Find a TenderClosedTender notice
Published 29 Jul 2025, 18:17 BST

Official UK procurement notice

Greater Manchester Region Local Electric Vehicle Infrastructure (LEVI) - Concession Contract

Official notice

Authority: Transport for Greater Manchester (Public body)·Consortium: 11 public authorities

ServicesCompetitive flexible procedureAbove thresholdConcession
Concession value (operator's revenue)£166,000,000operator revenue, not the authority's budget
Submissions closed 25 Sept 2025
Contract term 20 yrsends 16 Apr 2046 · up to 16 Apr 2047 with extensions · starts 16 Apr 2026

What is being bought

Published requirement description

Background to the procurement

TfGM is currently tendering for the Provision of Local Electric Vehicle Charging Infrastructure.

The purpose of this procurement exercise is to enable prospective Suppliers to submit a tender detailing how they would introduce additional chargepoints in predominantly on-street locations on land owned by or under the control of public bodies across Greater Manchester. Utilising funding provided by the Department for Transport for the LEVI programme; this is a collaborative initiative with TfGM (who will be administering the procurement and installation phases) and the 10 Local Authorities that make up the Greater Manchester Combined Authority.

The LEVI programme aims to increase the provision of electric vehicle charging infrastructure across the country primarily in areas where local residents do not have access to off street parking or find it difficult to access a chargepoint.

The winning Supplier will be appointed by TFGM on behalf of the wider consortium. The wider consortium is made up of the following Local Authorities:

Bolton Metropolitan Borough Council

Bury Council

Manchester City Council

Oldham Metropolitan Borough Council

Rochdale Borough Council

Salford City Council

Stockport Metropolitan Borough Council

Tameside Metropolitan Borough Council

Trafford Metropolitan Borough Council

Wigan Metropolitan Borough Council

As a Tranche 1 authority Greater Manchester as a whole has received £16.158 million of LEVI capital funding with the expectation that this will contribute towards our 2030 targets for electric vehicle charging provision. A number of GM Authorities have also added an additional sum of City Region Sustainable Transport Settlement (CRSTS) funding to the LEVI amonut, which will make the total available for this project become £17.908 million.

In line with the intention of this funding, TfGM is seeking a Supplier to increase provision of chargepoints, in the following types of locations spread across the region:

Council-owned car parks for both local and destination charging. In regards to the LEVI fund, the car parks in scope would need to be in proximity (roughly 5-min walk) to residential areas and be appropriate for overnight charging.

Off-street locations in the form of hubs on other public-owned land

On-street - including standalone bollards, lamp columns.

Full details of the requirement and context of the procurement can be found in the PSQ and Main Tender documents.

The Procurement

Originally, this procurement exercise was to be completed under the old PCR15 regulations. Pre-market engagement was undertaken under these regulations back in 2024, with a PIN notice being published in August of that same year.

Suppliers wishing to take part in this project are invited to 'express an interest' in order to gain access to the full suite of procurement documents in the e-tendering system (Pro-Contract).

Please allow sufficient time to make your return, as Tender submissions cannot be uploaded and submitted after this return deadline.

Suppliers are to ensure that where possible documents are uploaded and that file names are succinct.

Any questions relating to this procurement must be made via the messaging service on the e-tendering portal and in accordance with the procurement documents.

Suppliers should be aware that due to the nature of the Services required, any Contract formed as a result of this procurement process shall be executed as a deed. Suppliers should seek independent legal advice on the implications of this prior to submitting their tender, where appropriate.

Please note that the contract requirements will be subject to available financial resources, supplier performance and flexibility to meet changing demands.

The value estimated on this notice is the amount of revenue that the successful supplier could achieve over the duration of the contract, based on a minimum of 3000 chargepoints being installed and in place for a 20-year period.

TfGM will be using the Proactis / Pro-Contract e-tendering portal to manage all stages of this Competitive Flexible procedure, the details of which can be found below.

All of the tender documents associated with this Competitive Flexible procedure will be shared with Suppliers right from the beginning but Suppliers are asked to read the 'Tender Process Explanation - READ FIRST' document before any of the other documents, as this will provide guidance as to the process and indicate what documents need completing and when.

As this tender is being ran under the Procurement Act 23, Suppliers will need to ensure that they have registered on the Central Digital Platform (CDP) before submitting their bid for the PSQ stage initially, and Suppliers will be required to share the financial information, associated persons information etc. that they will be relying on for their bid, from the CDP when they submit their response. This information will form part of the evaluation process.

