Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 401–450
- Ends · in 31 daysExtension option · up to 1 Jun 2027
Millbank House (Data Centre) Fire Suppression and Ventilation -Works
Corporate Officer of the House of Commons · Central government · Nationwide (UK)
Incumbent: MITIE TECHNICAL FACILITIES MANAGEMENT LIMITED
Millbank House (Data Centre) Fire Suppression and Ventilation -Works
- Published value
- £2.2m
- Annual run-rate
- £3.3mpublished value ÷ term, exc. VAT
- Term
- 1 Apr 2026 → 27 Nov 2026 · 8 months · up to 1 Jun 2027 with extensions
- Reference
ocds-h6vhtk-068427
- Ends · in 31 days
Land Enabling Works
ORE Catapult · Other public body · Nationwide (UK)
Incumbent: CHAP Group (Aberdeen) Ltd · Last contest: awarded 1% under the estimate
ORE Catapult has established a cutting-edge testing and demonstration facility in Aberdeen, named the Floating Offshore Wind Innovation Centre (FLOWIC) based within the Energy Transition Zone. ORE Catapult is committed to enhancing its capa…
- Published value
- £643k
- Annual run-rate
- £769kpublished value ÷ term, exc. VAT
- Term
- 27 Jan 2026 → 27 Nov 2026 · 10 months
- Reference
ocds-h6vhtk-05dfa9
- Ends · in 31 days
Tunbridge Wells Grammar School for Boys - DT block and main hall windows
Kent County Council · Local authority
Incumbent: G. A. HARPER LTD
Tunbridge Wells Grammar School for Boys, works to replace all windows, corridor structural steel and roof to DT block and replace window walling to main hall. Value £519,607.19 CN260790
- Published value
- £520k
- Annual run-rate
- —term under 6 months
- Term
- 17 Aug 2026 → 27 Nov 2026 · 3 months
- Reference
ocds-h6vhtk-06ea67
- Ends · in 31 days
STA25-0036 - Void Refurbishment Works
Tai Calon Community Housing Ltd · Other public body · Wales (Cymru)
Incumbent: CWMBRAN ELECTRICAL SERVICES LTD
Refurbishment of Void Properties - installation of kitchen, bathrooms and rewires
- Published value
- £300k
- Annual run-rate
- £300kpublished value ÷ term, exc. VAT
- Term
- 28 Nov 2025 → 27 Nov 2026 · 1 yr
- Reference
ocds-h6vhtk-06125e
- Ends · in 31 daysExtension option · up to 31 Mar 2027
13505 - Area-5 Window Replacement Programme 1
Winchester City Council · Local authority · South East England
Incumbent: Mysons Ltd
PVCu Window and door replacements to council owned properties in: Beech Grove, School Rd, Widley Walk, St Andrews Green, Stewarts Green
- Published value
- £281kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 13 Jul 2026 → 27 Nov 2026 · 5 months · up to 31 Mar 2027 with extensions
- Reference
ocds-h6vhtk-06c79b
- Ends · in 31 days
Fire stopping - following bolster reports
Housing 21 · Central government · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Ark Fire Protection Limited
Fire stopping - following bolster reports at various courts.
