Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 1–9
- Estimated end · in 35 days
Seat Refresh Project
Caledonian Sleeper Limited · Scotland
Incumbent: Diamond Rail Services · Last contest: 2 bids (2 SME)
Caledonian Sleeper Limited (CSL) is seeking proposals from suitably qualified suppliers for the provision of replacement seat upholstery fabric for passenger seating, including armrest fabric installed within the Caledonian Sleeper fleet. T…
- Published value
- Not published
- Annual run-rate
- —value not published
- Term
- Estimated end 30 Nov 2026 · start not published
- Reference
ocds-h6vhtk-06bdcc
- Ends · in 36 days
Supply of Plastic Granules
Ministry of Justice · Central government · Nationwide (UK), North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands
Incumbent: Plastribution Ltd · Last contest: 2 bids
A Contract for the Supply and Delivery of Plastic Granules covering various grades and sizes. There are currently five plastics workshops in the prison estate manufacturing a range of products for internal use such as plates, mugs, knives, …
- Published value
- £2.8m
- Annual run-rate
- —start date not published
- Term
- Ends 1 Dec 2026 · start not published
- Reference
ocds-h6vhtk-034957
- Estimated end · in 46 daysFramework record
Textiles Bring Bank Collection Service - Multi-Borough Framework
London Borough of Lewisham · Local authority · Greater London
Incumbent: LMB Textiles Ltd
Textiles Bring Bank Collection Service - Multi-Borough Framework
- Published value
- £1.3mlargest agreement; total ceiling not published
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 12 Dec 2026 · start not published
- Reference
ocds-h6vhtk-02cfaf
- Ends · in 156 daysFramework recordPanel · 3 suppliers
861_25 Refuse Sacks
ESPO · Nationwide (UK)
Panel: Cromwell Polythene Ltd, Pakex (UK) Plc, SAI-PAC UK LTD
- Published value
- £2.3mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-047d13
- Estimated end · in 160 days
FMPG-2026-018 Epoxy Flooring
Ferguson Marine (Port Glasgow) Ltd · Scotland
Incumbent: DECK-RITE FLOORING LTD · Last contest: 3 bids (3 SME)
Ferguson Marine (Port Glasgow) Ltd has a requirement for the provision of and laying of epoxy flooring on MV Glen Rosa.
- Published value
- £155k
- Annual run-rate
- —start date not published
- Term
- Estimated end 5 Apr 2027 · start not published
- Reference
ocds-h6vhtk-06496f
- Ends · in 217 daysFramework recordPanel · 4 suppliers
Supply of Refuse Sacks, Bin & Caddy Liners, Soluble & Tiger Stripe Bags
East Riding of Yorkshire Council · Local authority · Yorkshire and the Humber
Panel: Arrow County Supplies, Cromwell Polythene Ltd, Imperial Polythene Products Ltd +1 more
- Published value
- £1.7mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 31 May 2027 · start not published
- Reference
ocds-h6vhtk-03a5b0
- Estimated end · in 226 days
SPS-02136 Provision of Material for High Risk Bedding and Clothing
Scottish Prison Service · Scotland
Incumbent: P and R Fabrics Ltd · Last contest: 1 bid (1 SME)
The SPS require a supplier to provide robust materials to be used for the production of high-risk clothing and bedding.
- Published value
- £44k
- Annual run-rate
- —start date not published
- Term
- Estimated end 10 Jun 2027 · start not published
- Reference
ocds-h6vhtk-041b15
- Estimated end · in 268 days
Supply of Rise and Recliner Chairs
Rhondda Cynon Taf CBC · Wales (Cymru)
Incumbent: Suite Options Ltd T/A Recliners · Last contest: 3 bids (3 SME) · awarded at the estimate
1.2. Vision Products is a supported business and part of Rhondda Cynon Taf County Borough Council and are the approved supplier to RCT, Merthyr Tydfil and Bridgend County Borough Councils along with Cwm Taf Morgannwg NHS Trust. Vision Produ…
- Published value
- £1.2m
- Annual run-rate
- —start date not published
- Term
- Estimated end 22 Jul 2027 · start not published
- Reference
ocds-h6vhtk-03c224
- Estimated end · in 271 days
Textile Collections from Recycle Centres
Bournemouth, Christchurch and Poole Council · Local authority · South West England
Incumbent: Salvation Army Trading Company Ltd · Last contest: 4 bids (3 SME)
BCP Council requires a supplier to collect textiles from recycling centres and bring banks located in Bournemouth, Christchurch and Poole. The textiles are collected for the purposes of reuse or recycling. Works are carried out on behalf of…
- Published value
- Not published
- Annual run-rate
- —value not published
- Term
- Estimated end 25 Jul 2027 · start not published
- Reference
ocds-h6vhtk-0458cb
When contracts end · Leather and textile fabrics i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
12 contracts and agreements end within 24 months, 20 in total · £4.1m published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 44 divisions shown.
85Health and social work services2,71579Business services: law, marketing, consulting67560Transport services (except waste transport)61650Repair and maintenance services60390Sewage, refuse, cleaning and environmental52245Construction work50072IT services: consulting, software, internet46771Architectural, construction, engineering454
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.