  • Not divided into lots: There will be one single lot for all the required EV charging equipment on this contract. As there are a number of contracting authorities involved within this procurement and the forthcoming contract (11), it was decided that there will be just one supplier for all the works and services required to ensure contract management is simpler and the objectives of the LEVI funding are fully met. TFGM are actively encouraging suppliers (including smaller and more bespoke suppliers) to work together either as consortiums or SPVs -Special Purpose Vehicles, so they can bid together for this single lot.
  • How the procedure runs: This competition is being conducted under the competitive flexible procedure pursuant to sections 19 and 20 of the Procurement Act 2023. This procurement is for the award of a concession contract pursuant to section 8 of the Procurement Act 2023. The procurement process leading to the award of this agreement is anticipated to comprise two main stages: qualification and award. At the outcome of the first stage, qualification, the GM Authorities will have established a shortlist of Suppliers. TfGM intends to shortlist a maximum of 5 Suppliers (provided there are sufficient suitable suppliers). These will be the 5 highest scoring Suppliers found at this stage, and the evaluation methodology to be applied to find those 5 is fully detailed in the PSQ document. TfGM will inform all Suppliers who submit a completed PSQ response whether or not they have been shortlisted to move to the next stage and only the 5 chosen Suppliers will be told by TfGM when to complete the Main ITT document via the e-sourcing portal. Any interested Suppliers can complete the PSQ document and return it to TfGM for evaluation. The PSQ will include questions on the Supplier's legal and financial capacity plus a number of scored and evaluated questions around the Supplier's technical ability (based on previous experience) to perform this contract. Supplier's that fail any of the mandatory pass / fail questions or are not on the 5 highest scoring Suppliers will not progress to the next part of the procurement process. TfGM will enact a standstill period at the end of the PSQ process and will provide feedback to unsuccessful Suppliers at this point. The award stage will commence with the shortlisted Suppliers once the standstill period that has been allowed for at this stage, has been completed. The documents making up the Main ITT will contain qualitative questions related to the Suppliers bid and detailed information regarding the award process and award criteria. It is at this point in the process only, that Suppliers will be required to complete the commercial document (Part B - Appendix 3).

CPV: Electrical installation work · Installation services of electrical equipment · Repair, maintenance and associated services of vehicles and related equipment

The lotProcurement structure

single lot · value published
Lot #1Renewal 20 yrsPublished value£166,000,000
Contract period: 16 Apr 2026 – 16 Apr 2046 (20 yrs) · up to 16 Apr 2047 with extensionsValue: £166,000,000 exc. VAT · £199,000,000 inc. VAT
Delivery: North West
Extensions: The single optional extension year may be taken up for administration purposes, if there is a need to enact it.Second stage: up to 5 candidates invited to tender
Pre-qualification & selection criteria (PQQ)3
  • Economic & financial standing

    A financial risk assessment methodology has been provided as part of the attachments to the PSQ. Prospective Suppliers are required to read this information thoroughly and follow the instructions in order to complete the self-assessment prior to the PSQ submission deadline.

    Suppliers are required to confirm whether they already have, or can commit to obtain, prior to the commencement of the contract, the levels of insurance cover indicated below:

    Employer's (Compulsory) Liability Insurance = £10,000,000

    Public Liability Insurance = £25,000,000

    Professional Indemnity Insurance = £5,000,000

    Product Liability Insurance = £10,000,000

    Cyber Liability Insurance = £5,000,000

    A response of 'No' or failure to attach suitable evidence of the commitment will Fail to meet this condition of participation.

  • Technical & professional ability

    In the PSQ there are x6 Technical Ability questions, scored in line with the award criteria found within the same document.

    The score for each question will be added together to give a Total Score (out of 100%) for each Supplier. All Suppliers who receive a Total Score will be ranked by score and the top 5 ranked Suppliers will be invited to tender.

  • Condition of participation

    TfGM intends to shortlist a maximum of 5 Suppliers (provided there are sufficient suitable suppliers). These will be the 5 highest scoring Suppliers found at this stage, and the evaluation methodology to be applied to find those 5 is fully detailed in the PSQ document.