- Published value
- £274k
- Annual run-rate
- —term under 6 months
- Term
- 6 Jul 2026 → 27 Nov 2026 · 5 months
- Reference
ocds-h6vhtk-06de9a
- Ends · in 31 days
Nuneaton Justice Centre BMS Replacement Project
The Police and Crime Commissioner for Warwickshire · Police & fire · West Midlands
Incumbent: AP Mitchell Building Services Ltd
Please note this contract has been awarded and is NOT a call for competition. The Police & Crime Commissioner for Warwickshire has awarded a contract for the provision of a BMS replacement project at Nuneaton Justice Centre on behalf of War…
- Published value
- £273k
- Annual run-rate
- —term under 6 months
- Term
- 14 Sept 2026 → 27 Nov 2026 · 2 months
- Reference
ocds-h6vhtk-06cbd4
- Ends · in 31 days
Wylfa- Provision & Installation of A Mezzanine Platform & Containment Enclosure
Nuclear Restoration Services Limited · Other public body
Incumbent: Penny Engineering Limited
This is the procurement for the development of design, fabrication and installation of a Mezzanine Platform and Transit Route in the Sprocket Room
- Published value
- £166kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 27 Aug 2026 → 27 Nov 2026 · 3 months
- Reference
ocds-h6vhtk-06f1ef
- Ends · in 31 days
Kings Furlong Junior School - Replacement and Upgrade of Cabling
Hampshire County Council · Local authority · South East England
Incumbent: CEI ELECTRICAL SERVICES LTD
Rewiring of approximately 90% of the electrical accessories throughout the school, along with the upgrade of a distribution board. This also includes the installation of emergency lighting and additional lighting controls.
- Published value
- £122k
- Annual run-rate
- —term under 6 months
- Term
- 3 Aug 2026 → 27 Nov 2026 · 4 months
- Reference
ocds-h6vhtk-06d5bc
- Ends · in 31 days
Tonyrefail Leisure Centre - Relocation of GF Gym to Function Room 1st Floor
Rhondda Cynon Taf CBC · Other public body · Wales (Cymru)
Incumbent: Albion Workplace Solutions
Tonyrefail Leisure Centre - Relocation of GF Gym to Function Room 1st Floor 2026
- Published value
- £120k
- Annual run-rate
- —term under 6 months
- Term
- 14 Aug 2026 → 27 Nov 2026 · 3 months
- Reference
ocds-h6vhtk-0774a0
- Ends · in 31 days
Friars Wharf Play Area Refurbishment
Oxford City Council · Local authority · South East England
Incumbent: HAGS SMP Ltd
Contract for Refurbishment of play area at Friars Wharf park
- Published value
- £108kinc. VAT as published
- Annual run-rate
- £153kpublished value ÷ term, inc. VAT
- Term
- 16 Mar 2026 → 27 Nov 2026 · 8 months
- Reference
ocds-h6vhtk-0665df
- Ends · in 31 days
Clough Road Electric Boiler Works
The Police and Crime Commissioner for Humberside · Police & fire · Yorkshire and the Humber
Incumbent: FAIRBURNS GROUP LIMITED
This electrical boiler works was to support a wider project to support the installation of a biomass boiler at this Police Station. Due to a custody suite being on site we needed a contingency plan if the biomass boiler was down and decided…
- Published value
- £107k
- Annual run-rate
- —term under 6 months
- Term
- 5 Oct 2026 → 27 Nov 2026 · 2 months
- Reference
ocds-h6vhtk-069dac
- Ends · in 31 days
Seaham Docks Car Park Earthworks
Durham County Council · Local authority · North East England
Incumbent: Hall Construction Services Limited
Earthworks required for Seaham Docks Car Park
- Published value
- £106kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 3 Sept 2026 → 27 Nov 2026 · 3 months
- Reference
ocds-h6vhtk-07870b
- Ends · in 31 days
Communal and flat fire door replacement
Housing 21 · Central government · South East England
Incumbent: CLC Contractors Ltd
Communal and flat fire door replacement at Irene Astor Court
- Published value
- £103k
- Annual run-rate
- —term under 6 months
- Term
- 1 Oct 2026 → 27 Nov 2026 · 2 months
- Reference
ocds-h6vhtk-06acfc
- Ends · in 31 days
Window Repairs at 391 Cromwell Tower
The Mayor and Commonalty and Citizens of the City of London · Local authority
Incumbent: P A Finlay & Co Ltd
Mini Competetition to for the works of undertaking window Repairs at 391 Cromwell Tower
- Published value
- £99k
- Annual run-rate
- —term under 6 months
- Term
- 7 Sept 2026 → 27 Nov 2026 · 3 months
- Reference
ocds-h6vhtk-078383
- Ends · in 31 days
Burnley Town Hall - Replacement Fire Alarm System
Burnley Borough Council · Local authority · North West England
Incumbent: CATCHPOINT (UK) LTD.
