- Ends · in 38 days
Library Refurb Works
North East London NHS Foundation Trust · Central government · Nationwide (UK)
Incumbent: SD Cartpentry Ltd
Strip out wall between the 2 rooms. Strip out grid ceiling and all track system. Tidy or raise electrics in ceiling to raise ceiling height. Remove floor coverings Remove all unwanted electric sockets and data from walls. Remove all unwante…
- Published value
- £77k
- Annual run-rate
- £77kpublished value ÷ term, exc. VAT
- Term
- 5 Dec 2025 → 4 Dec 2026 · 1 yr
- Reference
ocds-h6vhtk-05f48d
- Ends · in 38 days
Pennington CE (C) Junior School - Creating Inclusion Space in Former Changing Room
Hampshire County Council · Local authority · South East England
Incumbent: Green Building Maintenance Ltd
Works to create an inclusion space from an existing standalone small building at Pennington Primary School. - External fencing to create a smaller garden space that can be safely supervised. - Fire exit door - replaced with new inc exit and…
- Published value
- £61k
- Annual run-rate
- —term under 6 months
- Term
- 19 Oct 2026 → 4 Dec 2026 · 2 months
- Reference
ocds-h6vhtk-0789f9
- Ends · in 38 daysExtension option · up to 15 Nov 2030
Installation of new windows and doors at Thame fire station
Oxfordshire County Council · Local authority · South East England
Incumbent: NEWBURY COMMERCIAL GLAZING LIMITED
The installation of new windows and doors at Thame fire station, Nelson Street.
- Published value
- £41k
- Annual run-rate
- —term under 6 months
- Term
- 16 Nov 2026 → 4 Dec 2026 · 19 days · up to 15 Nov 2030 with extensions
- Reference
ocds-h6vhtk-078399
- Ends · in 38 days
Electrical Remedial Works British Embassy Pristina
Foreign, Commonwealth and Development Office · Central government
Incumbent: 3A Projekt SH.P.K.
Electrical remedial works for the British Embassy Pristina.
- Published value
- £25k
- Annual run-rate
- —term under 6 months
- Term
- 19 Oct 2026 → 4 Dec 2026 · 2 months
- Reference
ocds-h6vhtk-078d6f
- Ends · in 38 days
Additional Steel Fabrication for lift support
North East London NHS Foundation Trust · Central government · Nationwide (UK)
Incumbent: MS Metal Fabrications Ltd
Additioanl Steel Fabrication for lift support
- Published value
- £20k
- Annual run-rate
- £20kpublished value ÷ term, exc. VAT
- Term
- 5 Dec 2025 → 4 Dec 2026 · 1 yr
- Reference
ocds-h6vhtk-05f492
- Estimated end · in 40 days
SLHD Asbestos Removal Services
City of Doncaster Council · Local authority · Yorkshire and the Humber
Incumbent: EM1 LTD · Last contest: 14 bids
The removal of Asbestos and associated works for properties owned or managed by St Leger Homes.
- Published value
- £2.4m
- Annual run-rate
- —start date not published
- Term
- Estimated end 6 Dec 2026 · start not published
- Reference
ocds-h6vhtk-0487d8
- Estimated end · in 40 days
SLHD Asbestos Removal Services
City of Doncaster Council · Local authority · Yorkshire and the Humber
Incumbent: RE:GEN SOLUTIONS LIMITED · Last contest: 14 bids
The removal of Asbestos and associated works for properties owned or managed by St Leger Homes.
- Published value
- £2.4m
- Annual run-rate
- —start date not published
- Term
- Estimated end 6 Dec 2026 · start not published
- Reference
ocds-h6vhtk-0487d8
- Ends · in 40 days
West Ham Lane HC - Replacement windows and EWI System to external walls
NHS Property Services Limited · NHS & health
Incumbent: Petric Contracts Ltd
Contract for West Ham Lane HC - Replacement windows and EWI System to external walls
- Published value
- £868k
- Annual run-rate
- —not computed
- Term
- 22 Jun 2026 → 6 Dec 2026 · 6 months
- Reference
ocds-h6vhtk-06aec4
- Ends · in 40 days
NDC0054-25 - Oxford Grove CP Retaining Walls
North Devon District Council · Local authority · South West England
Incumbent: CONSTRUCTING CO UK LIMITED · Last contest: awarded 54% under the estimate
The repair of two retaining walls to include the regrading of one retained slope and the underpinning of one wall. To include the installation of new fencing and barriers to both walls.