    TfGM will inform all Suppliers who submit a completed PSQ response whether or not they have been shortlisted to move to the next stage and only the 5 chosen Suppliers will be told by TfGM when to complete the Main ITT document via the e-sourcing portal.

    shortlisting

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored
Quality: 70%Price: 30%
Published sub-criteria (2)
  • Qualitative: 70%
  • Commercial: 30%
Published award criteria (2)
  • Qualitative: Qualitative elements as fully detailed in Main ITT document including Social Value.
  • Commercial: Commercial criterion as fully detailed in Main ITT document and Appendix 3 document.
Conditions of participation3
  • Economic & financial standing

    A financial risk assessment methodology has been provided as part of the attachments to the PSQ. Prospective Suppliers are required to read this information thoroughly and follow the instructions in order to complete the self-assessment prior to the PSQ submission deadline.

    Suppliers are required to confirm whether they already have, or can commit to obtain, prior to the commencement of the contract, the levels of insurance cover indicated below:

    Employer's (Compulsory) Liability Insurance = £10,000,000

    Public Liability Insurance = £25,000,000

    Professional Indemnity Insurance = £5,000,000

    Product Liability Insurance = £10,000,000

    Cyber Liability Insurance = £5,000,000

    A response of 'No' or failure to attach suitable evidence of the commitment will Fail to meet this condition of participation.

  • Technical & professional ability

    In the PSQ there are x6 Technical Ability questions, scored in line with the award criteria found within the same document.

    The score for each question will be added together to give a Total Score (out of 100%) for each Supplier. All Suppliers who receive a Total Score will be ranked by score and the top 5 ranked Suppliers will be invited to tender.

  • Condition of participation

    TfGM intends to shortlist a maximum of 5 Suppliers (provided there are sufficient suitable suppliers). These will be the 5 highest scoring Suppliers found at this stage, and the evaluation methodology to be applied to find those 5 is fully detailed in the PSQ document.

    TfGM will inform all Suppliers who submit a completed PSQ response whether or not they have been shortlisted to move to the next stage and only the 5 chosen Suppliers will be told by TfGM when to complete the Main ITT document via the e-sourcing portal.

    shortlisting
What this means for your bid
  • Price carries 30 of 100 points: a 10% discount moves about 3 points. The method statement decides this lot, not the discount.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Competitive flexible procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Services
Notice status
Closed
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Concession
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
Unspecified in notice
First published
29 Jul 2025, 18:17 BST
Last source update
29 Jul 2025, 18:17 BST
Award evaluation window
Submission end – 1 Apr 2026
FTS notice number
2025/S 000-044041
Latest notice
Tender notice (UK4)
Classification (CPV)
Electrical installation workInstallation services of electrical equipmentRepair, maintenance and associated services of vehicles and related equipment
Delivery area
North West (UKD3)
Official registry OCID
ocds-h6vhtk-056879 Find a Tender
Contract terms summary

Payment terms / milestones - Details within the relevant schedule of Part C.

How it runs

This competition is being conducted under the competitive flexible procedure pursuant to sections 19 and 20 of the Procurement Act 2023. This procurement is for the award of a concession contract pursuant to section 8 of the Procurement Act 2023. The procurement process leading to the award of this agreement is anticipated to comprise two main stages: qualification and award. At the outcome of the first stage, qualification, the GM Authorities will have established a shortlist of Suppliers.

TfGM intends to shortlist a maximum of 5 Suppliers (provided there are sufficient suitable suppliers). These will be the 5 highest scoring Suppliers found at this stage, and the evaluation methodology to be applied to find those 5 is fully detailed in the PSQ document. TfGM will inform all Suppliers who submit a completed PSQ response whether or not they have been shortlisted to move to the next stage and only the 5 chosen Suppliers will be told by TfGM when to complete the Main ITT document via the e-sourcing portal.

Any interested Suppliers can complete the PSQ document and return it to TfGM for evaluation.

The PSQ will include questions on the Supplier's legal and financial capacity plus a number of scored and evaluated questions around the Supplier's technical ability (based on previous experience) to perform this contract. Supplier's that fail any of the mandatory pass / fail questions or are not on the 5 highest scoring Suppliers will not progress to the next part of the procurement process. TfGM will enact a standstill period at the end of the PSQ process and will provide feedback to unsuccessful Suppliers at this point.

The award stage will commence with the shortlisted Suppliers once the standstill period that has been allowed for at this stage, has been completed. The documents making up the Main ITT will contain qualitative questions related to the Suppliers bid and detailed information regarding the award process and award criteria. It is at this point in the process only, that Suppliers will be required to complete the commercial document (Part B - Appendix 3).

