Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 541–555

  1. Ends · in 38 days

    Library Refurb Works

    North East London NHS Foundation Trust · Central government · Nationwide (UK)

    Incumbent: SD Cartpentry Ltd

    Strip out wall between the 2 rooms. Strip out grid ceiling and all track system. Tidy or raise electrics in ceiling to raise ceiling height. Remove floor coverings Remove all unwanted electric sockets and data from walls. Remove all unwante…

    Published value
    £77k
    Annual run-rate
    £77kpublished value ÷ term, exc. VAT
    Term
    5 Dec 2025 → 4 Dec 2026 · 1 yr
    Reference
    ocds-h6vhtk-05f48d
  2. Ends · in 38 days

    Pennington CE (C) Junior School - Creating Inclusion Space in Former Changing Room

    Hampshire County Council · Local authority · South East England

    Incumbent: Green Building Maintenance Ltd

    Works to create an inclusion space from an existing standalone small building at Pennington Primary School. - External fencing to create a smaller garden space that can be safely supervised. - Fire exit door - replaced with new inc exit and…

    Published value
    £61k
    Annual run-rate
    —term under 6 months
    Term
    19 Oct 2026 → 4 Dec 2026 · 2 months
    Reference
    ocds-h6vhtk-0789f9
  3. Ends · in 38 daysExtension option · up to 15 Nov 2030

    Installation of new windows and doors at Thame fire station

    Oxfordshire County Council · Local authority · South East England

    Incumbent: NEWBURY COMMERCIAL GLAZING LIMITED

    The installation of new windows and doors at Thame fire station, Nelson Street.

    Published value
    £41k
    Annual run-rate
    —term under 6 months
    Term
    16 Nov 2026 → 4 Dec 2026 · 19 days · up to 15 Nov 2030 with extensions
    Reference
    ocds-h6vhtk-078399
  4. Ends · in 38 days

    Electrical Remedial Works British Embassy Pristina

    Foreign, Commonwealth and Development Office · Central government

    Incumbent: 3A Projekt SH.P.K.

    Electrical remedial works for the British Embassy Pristina.

    Published value
    £25k
    Annual run-rate
    —term under 6 months
    Term
    19 Oct 2026 → 4 Dec 2026 · 2 months
    Reference
    ocds-h6vhtk-078d6f
  5. Ends · in 38 days

    Additional Steel Fabrication for lift support

    North East London NHS Foundation Trust · Central government · Nationwide (UK)

    Incumbent: MS Metal Fabrications Ltd

    Additioanl Steel Fabrication for lift support

    Published value
    £20k
    Annual run-rate
    £20kpublished value ÷ term, exc. VAT
    Term
    5 Dec 2025 → 4 Dec 2026 · 1 yr
    Reference
    ocds-h6vhtk-05f492
  6. Estimated end · in 40 days

    SLHD Asbestos Removal Services

    City of Doncaster Council · Local authority · Yorkshire and the Humber

    Incumbent: EM1 LTD · Last contest: 14 bids

    The removal of Asbestos and associated works for properties owned or managed by St Leger Homes.

    • Asbestos-removal work
    Published value
    £2.4m
    Annual run-rate
    —start date not published
    Term
    Estimated end 6 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-0487d8
  7. Estimated end · in 40 days

    SLHD Asbestos Removal Services

    City of Doncaster Council · Local authority · Yorkshire and the Humber

    Incumbent: RE:GEN SOLUTIONS LIMITED · Last contest: 14 bids

    The removal of Asbestos and associated works for properties owned or managed by St Leger Homes.

    • Asbestos-removal work
    Published value
    £2.4m
    Annual run-rate
    —start date not published
    Term
    Estimated end 6 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-0487d8
  8. Ends · in 40 days

    West Ham Lane HC - Replacement windows and EWI System to external walls

    NHS Property Services Limited · NHS & health

    Incumbent: Petric Contracts Ltd

    Contract for West Ham Lane HC - Replacement windows and EWI System to external walls

    Published value
    £868k
    Annual run-rate
    —not computed
    Term
    22 Jun 2026 → 6 Dec 2026 · 6 months
    Reference
    ocds-h6vhtk-06aec4
  9. Ends · in 40 days

    NDC0054-25 - Oxford Grove CP Retaining Walls

    North Devon District Council · Local authority · South West England

    Incumbent: CONSTRUCTING CO UK LIMITED · Last contest: awarded 54% under the estimate

    The repair of two retaining walls to include the regrading of one retained slope and the underpinning of one wall. To include the installation of new fencing and barriers to both walls.