Replacement of the entire fire alarm system as a hybrid system part wireless and hard wired.
- Published value
- £97k
- Annual run-rate
- —term under 6 months
- Term
- 19 Oct 2026 → 27 Nov 2026 · 40 days
- Reference
ocds-h6vhtk-077a22
- Ends · in 31 days
C5033 - MSK AP Relocation
Sussex Community NHS Foundation Trust · Central government
Incumbent: Seaview Building Company
C5033 - MSK AP Relocation at Brighton General Hospital
- Published value
- £94k
- Annual run-rate
- —term under 6 months
- Term
- 7 Sept 2026 → 27 Nov 2026 · 3 months
- Reference
ocds-h6vhtk-077573
- Ends · in 31 days
Tadmore House Battery Charging Installation
London Borough of Wandsworth · Local authority
Incumbent: SOS Electricals & Services Ltd
Provision of a new battery charging installation including contractor design, manufacture and supply of charging enclosures, electrical infrastructure, fire safety systems, testing, commissioning, certification and all associated works nece…
- Published value
- £85k
- Annual run-rate
- —term under 6 months
- Term
- 23 Sept 2026 → 27 Nov 2026 · 2 months
- Reference
ocds-h6vhtk-06f7a4
- Ends · in 31 days
36 Crestway - Void Refurbishment
London Borough of Wandsworth · Local authority
Incumbent: Hartley Services Group Ltd
Void Refurbishment at 36 Crestway SW15 5BY
- Published value
- £84k
- Annual run-rate
- —term under 6 months
- Term
- 28 Sept 2026 → 27 Nov 2026 · 2 months
- Reference
ocds-h6vhtk-077d31
- Ends · in 31 days
Wath Health Centre - Fire alarm replacement
NHS Property Services Limited · NHS & health
Incumbent: Watsons Building Services Limited
Contract for Wath Health Centre - Fire alarm replacement
- Published value
- £77k
- Annual run-rate
- —term under 6 months
- Term
- 5 Oct 2026 → 27 Nov 2026 · 2 months
- Reference
ocds-h6vhtk-06df13
- Ends · in 31 days
External Layby Works
Believe Housing Limited · Other public body · North East England
Incumbent: Debmat Surfacing Limited
External Layby Works - Restricted Quotation Only
- Published value
- £70k
- Annual run-rate
- —term under 6 months
- Term
- 14 Sept 2026 → 27 Nov 2026 · 2 months
- Reference
ocds-h6vhtk-06e79e
- Ends · in 31 days
CBC-W-26323-SM Mancroft Road enabling works
Central Bedfordshire Council · Local authority
Incumbent: Jeakins Weir Limited
Enabling and initial construction works to support the future development of 18 new affordable homes. Works include site clearance, pre-construction health and safety activities and limited construction works required to commence the approv…
- Published value
- £64k
- Annual run-rate
- —term under 6 months
- Term
- 5 Oct 2026 → 27 Nov 2026 · 2 months
- Reference
ocds-h6vhtk-078037
- Ends · in 31 days
CBC-2179-W-26323-SM Mancroft Road Enabling Works
Central Bedfordshire Council · Local authority
Incumbent: Jeakins Weir Limited
The contract is for the provision of enabling works and limited construction activities at Mancroft Road to support the proposed development of 18 new affordable homes. The works will include initial site preparation, clearance and associat…
- Published value
- £64k
- Annual run-rate
- —term under 6 months
- Term
- 5 Oct 2026 → 27 Nov 2026 · 2 months
- Reference
ocds-h6vhtk-078a30
- Ends · in 31 days
AJQ & FHQ Portico Maintenance Works 2026
Portsmouth City Council · Local authority · South East England
Incumbent: BAKER TRAYTE MARINE LIMITED
Maintenance works to Albert Johnson Quay and Flathouse Quay including fender repairs and replacements, ladder repairs and replacements, grab chain replacement, installation of low-friction fender panels, replacement of bolts and fixings, fa…
