Somerset NHS Foundation Trust: Contract Register & Procurement Profile

NHS ODS: NHS TRUSTCentral governmentSouth West EnglandTaunton

Official UK PPONPNWR-4212-QWHQWebsitesomersetft.nhs.uk ↗

Open now1next deadline 30 Oct 2026
i

Tenders you can still bid for.

Notices at tender stage whose deadline has not passed, counted the way the search counts them: a notice shows under every code and region it names.

Notices, last 12 months289+331% vs prior 12 months (67)
i

Notices published in the last 12 months.

Counted per tender, not per lot, against the 12 months before where shown.

Typical bids per lot68.7% single-bid · 23 bid reports
i

How many companies usually bid when this buyer runs a tender.

Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.

Based on 23 lots from this buyer’s competitions, last 24 months.

Last 24 months, all categories.

Top-3 supplier share8%of 370 awarded procedures · 285 suppliers
i

How much of this buyer’s work goes to its three most frequent suppliers.

Share of its awarded tenders that name at least one of the top three. Each tender is counted once.

370 awarded tenders, 285 different suppliers.

Describes the record. It is not a sign of favouritism.

All awards we hold.

Contracts ending ≤18 months11581 within 6 months · 4 estimated
i

Contracts that finish in the next 18 months.

Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.

An end date does not confirm a new procurement.

Published award value, 24m£120mnet · on 333 of 333 published values · top 5 = 52%
i

How much this buyer has awarded recently, by published values.

Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.

Published values, not actual spend. The biggest rows are listed so you can check.

Open notices

1 live · deadline in the future or not published · as of page build

NoticeDeadlineDays leftPublished value
Antenatal Ward Relocation to Block 14 (SFT-BT-C464875)30 Oct 20263d£1,200,000

What they buy
i

What kind of work is bought here.

Notices by procurement category (CPV). A notice with several categories counts in each.

Last 24 months · CPV divisions on published procedures · a notice with several divisions counts in each

How they buy
i

How work here is packaged.

Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.

Last 24 months · 356 notices · commercial tool and route as published on the notice, not a legal-regime claim

Commercial tool
i

How work here is packaged.

Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.

  • Contract97%(345 notices)
    345 of 356 notices are Contract (97%).
  • Framework3%(11 notices)
    11 of 356 notices are Framework (3%).
Procedure route
i

Which procedures buyers here use.

Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.

  • Direct award46%(162 notices)
    162 of 356 notices are Direct award (46%).
  • Limited / restricted36%(128 notices)
    128 of 356 notices are Limited / restricted (36%).
  • Route not published11%(40 notices)
    40 of 356 notices are Route not published (11%).
  • Open6%(23 notices)
    23 of 356 notices are Open (6%).
  • Selective1%(3 notices)
    3 of 356 notices are Selective (1%).
Typical bids per lot
i

How many companies usually bid when this buyer runs a tender.

Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.

Based on 23 lots from this buyer’s competitions, last 24 months.

Last 24 months, all categories.

6robust · n=238.7% of lots drew a single bid
Deadline → award
i

How long this buyer takes to decide after bids close.

Middle value in days from the bid deadline to the award date, on this buyer’s own tenders.

Based on 9 decided tenders across all categories, last 24 months.

Last 24 months.

34 daysrobust · n=9
Notice amendments
i

How often this buyer changes a notice after publishing it.

Middle number of amendments per notice. Deadline extensions and corrections both count.

Based on 356 notices across all categories, last 24 months.

Last 24 months.

021 of 356 notices amended
Award vs estimate
i

Do this buyer’s awards land above or below its own estimates.

Each lot’s published estimate against its award, on this buyer’s competitions, like for like.

Based on 6 lots with both an estimate and an award, last 24 months.

A past pattern, not a price to bid.

Last 24 months.

11% below estimaterobust · n=6

Who wins here
i

Which suppliers win the most here.

Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.

All published awards naming a supplier · ranked by distinct procedures, not pounds · panel and call-off entries inflate award records

SupplierProceduresShareLast 24mAward recordsLast activity
SOMERSET SURGICAL SERVICES LTD123.2%713—
Knight Electrical Limited102.7%9103 Mar 2026
AGITO Medical ASframework/DPS on 261.6%66—
Hologic Ltd51.4%553 Aug 2026
ICS Operations trading as Xyla Servicesframework/DPS on 151.4%45—
Philips Electronics UK Limited41.1%44—
Rethink Trading Limited41.1%15—
R.T.S. Engineering (Somerset) LTD30.8%33—

The three most frequent suppliers are named on 8% of 370 awarded procedures (each procedure counted once, so a panel shared by several of them is not double-counted); 285 distinct suppliers hold at least one. Descriptive concentration of published awards, not a statement of preference.