    Published value
    £232k
    Annual run-rate
    £322kpublished value ÷ term, exc. VAT
    Term
    18 Mar 2026 → 6 Dec 2026 · 9 months
    Reference
    ocds-h6vhtk-05da85
  10. Ends · in 40 days

    Lot 2 - Norristhorpe Junior & Infant school

    Kirklees Council · Local authority · Nationwide (UK)

    Incumbent: Tucker & Tunstalls Limited

    This Procurement was a restricted invited quote through the YORtender portal for roofing works at 5 schools across the Kirklees district

    Published value
    £101k
    Annual run-rate
    —term under 6 months
    Term
    26 Oct 2026 → 6 Dec 2026 · 42 days
    Reference
    ocds-h6vhtk-078931
  11. Ends · in 40 days

    Refurbishment of 2 Woodend Cottages

    East Suffolk Council · Local authority · East of England

    Incumbent: East Rising Ltd

    East Suffolk Council (‘the Council’, ‘ESC’) is looking to appoint a suitably qualified and experienced supplier for the refurbishment, capital upgrades and internal remodelling of a three-bed semi-detached house, located in Stoven. Along wi…

    Published value
    £88kinc. VAT as published
    Annual run-rate
    —term under 6 months
    Term
    6 Sept 2026 → 6 Dec 2026 · 3 months
    Reference
    ocds-h6vhtk-06856e
  12. Ends · in 40 days

    Lot 1 - Headlands Primary School

    Kirklees Council · Local authority · Nationwide (UK)

    Incumbent: Tucker & Tunstalls Limited

    This Procurement was a restricted invited quote through the YORtender portal for roofing works at 5 schools across the Kirklees district

    Published value
    £37k
    Annual run-rate
    —term under 6 months
    Term
    26 Oct 2026 → 6 Dec 2026 · 42 days
    Reference
    ocds-h6vhtk-078931
  13. Estimated end · in 41 days

    Contract

    Northern Ireland Housing Executive · Northern Ireland

    Incumbent: Greenview Gas (Ltd) · Last contest: 5 bids (1 SME) · awarded 12% over the estimate

    NIHE is procuring a suitable Contractor to carryout Kitchen and Bathroom Replacement works and Rewires to Properties in the Mis and East Antrim Area

    • Building construction work
    Published value
    £10m
    Annual run-rate
    —start date not published
    Term
    Estimated end 7 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-042645
  14. Ends · in 41 daysExtension option · up to 7 Dec 2028Panel · 12 suppliers

    Supply & Installation of Bathroom Adaptations

    Barnsley Metropolitan Borough Council · Local authority · Nationwide (UK)

    Panel: Arrow Developments Ltd, B&K Passmore Ltd T/As Passmore Group, Certus Construction Group Limited +9 more

    This contract is for the establishment of a framework agreement for the provision of bathroom adaptations and associated bespoke works being commissioned for properties within the Borough to support access improvements, funded by the Disabl…

    Published value
    £3.8m
    Annual run-rate
    —panel, not one supplier
    Term
    27 Feb 2026 → 7 Dec 2026 · 9 months · up to 7 Dec 2028 with extensions
    Reference
    ocds-h6vhtk-051123
  15. Ends · in 41 days

    FWKORD0027 A396 Stoke Woods Highway Stabilisation

    Devon County Council · Local authority · South West England

    Incumbent: MAC PLANT CONSTRUCTION LIMITED

    Devon County Council (DCC) has procured a Work Order under its Minor Engineering Works Framework 2026-30 under Lot 5 using the quotation procedure, in accordance with Section 12 of the Framework Information (Volume 2). The proposed project …

    Published value
    £908k
    Annual run-rate
    —term under 6 months
    Term
    5 Aug 2026 → 7 Dec 2026 · 4 months
    Reference
    ocds-h6vhtk-06dd0b

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months922
  2. 3–6 months574
  3. 6–12 months591
  4. 12–24 months729

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.