- Published value
- £61kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 17 Aug 2026 → 27 Nov 2026 · 3 months
- Reference
ocds-h6vhtk-06e25f
- Ends · in 31 days
Milton Hall Primary School - Roof Replacement and Repair
Southend-on-Sea City Council · Local authority · East of England
Incumbent: Edmunds Design & Construction Ltd
Replacement of flat roof along with resealing of 8 x skylights and 1 x large and 3 x small chimney stacks £44,060.00
- Published value
- £44k
- Annual run-rate
- —term under 6 months
- Term
- 26 Oct 2026 → 27 Nov 2026 · 33 days
- Reference
ocds-h6vhtk-07883c
- Ends · in 31 days
QQ26057 - Light refurbishment of the Children's library within the Central Library and Bilston library
Wolverhampton City Council · Local authority · West Midlands
Incumbent: William Gough & Sons Limited
The project comprises of a light refurbishment of the Children's library within the Central Library and Bilston library. The scope of works includes wall plaster repairs, decorations and new floor finishes. Note: all of the library's books,…
- Published value
- £43k
- Annual run-rate
- —term under 6 months
- Term
- 12 Oct 2026 → 27 Nov 2026 · 2 months
- Reference
ocds-h6vhtk-0788f1
- Ends · in 31 days
THH - Plantroom Upgrade
The Hillingdon Hospitals NHS Foundation Trust · Central government · Greater London
Incumbent: Spirax-Sarco Limited
Appointment of a provider for Mount Vernon Hospital AOS Plantroom Calorifier Upgrade at The Hillingdon Hospitals NHS Foundation Trust.
- Published value
- £43k
- Annual run-rate
- £43kpublished value ÷ term, exc. VAT
- Term
- 28 Nov 2025 → 27 Nov 2026 · 1 yr
- Reference
ocds-h6vhtk-05f89c
- Ends · in 31 days
Treorchy Comprehensive School - Electrical Rewire of Block 2 (Second Floor) Phase 1
Rhondda Cynon Taf CBC · Other public body · Wales (Cymru)
Incumbent: LLOYD ELECTRICAL CONTRACTORS LIMITED
Treorchy Comprehensive School - Electrical Rewire of Block 2 (Second Floor) Phase 1 2026
- Published value
- £27k
- Annual run-rate
- —term under 6 months
- Term
- 10 Aug 2026 → 27 Nov 2026 · 4 months
- Reference
ocds-h6vhtk-07747c
- Estimated end · in 32 days
Refurbishment of Bught Stadium & New Home of Shinty Pavilion, Inverness
The Highland Council · Local authority · Scotland
Incumbent: Clark Contracts Ltd · Last contest: 3 bids (3 SME)
Demolition of existing changing rooms, refurbishment of existing stadium and erection of new shinty pavilion and new replacement changing rooms.
- Published value
- £8.1m
- Annual run-rate
- —start date not published
- Term
- Estimated end 28 Nov 2026 · start not published
- Reference
ocds-h6vhtk-03d575
- Ends · in 32 days
Abington Library Refurbishment Works
West Northamptonshire Council · Local authority · East Midlands
Incumbent: Forstarr Building Services Ltd
1.1. West Northampton Council (the Authority) is inviting local Suppliers to bid for the following works. There is a separate room at the back of the library building that currently has limited use due to the poor state of repair with old f…
- Published value
- £400kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 14 Sept 2026 → 28 Nov 2026 · 2 months
- Reference
ocds-h6vhtk-06b5cd
- Ends · in 32 days
Cremator Reline Works
Boston Borough Council · Local authority · East Midlands
Incumbent: ENVIRONMENTAL COMBUSTION TECHNOLOGIES LIMITED
Urgent works to fully reline the cremator at Boston Crematorium.
- Published value
- £91k
- Annual run-rate
- —term under 6 months
- Term
- 31 Oct 2026 → 28 Nov 2026 · 29 days
- Reference
ocds-h6vhtk-0780af
- Ends · in 33 days
Contract for the provision of interim electrical works and associated services
RYKNELD HOMES LIMITED · Other public body · East Midlands
Incumbent: GAP Property Services (Leicester) Ltd
this contract is for the provision of interim electrical works and associated services. The contract is to support the Authority to be able to deliver works and services until such time a formal contract can be put in place. This contract r…
- Published value
- £750kinc. VAT as published
- Annual run-rate
- £1.1mpublished value ÷ term, inc. VAT
- Term
- 30 Mar 2026 → 29 Nov 2026 · 8 months
- Reference
ocds-h6vhtk-0673b8
- Ends · in 33 days
Boatyard Bath Road - Tiling
Clarion Housing Property Development Service Limited · Other public body
Incumbent: Anglian Tiling & Finishings Ltd
Tiling Contractor for Boatyard scheme at Bath Road, Bristol
- Published value
- £153k
- Annual run-rate
- £153kpublished value ÷ term, exc. VAT
- Term
- 30 Nov 2025 → 29 Nov 2026 · 1 yr
- Reference
ocds-h6vhtk-061484
- Ends · in 33 daysExtension option · up to 24 Dec 2026
Mobility Scooter Storage
North Northamptonshire Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: FOURWAYS FABRICATION LTD
Supply and install new mobility scooter storage pods/units
- Published value
- £40k
- Annual run-rate
- £77kpublished value ÷ term, exc. VAT
- Term
- 25 May 2026 → 29 Nov 2026 · 6 months · up to 24 Dec 2026 with extensions
- Reference
ocds-h6vhtk-068edb
- Ends · in 33 daysExtension option · up to 22 Dec 2026
Colne Roof Replacement
North Northamptonshire Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: A C ROOFING GROUP LTD
Replacement Roof to block 2-4 Colne Close
- Published value
- £33k
- Annual run-rate
- —term under 6 months
- Term
- 3 Aug 2026 → 29 Nov 2026 · 4 months · up to 22 Dec 2026 with extensions
- Reference
ocds-h6vhtk-06b896
- Ends · in 33 days
Medical Vacuum Plant Replacement Works
West Suffolk NHS Foundation Trust · Central government
Incumbent: M&M Medical Ltd
Provision of specialist medical gas infrastructure works to replace the vacuum plant serving the Trust's Day Surgery Unit. The works include the design, supply, installation, testing and commissioning of a replacement medical vacuum system …
- Published value
- £30k
- Annual run-rate
- £30kpublished value ÷ term, exc. VAT
- Term
- 30 Nov 2025 → 29 Nov 2026 · 1 yr
- Reference
ocds-h6vhtk-06dee2
- Estimated end · in 34 days
NUNCON – Lot 1 - Armson Road – Main Contractor
Nuneaton and Bedworth Borough Council · Local authority · West Midlands
Incumbent: J.HARPER & SONS(LEOMINSTER)LIMITED · Last contest: 1 bid (1 SME)
Lot 1 - Construction of 15 dwellings on the former garage site situated at Armson Road, Bedworth, CV79BT. Lot 2 - Construction of 8 dwellings on the former playground situated between 4 and 14 Cheverel Road, Bedworth, CV12 8HH. The contract…
- Published value
- £3.4m
- Annual run-rate
- —start date not published
- Term
- Estimated end 30 Nov 2026 · start not published