Review and risk notes
Risks

Risk - Contractor going into administration

Impact - need to find a new contractor to complete installation works or to take on management of installed assets, depending on when the risk occurs.

Risk - Changes in EVCI chargepoint standards or regulations

Impact - the project could be delay during the installation phase, costs could be increased and equipment might need to be changed to meet new standards or regulations.

Risk - LA partner deciding to withdraw from programme.

Impact - Change to geographical spread of chargepoints installed across the region, which could affect concessionaire's commercial model.

Risk - Changes to National Grid capacity and/or costs

Impact - Reduction in number of chargepoints installed during delivery period and increased value of funding required per chargepoint.

Risk - Escalation of international conflicts / Increase of trade tariffs / Emergence of Epidemic/Pandemic

Impact - Significant rise in costs or lack of availability of equipment and materials.

How it was run

Official notice
Run through: portal not identified
Electronic submission allowedLanguage: EN
Requests to participate (first stage)
25 Sept 2025, 15:00 BST
Submission deadline
25 Sept 2025, 15:00 BST
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

TfGM are using Pro-Contract / The Chest for the management of this procurement. This is where the tender documents will be held and where suppliers must submit their bids.

The Pro-Contract ref number is DN782439.

If interested suppliers are not registered already on this e-sourcing portal, we recommend that they do so as soon as possible. Here is the link to register - procontract.duenorth.com/Register ↗

Timeline

29 Jul 2025 → 16 Apr 2026 · 4 dates
  1. Tender notice published
    29 Jul 2025, 18:17 BST
  2. Submission deadline399 days ago
    25 Sept 2025, 15:00 BST
  3. Award decision expected by211 days ago
    1 Apr 2026, 23:59 BST
  4. Contract starts197 days ago
    16 Apr 2026, 00:00 BST

Notice history

1 event · 1 release on Find a Tender
  1. Tender notice published
    29 Jul 2025, 18:17 BST
    UK4

Contracting authority & participating public bodies

11 public bodies on the notice

Transport for Greater Manchester

Contracting authorityPublic authority - sub-central government GB-PPON: PNJQ-2746-NWYT 2 Piccadilly Place, Manchester, North West, M1 3BGContact email

Consortium members and other public bodies

  • Bolton Metropolitan Borough CouncilContracting authorityPublic authority - sub-central governmentGB-PPON: PBJZ-9785-JTLD Bolton, North WestContact email
  • Manchester City CouncilContracting authorityPublic authority - sub-central governmentGB-PPON: PLNV-8798-LDMP Manchester, North WestContact email
  • Metropolitan borough of BuryContracting authorityPublic authority - sub-central governmentGB-PPON: PVVT-2483-WWMH Bury, North WestContact email
  • Oldham Metropolitan Borough CouncilContracting authorityPublic authority - sub-central governmentGB-PPON: PMRJ-8362-DVNT Oldham, North WestContact email
  • Rochdale Borough CouncilContracting authorityPublic authority - sub-central governmentGB-PPON: PXXD-6682-MDRX Rochdale, North WestContact email
  • Salford City CouncilContracting authorityPublic authority - sub-central governmentGB-PPON: PRCJ-7674-MRWM Manchester, North WestContact email
  • Stockport Metropolitan Borough CouncilContracting authorityPublic authority - sub-central governmentGB-PPON: PZGW-7196-LCHL Stockport, North WestContact email
  • Tameside Metropolitan Borough CouncilContracting authorityPublic authority - sub-central governmentGB-PPON: PVWB-2493-LWTQ Ashton under Lyne, North WestContact email
  • Trafford CouncilContracting authorityPublic authority - sub-central governmentGB-PPON: PGZW-1429-QQZQ Manchester, North WestContact email
  • Wigan CouncilContracting authorityPublic authority - sub-central governmentGB-PPON: PCGG-6481-TZPW Wigan, North WestContact email

Official documents & specifications (2)

Official links; attachments are not copied

Tender pack and attachments

  • Bidding documents and specificationstenderBidding documents and specificationsAccess: TfGM are using Pro-Contract / The Chest for the management of this procurement. This is where the tender documents will be held and where suppliers must submit their bids. The Pro-Contract ref number is DN782439. If interested suppliers are not registered already on this e-sourcing portal, we recommend that they do so as soon as possible. Here is the link to register - https://procontract.duenorth.com/Register

Notices published for this procedure

  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender