Find a TenderAwarded
Published 26 May 2021, 11:45 BST

Official UK procurement notice

Contract for the Maintenance of BIFoR Systems to the University of Birmingham

Official notice

Authority: THE UNIVERSITY OF BIRMINGHAM (Education)

GoodsNegotiated without publication of a contract notice
Awarded value£172,710published contract · exc. VAT
Awarded 19 May 2021
Awarded to Stardelta Power & Control

What is being bought

Published requirement description

The works consist of statutory and reactive maintenance of a liquid and gas CO2 storage and distribution system owned by the University of Birmingham, over a period of five years.

CPV: Fuel-gas systems

The lotProcurement structure

single lot · no lot value published
Lot #1The Birmingham Institute of Forest Research's (BIFoR) Free Air Carbon dioxide…

The Birmingham Institute of Forest Research's (BIFoR) Free Air Carbon dioxide Enrichment (FACE) experiment in Staffordshire, UK is designed to provide the scientific community with a new understanding of how mature oak woodlands will respond to a future climate with higher levels of carbon dioxide (CO2) in the atmosphere than exist at present. The experiment will expose large areas of woodland to elevated atmospheric CO2 at around 550 parts per million (ppm), which is the level we expect to reach by 2050.

The experiment consists of six arrays of towers within a woodland, each 30 m across, which extend from the ground to the top of the trees. CO2 will be released within three of these rings, while the other three will act as control plots and receive ambient air only.

Carbon dioxide is be stored in 3 x 40,000kg capacity Storage Vessels under pressure as a liquid. The liquid CO2 is converted to a gas using ambient heat vaporisers and transported in pipes through the woodland to the experimental arrays. Here, it is diluted with normal air until the level reaches ~550 ppm before being released into the research space. Sensors within the array are used by a computer to automatically adjust the amount and direction of released CO2 according to the speed and direction of the wind.

The University of Birmingham intends to award a contract for up to five years for the maintenance and calibration of the CO2 storage and delivery system at the facility. The works consist of statutory and reactive maintenance and the entire system is owned and managed by the University of Birmingham. A scheme of works has been developed that covers maintenance, calibration and statutory compliance over a five year period.

Stardelta Power and Control are considered to be the preferred supplier after providing these services for the previous five year period. The FACE experimental set up is bespoke in nature and unusual in the industrial market as the University owns the infrastructure. The normal mode of operation is to rent/hire such gas storage and distribution systems. The owner of the gas storage and delivery infrastructure would then in turn manage the maintenance, calibration and statutory compliance requirements. These arrangements are normally internal. For this reason it previously proved very difficult to identify companies with the requisite skills and resources to tender for the University owned BIFoR FACE facility. The University has identified that for reasons of timescale and to achieve its aims within available staff capacity and alongside its core business activities, the products supplied by Stardelta Power and Control are the only ones capable of meeting the University's requirements and this is the only viable option for the University at this time.

Delivery: West Midlands

Procedure terms & legal framework

From the official record
Procedure method
Negotiated without publication of a contract notice
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Goods
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
Unspecified in notice
First published
26 May 2021, 11:45 BST
Last source update
26 May 2021, 11:45 BST
Authority reference
SC9188/21
FTS notice number
2021/S 000-011702
Classification (CPV)
Fuel-gas systems
Delivery area
West Midlands (UKG)
Official registry OCID
ocds-h6vhtk-02b528 Find a Tender
Why no open competition

The works, supplies or services can be provided only by a particular economic operator due to absence of competition for technical reasons

Published justification

The University of Birmingham has made a considerable financial investment in procuring and installing the CO2 storage and distribution system at the Birmingham Institute of Forest Research (BIFoR) Free Air Carbon Dioxide Enrichment (FACE) facility. The equipment installed is standard equipment used across the commercial CO2 sector. However, the actual ownership of such equipment is unusual in the UK market especially for the industrial application of bulk gases by the user. The more common agreement is that the bulk gas supplier, in this case liquid CO2, also rents the storage vessels and distribution system to the client. The supplier then covers the maintenance, repairs and calibrations under the rental agreement. Due to the Universities unusual situation, very few companies with the requisite skills and technical capability are available to undertake such a contract as that on offer.

The University has an established relationship with Stardelta Power and Control who currently conduct the maintenance and calibration schedule of works while also providing a 24 hour repair service for ad hoc requirements. This supplier has proven to be reliable, efficient and cost effective. Further, Stardelta Power and Control are fully aware and respectful of the site requirements. The BIFoR FACE facility is situated within a woodland that is designed to mimic a non-intervention site and is considered pristine. It would be considered an unnecessary risk to introduce a new supplier at this stage of the experiment (half way through a decadal plan) to conduct heavy engineering works and invasive practices, especially considering the existing human resources available to supervise such activities.

The University has identified that for reasons of timescale and to achieve its aims within available staff capacity and alongside its core business activities, the products supplied by Stardelta Power and Control are the only ones capable of meeting the University's requirements and this is the only viable option for the University at this time.

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awards 1
Awarded value £172,7101 contract exc. VAT
Contracts signed 1latest 19 May 2021
Awarded toValueDateStatus
Stardelta Power & ControlSME£172,710 †—Awarded

Contracts

Contracting authority & participating public bodies

UNIVERSITY OF BIRMINGHAM

Contracting authorityEducationBody governed by public lawEducation Chancellors Court,Edgbaston, BIRMINGHAM, West Midlands, B152TTContact name, email

Dispute resolution & review bodies

  • The University of BirminghamReview body Birmingham

Bidders & participating suppliers

1 commercial party on the notice

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.