- Reference
ocds-h6vhtk-0484ea
- Estimated end · in 34 days
NUNCON– Lot 2 - Cheveral Road – Main Contractor
Nuneaton and Bedworth Borough Council · Local authority · West Midlands
Incumbent: J.HARPER & SONS(LEOMINSTER)LIMITED · Last contest: 1 bid (1 SME)
Lot 1 - Construction of 15 dwellings on the former garage site situated at Armson Road, Bedworth, CV79BT. Lot 2 - Construction of 8 dwellings on the former playground situated between 4 and 14 Cheverel Road, Bedworth, CV12 8HH. The contract…
- Published value
- £1.5m
- Annual run-rate
- —start date not published
- Term
- Estimated end 30 Nov 2026 · start not published
- Reference
ocds-h6vhtk-0484ea
- Ends · in 34 daysFramework recordPanel · 20 suppliers
NUN - HEART Disabled Aids, Adaptations and Associated Works
Nuneaton and Bedworth Borough Council · Local authority · West Midlands
Panel: 3MS Gold Services Ltd, APD Building, Adroit Services Limited +17 more
- Published value
- £18mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 30 Nov 2026 · start not published
- Reference
ocds-h6vhtk-0489f1
- Ends · in 34 daysExtension option
Works to complete the MMC Facility located at Manufacturing Hub, Seaton Delaval.
Northumbria Healthcare Facilities Management · Central government · North East England
Incumbent: Opus Building Services Ltd
Works to complete the Medicines Manufacturing Centre located at Northumbria Healthcare Manufacturing Hub, Seaton Delaval.
- Published value
- £7.5m
- Annual run-rate
- —term under 6 months
- Term
- 13 Aug 2026 → 30 Nov 2026 · 4 months
- Reference
ocds-h6vhtk-067a01
- Ends · in 34 days
Infrastructure Works at Hethel Technology Park
South Norfolk District Council · Local authority · East of England
Incumbent: Jackson Civil Engineering Group Limited · Last contest: awarded 22% under the estimate
South Norfolk Council (“SNC”, “the Council”) wishes to procure a suitably experienced Contractor to construct a roundabout on B1135 Wymondham Road and on-site link road to provide access to the new Hethel Technology Park and open-up Lotus e…
- Published value
- £3.9m
- Annual run-rate
- £5.3mpublished value ÷ term, exc. VAT
- Term
- 5 Mar 2026 → 30 Nov 2026 · 9 months
- Reference
ocds-h6vhtk-04f796
- Ends · in 34 days
Alterations and Refurbishment of Bideford Town Hall & Former Library
Torridge District Council · Local authority · South West England
Incumbent: Westcountry Maintenance Services Ltd
The project comprises alterations and refurbishment work to an existing Grade II listed complex of buildings previously used as a library and Torridge District Council’s town hall. The proposed works include demolition and construction of a…
- Published value
- £3.9m
- Annual run-rate
- £7.2mpublished value ÷ term, exc. VAT
- Term
- 18 May 2026 → 30 Nov 2026 · 6 months
- Reference
ocds-h6vhtk-06a5e2
- Ends · in 34 days
Mottistone 8 Bed Elective Ward
Isle of Wight NHS Trust · Central government · South East England
Incumbent: STONEHAM CONSTRUCTION LIMITED
Building services linked to the construction of a new 8 bed ward facility at St Marys Hospital, Newport, Isle of Wight.
