A303 Amesbury to Berwick Down (Stonehenge)
Authority: National Highways Limited (Central government)
What is being bought
Published requirement descriptionThe scheme is an integral part of National Highways commitment to deliver a high-performing, high-quality route along the A303/A358 corridor between the South West and South East. It will also help to conserve, reconnect and enhance the Stonehenge world heritage site (WHS), making it easier to reach and explore, as well as improving biodiversity and providing a positive legacy for nearby communities.
The scheme will be approximately 8 miles (13km) long and comprises the following key components:
- A northern bypass of Winterbourne Stoke with a viaduct over the River Till valley;
- A new junction between the A303 and A360 to the west of and outside the WHS, replacing the existing Longbarrow roundabout;
- a twin-bore tunnel approximately 2 miles (3.3km) long through the WHS; and
- a new junction between the A303 and A345 at the existing Countess roundabout.
CPV: Bridge-design services · Construction work for bridges · Construction work for bridges and tunnels, shafts and subways · Construction work for highways, roads · Construction work for tunnels · Construction work for tunnels, shafts and subways · Earthmoving work · Engineering design services for the construction of civil engineering works · Highway maintenance work · Highways engineering services · Repair, maintenance and associated services related to roads and other equipment · Road bridge construction work · +7 more
The lotProcurement structure
single lot · no lot value publishedLot #1The requirements of the scheme that will be the responsibility of the successful…Awarded
The requirements of the scheme that will be the responsibility of the successful applicant are principally captured in the following areas:
- Design and construction of the new works;
The scheme's new works includes the design and construction of the civil, mechanical, electrical and plumbing (MEP), technology and environmental components, key features of the new works are summarised below:
- Tunnel: A twin-bore tunnel portals and approach structures, tunnel service buildings and plant rooms, tunnel control system and mechanical, electrical and plumbing systems.
- Tunnel boring machine - design, manufacture, testing, shipping and on-site assembly.
- Carriageway works.
- Bridge works to form a viaduct over the River Till, an under bridge for the B3083, a flyover at the A345 Countess Roundabout, and 4 green bridges (Parsonage Down accommodation bridge, Winterbourne Stoke accommodation bridge, A360 Longbarrow Junction & green bridge No. 4).
- Carriageway and tunnel technology
- Landscaping and habitat creation.
- Extension of Parsonage Down National Nature Reserve.
- Protected species mitigation measures.
- Ensure rights of way and private means of access.
- Mainline earthworks
- Utilities works
- Refurbishment, replacement and modification of existing assets;
There are works required on existing assets under the current ownership of both National Highways and Wiltshire Council. Continued engagement and consultation will be required with both parties throughout the design and construction phases for these elements including:
- Existing A303 de-trunking works
- Demolition works and site clearance works
- Modification works to existing structures
- Maintenance and operation during construction
Maintenance and operation of the existing A303 within the site boundary will be required for the duration of the construction works. The appointed Contractor will be required to liaise with National Highways, its maintenance contractors and Wiltshire Council to coordinate activities.
- Post construction maintenance period
There is an extended maintenance period (minimum of 5 years, maximum of 7 years) after construction to 'prove' the tunnel performs as intended. Maintenance is included as part of this period and the Contractor will be responsible for all elements of the infrastructure associated with the tunnel and its approaches. The appointed Contractor will be required to liaise with National Highways, its maintenance contractors and Wiltshire Council to coordinate activities and tunnel operations.
The appointed Contractor will be required to fulfil the duties of Principle Designer and Principal Contractor under the Construction (Design and Management) Regulations 2015.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
- Quality Submission: Pass/ Fail
- Targeted Quality: Scored
- Price: Price adjusted by monetised TQ
Procedure terms & legal framework
From the official record · publisher note attached- Procedure method
- Competitive dialogue
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- Unspecified in notice
- First published
- 4 Oct 2022, 13:51 BST
- Last source update
- 4 Oct 2022, 13:51 BST
- FTS notice number
2022/S 000-027837- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-0372ceFind a Tender
- Review procedure
National Highways incorporated a minimum 10 calendar day standstill at the point information on award of the contract is communicate to tenderers.
Appeals must be logged in accordance with the Public Contracts Regulations 2015 (SI 2015 No. 102) as amended.
Publisher note: The planning application for the A303 Stonehenge is still pending redetermination by the Secretary of State for Transport, following the quashing of the decision to grant the Development Consent Order (DCO). This contract will only become live once the Secretary of State has concluded the planning process and only if this process results in a DCO being granted.
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| BeMo Tunnelling UK Ltd, FCC Construcción, S.A., Webuild S.p.A.joint award | £1,169,383,706 †very large published value · not counted until verified, check the notice | — | Awarded |
Contracts
A303 Amesbury to Berwick Down (Stonehenge) · BeMo Tunnelling UK Ltd, FCC Construcción, S.A., Webuild S.p.A.
- Signed
- 8 Sept 2022
- Value
- £1,169,383,706
- Status
- active
Bid statistics published by the authority
| Bids | SME | VCSE | Valid bid range |
|---|---|---|---|
| 3bids | — | — | — |
Contracting authority & participating public bodies
Dispute resolution & review bodies
- See details at VI.4.3Review body
Bidders & participating suppliers
3 commercial parties on the notice- BeMo Tunnelling UK LtdAwarded supplier
- FCC Construcción, S.A.Awarded supplier
- Webuild S.p.A.Awarded supplier