Official UK procurement notice
Ealing Community Diagnostic Centre - Contractor Framework Lot 1 and Lot 2
Authority: London North West University Healthcare NHS Trust (Central government)
What is being bought2 lots · detail below
Published requirement descriptionThe establishment of a framework in two lots to award two contracts to two contractors. Lot 1 for Phase 1 Works and Services and Lot 2 for Phase 2 Works and Services. Both contracts are for the design and construction of new facility at Ealing Hospital. The scope of works and services in each phase are further described in the PQQ Documentation. Works will comprise of substantial refurbishment and extension of existing buildings to provide new community diagnostic centre. Contracts to be awarded on a two stage design and build basis using JCT DB2016 incorporating pre-construction services.
CPV: Architectural and building-surveying services · Architectural design services · Architectural, engineering and surveying services · Building consultancy services · Building services consultancy services · Civil engineering consultancy services · Construction work · Construction work for buildings relating to health · Consultative engineering and construction services · Engineering design services · Engineering design services for mechanical and electrical installations for buildings · Engineering services · +7 more
How this framework works
From the published notice- Places
- up to 2 suppliers
Lots and requirements (2)Procurement structure
2 lots · all with a published value · win at most 1 of themLot #1Phase 1 Works and ServicesPublished value£11,000,000
Phase 1 Works and Services will comprise of the design and construction of new facility at Ealing Hospital. Works will comprise of substantial refurbishment and extension of existing buildings to provide new community diagnostic centre. Contracts to be awarded on a two stage design and build using JCT DB2016 incorporating pre-construction services.
Lot #2Phase 2 Works and ServicesPublished value£3,600,000
Phase 2 Works and Services will comprise of the design and construction of new facility at Ealing Hospital. Works will comprise of substantial refurbishment and extension of existing buildings to provide new community diagnostic centre. Contracts to be awarded on a two stage design and build using JCT DB2016 incorporating pre-construction services.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
- Suitability
Applicants will be required to complete a Pre-Qualification Questionnaire (PQQ) consistent with the provisions of Regulation 58 of the Public Contracts Regulations 2015 (as amended). The minimum requirements that Applicants are required to meet are set out in the PQQ. The PQQ is available from the address at I.1 and must be returned to that address by the date stipulated in IV.2.2.
- Staff
- Names and qualifications of delivery staff must be submitted
- “Ealing Community Diagnostic Centre - Contractor Framework Lot 1 and…” is a framework: the contest is a place on its panel, up to 2 suppliers, not a single contract.
Procedure terms & legal framework
From the official record · publisher note attached- Procedure method
- Restricted procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Closed
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- No (one-off requirement)
- First published
- 23 Feb 2023, 14:55 GMT
- Last source update
- 23 Feb 2023, 14:55 GMT
- FTS notice number
2023/S 000-005444- Accelerated
This is justified on the basis of Department of Health requirements to have Community Diagnostic Centres in operation no later than year end 2023. There is therefore an urgent requirement to onboard contractors to commence work as soon as possible.
- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-03ab7eFind a Tender
- Electronic trading
- e-invoicing allowed · electronic ordering · electronic payment
Publisher note: Applicants should note that the estimated value of the Framework as set out in this Notice is based on the Contracting Authority’s current anticipated requirements. The Contracting Authority reserves the right to cancel the procurement at any time and not to proceed with all or part of the Framework Agreement. The Contracting Authority will not, under any circumstance, reimburse any expense incurred by Applicants in preparing their tender submissions.
How it was run
Official noticeTender documents are also served through a separate tool: https://health-family.force.com/s/Welcome ↗
- Appointment period ends
- 10 Mar 2023, 12:00 GMT
- Submission channel
- {"electronicSubmission","written"}
- Accepted languages
- en
Timeline
23 Feb 2023 → 31 Jul 2023 · 4 dates- Notice published23 Feb 2023, 14:55 GMT
- Admission / appointment period endsperiod end, not a bid countdown10 Mar 2023, 12:00 GMT
- Invitations to tender expected17 Mar 2023
- Bids must remain valid until31 Jul 2023, 23:59 BST
Contracting authority & participating public bodies
Dispute resolution & review bodies
- Cabinet OfficeReview contact point
- Centre for Effective Dispute ResolutionMediation body
- LNWH Procurement ServicesReview body
Official documents & specifications (2)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria
- Technical selection criteria