- Published value
- £232k
- Annual run-rate
- £322kpublished value ÷ term, exc. VAT
- Term
- 18 Mar 2026 → 6 Dec 2026 · 9 months
- Reference
ocds-h6vhtk-05da85
- Ends · in 40 days
Lot 2 - Norristhorpe Junior & Infant school
Kirklees Council · Local authority · Nationwide (UK)
Incumbent: Tucker & Tunstalls Limited
This Procurement was a restricted invited quote through the YORtender portal for roofing works at 5 schools across the Kirklees district
- Published value
- £101k
- Annual run-rate
- —term under 6 months
- Term
- 26 Oct 2026 → 6 Dec 2026 · 42 days
- Reference
ocds-h6vhtk-078931
- Ends · in 40 days
Refurbishment of 2 Woodend Cottages
East Suffolk Council · Local authority · East of England
Incumbent: East Rising Ltd
East Suffolk Council (‘the Council’, ‘ESC’) is looking to appoint a suitably qualified and experienced supplier for the refurbishment, capital upgrades and internal remodelling of a three-bed semi-detached house, located in Stoven. Along wi…
- Published value
- £88kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 6 Sept 2026 → 6 Dec 2026 · 3 months
- Reference
ocds-h6vhtk-06856e
- Ends · in 40 days
Lot 1 - Headlands Primary School
Kirklees Council · Local authority · Nationwide (UK)
Incumbent: Tucker & Tunstalls Limited
This Procurement was a restricted invited quote through the YORtender portal for roofing works at 5 schools across the Kirklees district
- Published value
- £37k
- Annual run-rate
- —term under 6 months
- Term
- 26 Oct 2026 → 6 Dec 2026 · 42 days
- Reference
ocds-h6vhtk-078931
- Estimated end · in 41 days
Contract
Northern Ireland Housing Executive · Northern Ireland
Incumbent: Greenview Gas (Ltd) · Last contest: 5 bids (1 SME) · awarded 12% over the estimate
NIHE is procuring a suitable Contractor to carryout Kitchen and Bathroom Replacement works and Rewires to Properties in the Mis and East Antrim Area
- Published value
- £10m
- Annual run-rate
- —start date not published
- Term
- Estimated end 7 Dec 2026 · start not published
- Reference
ocds-h6vhtk-042645
- Ends · in 41 daysExtension option · up to 7 Dec 2028Panel · 12 suppliers
Supply & Installation of Bathroom Adaptations
Barnsley Metropolitan Borough Council · Local authority · Nationwide (UK)
Panel: Arrow Developments Ltd, B&K Passmore Ltd T/As Passmore Group, Certus Construction Group Limited +9 more
This contract is for the establishment of a framework agreement for the provision of bathroom adaptations and associated bespoke works being commissioned for properties within the Borough to support access improvements, funded by the Disabl…
- Published value
- £3.8m
- Annual run-rate
- —panel, not one supplier
- Term
- 27 Feb 2026 → 7 Dec 2026 · 9 months · up to 7 Dec 2028 with extensions
- Reference
ocds-h6vhtk-051123
- Ends · in 41 days
FWKORD0027 A396 Stoke Woods Highway Stabilisation
Devon County Council · Local authority · South West England
Incumbent: MAC PLANT CONSTRUCTION LIMITED
Devon County Council (DCC) has procured a Work Order under its Minor Engineering Works Framework 2026-30 under Lot 5 using the quotation procedure, in accordance with Section 12 of the Framework Information (Volume 2). The proposed project …
- Published value
- £908k
- Annual run-rate
- —term under 6 months
- Term
- 5 Aug 2026 → 7 Dec 2026 · 4 months
- Reference
ocds-h6vhtk-06dd0b
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,65145Construction work2,08772IT services: consulting, software, internet1,61960Transport services (except waste transport)1,53771Architectural, construction, engineering1,41350Repair and maintenance services1,40680Education and training services1,254
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.