | — |
The three most frequent suppliers are named on 14% of 103 awarded procedures (each procedure counted once, so a panel shared by several of them is not double-counted); 119 distinct suppliers hold at least one. Descriptive concentration of published awards, not a statement of preference.
i
How much this buyer has awarded recently, by published values.
Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.
Published values, not actual spend. The biggest rows are listed so you can check.
i
The middle published award value for this buyer.
Middle value of the same awards as the total above.
Largest published awards iThe biggest published awards. Awards to a single supplier with a published value, largest first, so you can check the totals against the notice. A repeated framework total can appear here. Open the notice to check. | Supplier | Awarded | Term | Published value |
|---|---|---|---|---|
| Strategic Systems Development & Support | CGI IT UK Limited | 28 Nov 2025 | 5 yrs · up to 8 yrs | £19,682,041 ≈ £3.9m/yr |
| Pay Structure | Korn Ferry (UK) Limited | — | 3 yrs | £2,461,100 † ≈ £820k/yr |
| General Legal Services | Browne Jacobson LLP | — | — | £2,000,000 † |
| Phase 3.4 Capping and Reinstatement Works | Bethell Construction Ltd | — | 6 mo | £1,652,686 † |
| Chester South Moor Pipe Replacement | Esh Construction | — | — | £1,023,587 † |
Contracts endingi
Contracts that finish in the next 18 months.
Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.
An end date does not confirm a new procurement.
i
Contracts that finish in the next 18 months.
Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.
An end date does not confirm a new procurement.
92 of 156 contracts carry an end date, 33 estimated from the duration · not a retender forecast
| Contract | Holder | Ends | Published value |
|---|---|---|---|
| Phase 3.4 Capping and Reinstatement Works | Bethell Construction Ltd | 12 Nov 2026 | £1,652,686 |
| North Pennines - Survey of raw water main | PETER DUFFY LIMITED | 31 Dec 2026 | £101,252 |
| Sharnberry MWTS - Power Connection - Phase 2 Non-Contestable Works | Northern Powergrid (Northeast) PLC | 31 Dec 2026 | £435,072 |
| Only one contract awarded | Northern Powergrid (Northeast) PLC | 31 Dec 2026 | £0 |
| Welsh Potosi - Esgair Ffriath Surface Water Management | MIDWEST PLANT LTD | 31 Dec 2026 | £114,973 |
| Minera Stryt Y Scweiar 2026 Culvert Replacement | EVANS CONSTRUCTION & CIVIL ENGINEERING LIMITED | 31 Dec 2026 | £76,183 |
| District Network Operator Grid Upgrade | ELECTRICITY NORTH WEST | 26 Feb 2027 | £119,663 |
| Environmental Data Management | Aquatic Informatics | 13 Mar 2027 | £498,182 |
| HO - Manned Security Services | Marvellous Security Services Limited | 30 Mar 2027 | £291,139 |
| CA18/05860 | Thomas Menzies (Builders) Ltd | 31 Mar 2027 | £104,743 |
Soonest 10 of 19 contracts ending within 18 months.
Recent procedures
Latest 50 of 148 procedures where this authority buys, is the authority the work is for, or runs the procurement
| Procedure | Status | Published | Published value |
|---|---|---|---|
| Emergency Call Out and Minor Works | Awarded / complete | 30 May 2026 | — |
| Emergency Call Out and Minor Works | Awarded / complete | 30 May 2026 | — |
| Annual Staff Health Care ChecksHealth services | Planning | 20 May 2026 | — |
| Strategic Systems Development & SupportIT services: consulting | Awarded / complete | 13 May 2026 | £19,500,000 |
| Legal AdviceLegal advisory services | Awarded / complete | 21 Apr 2026 | — |
| Legal ServicesLegal services | Awarded / complete | 20 Apr 2026 | — |
| Legal Services - Great BritainLegal services | Awarded / complete | 20 Apr 2026 | — |
| Legal Services - ScotlandLegal services | Awarded / complete | 20 Apr 2026 | — |
About this data
- Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
- One profile per authority. Different spellings and registration numbers of the same body are merged into this profile. It includes tenders the authority ran for other bodies and tenders run on its behalf; spend is credited to the body that pays.
- Values are published values. Award values are what the authority published, excluding VAT and framework ceilings. They are not a budget or total spend.
- Contract end dates. 92 of 156 published contracts have an end date; 33 of those are estimated as the signature (or publication) date plus the published duration and are marked “estimated”. They feed “Contracts ending”, the same rule as the retender radar.
- Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.