Published award value (24m)
i

How much this buyer has awarded recently, by published values.

Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.

Published values, not actual spend. The biggest rows are listed so you can check.

£120mSum of published VAT-exclusive values on 333 of 333 published single-supplier values; the five largest make 52%.
Typical single-supplier award (24m)
i

The middle published award value for this buyer.

Middle value of the same awards as the total above.

Last 24 months.

£60k middle valuerobust · n=333Middle half £22k–£208k.
Largest published awards
i

The biggest published awards.

Awards to a single supplier with a published value, largest first, so you can check the totals against the notice.

A repeated framework total can appear here. Open the notice to check.

SupplierAwardedTermPublished value
Variation for construction and operation of a Community Diagnostics FacilityALTHEA UK AND IRELAND LIMITED——£37,539,000 †
Variation for construction and operation of a Community Diagnostics FacilityALTHEA UK AND IRELAND LIMITED30 May 20251.9 yrs£14,336,000
≈ £7.5m/yr
Contract for the Supply of Blood Components, Reagents and ServicesNHS BLOOD AND TRANSPLANT (NHSBT)——£4,471,659 †
Dell PC's, Laptops, Servers and StorageDell Corporation Ltd——£3,360,000 †
Community Investigation HubsBridgwater PCN——£2,884,420 †

Contracts ending
i

Contracts that finish in the next 18 months.

Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.

An end date does not confirm a new procurement.

242 of 391 contracts carry an end date, 8 estimated from the duration · not a retender forecast

Soonest 9 of 115 contracts ending within 18 months.

Recent procedures

Latest 50 of 414 procedures where this authority buys, is the authority the work is for, or runs the procurement

ProcedureStatusPublishedPublished value
Provision of emergency out of hours interventional radiology servicesMedical specialist servicesAwarded / complete22 Oct 2026—
Insourcing of Dermatology ServicesDermatology servicesAwarded / complete22 Oct 2026—
Menumark Satellite and TrainingAwarded / complete21 Oct 2026—
'Function Forward' Mental Health ProgrammeCommunity health servicesAwarded / complete16 Oct 2026—
Chest X-Ray Artificial Intelligence Solution and Radiology AI PlatformAwarded / complete14 Oct 2026—
Learning Management SystemSystem and support servicesAwarded / complete14 Oct 2026—
CAPRO124 327.0 Alteration Works to HistopathologyAwarded / complete13 Oct 2026—
Provision of dairy, bread, fruit and vegetables and associated products2 lotsDairy productsAwarded / complete13 Oct 2026£1,844,000
Radiofrequency Ablation TreatmentAwarded / complete9 Oct 2026—
Water and wastewater servicesAwarded / complete8 Oct 2026—
Provision of Healthshare Health Connect Enterprise SystemComputer network servicesAwarded / complete7 Oct 2026—
Replacement of five AGSS pumpsAwarded / complete7 Oct 2026—
Renewal of safety-critical steam distribution infrastructureAwarded / complete7 Oct 2026—
Replacement of Tek ScrewsAwarded / complete7 Oct 2026—
CSO Perseus MicroscopeAwarded / complete7 Oct 2026—
MS39 OCT Anterior Segment Analysis DeviceAwarded / complete7 Oct 2026—
Provision of transport for stroke and suspected stroke patientsAmbulance servicesAwarded / complete6 Oct 2026—
Monsoon IV Double Jet VentilatorAwarded / complete5 Oct 2026—
CAPRO121 Source art installation and related groundworks and landscapingAwarded / complete5 Oct 2026—
Replacement gas wall 02 flowmeters and vacuum regulatorAwarded / complete5 Oct 2026—

Search all 414 procedures for this authority →

About this data
  • Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
  • One profile per authority. Different spellings and registration numbers of the same body are merged into this profile. It includes tenders the authority ran for other bodies and tenders run on its behalf; spend is credited to the body that pays.
  • Values are published values. Award values are what the authority published, excluding VAT and framework ceilings. They are not a budget or total spend.
  • Contract end dates. 242 of 391 published contracts have an end date; 8 of those are estimated as the signature (or publication) date plus the published duration and are marked “estimated”. They feed “Contracts ending”, the same rule as the retender radar.
  • Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.