- Published value
- £1.9m
- Annual run-rate
- £2.5mpublished value ÷ term, exc. VAT
- Term
- 23 Feb 2026 → 30 Nov 2026 · 9 months
- Reference
ocds-h6vhtk-065c23
- Ends · in 34 days
Boatyard, Bath Road, Bristol - Groundworks
Clarion Housing Property Development Service Limited · Other public body
Incumbent: Afan Landscapes Limited
Provision of external groundworks and hard landscaping for a new development situated at the Boatyard, Bath Road, Bristol
- Published value
- £1.9minc. VAT as published
- Annual run-rate
- £2.9mpublished value ÷ term, inc. VAT
- Term
- 15 Apr 2026 → 30 Nov 2026 · 8 months
- Reference
ocds-h6vhtk-06a2f7
- Ends · in 34 days
Leashaw Landslide Repair Works
Derbyshire County Council · Local authority · East Midlands
Incumbent: C.T. CONSTRUCTION LIMITED · Last contest: awarded 58% over the estimate
Derbyshire County Council is seeking an experienced single Contractor to provide repairs and all necessary reinstatement work for the Leashaw Landslip Repair Works at Holloway A landslip and subsequent retaining wall collapse has occurred i…
- Published value
- £1.4minc. VAT as published
- Annual run-rate
- £2.8mpublished value ÷ term, inc. VAT
- Term
- 29 May 2026 → 30 Nov 2026 · 6 months
- Reference
ocds-h6vhtk-065485
- Ends · in 34 days
-MRI 2 Replacement Refurbishment Works
Imperial College Healthcare NHS Trust · Central government
Incumbent: Cuffe PLC
Replacement and refurbishment works associated with MRI 2 at Charing Cross Hospital, including installation of a new air handling unit (AHU), air source heat pump, metal deck, RF cage, and refit of the MRI scanning room
- Published value
- £1.1m
- Annual run-rate
- —term under 6 months
- Term
- 10 Sept 2026 → 30 Nov 2026 · 3 months
- Reference
ocds-h6vhtk-06f527
- Ends · in 34 days
Fire Safety Works Guys Borough Wing
Guy's and St Thomas' NHS Foundation Trust · Central government
Incumbent: Golden Thread Fire Delay Ltd
A programme of fire safety improvement works has been initiated, covering all floors of the Borough Wing.
- Published value
- £1.0m
- Annual run-rate
- £600kpublished value ÷ term, exc. VAT
- Term
- 1 Apr 2025 → 30 Nov 2026 · 1.7 yrs
- Reference
ocds-h6vhtk-06c924
- Ends · in 34 days
e-ITT for the provision of Fire Safety Remediation and Refurbishment to Whitecroft, Hythe and Clarks Close, Ringwood
New Forest District Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: HAMPSHIRE PARTITIONING CONTRACTS LIMITED · Last contest: awarded 10% under the estimate
e-ITT for the provision of Fire Safety Remediation and Refurbishment to Whitecroft, Hythe and Clarks Close, Ringwood New Forest District Council (NFDC) is undertaking a full review of two council-owned housing blocks in Hampshire, namely Wh…
- Published value
- £897k
- Annual run-rate
- —term under 6 months
- Term
- 18 Jul 2026 → 30 Nov 2026 · 4 months
- Reference
ocds-h6vhtk-065a86
- Ends · in 34 days
Droitwich Leisure Centre - Phase 2 Car Park Reconstruction
Wychavon District Council · Local authority · West Midlands
Incumbent: Fitzgerald Contractors Limited
Phase 2 Car Park Reconstruction at Droitwich Leisure Centre
- Published value
- £625k
- Annual run-rate
- —term under 6 months
- Term
- 14 Sept 2026 → 30 Nov 2026 · 3 months
- Reference
ocds-h6vhtk-077bf1
- Ends · in 34 days
CN260659 - Ashford Oaks Community Primary School
Kent County Council · Local authority · South East England
Incumbent: G Baker Roofing Ltd.
The works comprise of the replacement of the roof weatherproof coverings and associated works.
- Published value
- £424k
- Annual run-rate
- —term under 6 months
- Term
- 25 Aug 2026 → 30 Nov 2026 · 3 months
- Reference
ocds-h6vhtk-06f4e2
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,65145Construction work2,08772IT services: consulting, software, internet1,61960Transport services (except waste transport)1,53771Architectural, construction, engineering1,41350Repair and maintenance services1,40680Education and training services1,254
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.