Harrow Campus Masterplan Consultancy
Authority: THE UNIVERSITY OF WESTMINSTER (Education)·Consortium: 2 public authorities
What is being bought10 lots · detail below
Published requirement descriptionConsultancy support on the Harrow Campus Masterplan Project.
The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026.
The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application.
Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.
CPV: Architectural, construction, engineering and inspection services · Construction consultancy services
Lots and requirements (10)Procurement structure
10 lots · all with a published value (£150,000,000 together)Lot #1Harrow Campus Masterplan Consultancy - ArchitectCancelledPublished value£15,000,000
Architect Consultancy support on the Harrow Campus Masterplan Project.
The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026.
The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application.
Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.
Lot #2Harrow Campus Masterplan Consultancy - Planning ConsultantCancelledPublished value£15,000,000
Planning Consultancy support on the Harrow Campus Masterplan Project.
The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026.
The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application.
Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.
Lot #3Harrow Campus Masterplan Consultancy - Services (M&E)CancelledPublished value£15,000,000
Services (M&E) Consultancy support on the Harrow Campus Masterplan Project.
The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026.
The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application.
Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.
Lot #4Harrow Campus Masterplan Consultancy - Civil EngineerCancelledPublished value£15,000,000
Civil Engineer Consultancy support on the Harrow Campus Masterplan Project.
The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026.
The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application.
Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.
Lot #5Harrow Campus Masterplan Consultancy - Fire ConsultantCancelledPublished value£15,000,000
Fire Consultancy support on the Harrow Campus Masterplan Project.
The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026.
The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application.
Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.
Lot #6Harrow Campus Masterplan Consultancy - Project ManagerCancelledPublished value£15,000,000
Project Manager support on the Harrow Campus Masterplan Project.
The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026.
The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application.
Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.
Lot #7Harrow Campus Masterplan Consultancy - Cost ManagerCancelledPublished value£15,000,000
Cost Manager support on the Harrow Campus Masterplan Project.
The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026.
The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application.
Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.
Lot #8Harrow Campus Masterplan Consultancy - Acoustics and BREEAMCancelledPublished value£15,000,000
Acoustic and BREEAM Consultancy support on the Harrow Campus Masterplan Project.
The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document. The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026.
The consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application.
Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.
Lot #9AcousticianPublished value£15,000,000
The University is seeking a suitably experienced supplier/s to provide Consultancy support on the Harrow Campus Masterplan Project.
The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document.
The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026.
The tender for the consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application.
Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.
Lot #10Principal designerPublished value£15,000,000
The University is seeking a suitably experienced supplier/s to provide Consultancy support on the Harrow Campus Masterplan Project.
The University of Westminster Harrow Campus is part of the wider Northwick Park Masterplan, for which there are 4 landowners that collectively own the land. The information about the One Public Estate masterplan (OPE) is included as an appendix to the scope document.
The OPE masterplan has an outline planning permission, and the planning strategy is to apply for approval of reserve matters .The application should be submitted within 3 years of the outline permission therefore no later than January 2026.
The tender for the consultants will be for all phases and all buildings , but the team will be appointed initially for RIBA stage 1 for all buildings. Then the appointment will be initially for the buildings included in reserve matters first application.
Full scope details can be found in Harrow Campus Masterplan Scope for Design Team.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Procedure terms & legal framework
From the official record- Procedure method
- Restricted procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Services
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- No (one-off requirement)
- First published
- 10 Feb 2023, 13:16 GMT
- Last source update
- 30 Aug 2024, 11:48 BST
- Authority reference
DN655895- FTS notice number
2024/S 000-027729- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-03a4b2Find a Tender
- Electronic trading
- e-invoicing allowed
How it was run
Official notice- Submission deadline
- 13 Mar 2023, 11:00 GMT
- Submission channel
- {"electronicSubmission"}
- Accepted languages
- en
- Participation fee
- document
Timeline
13 Mar 2023 → 30 Aug 2024 · 4 dates- Submission deadline13 Mar 2023, 11:00 GMT
- Invitations to tender expected16 Mar 2023
- Contract starts15 May 2023, 00:00 BST
- Notice published30 Aug 2024, 11:48 BST
Notice history
2 events · 2 releases on Find a Tender · since 30 Aug 2024- Status changed to complete30 Aug 2024, 11:48 BST
- Buyer details updated30 Aug 2024, 11:48 BST
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| Not linked to a lot1 award | |||
| Buro Happold Ltd, Campbell Reith Hill LLPSME, Exigere LLPSME, Hoare Lea LLP, PRP ARCHITECTURE LLPSME, Sphere25 +2 morejoint award | — | — | Awarded |
Contracts
Contract 027729-2024-1 · Buro Happold Ltd, Campbell Reith Hill LLPSME, Exigere LLPSME, Hoare Lea LLP, PRP ARCHITECTURE LLPSME, Sphere25 +2 more
- Signed
- 29 Aug 2023
- Value
- —
- Status
- active
Bid statistics published by the authority
| Bids | SME | VCSE | Valid bid range |
|---|---|---|---|
| 45bids | — | — | £100,000 – £2,000,000 |
Contracting authority & participating public bodies
2 public bodies on the noticeDispute resolution & review bodies
- University of WestminsterReview body
Bidders & participating suppliers
8 commercial parties on the notice- Buro HappoldAwarded supplier
- Campbell Reith Hill LLPAwarded supplier
- Exigere LLPAwarded supplier
- Hoare LeaAwarded supplier
- PRP Architecture LLPAwarded supplier
- Sphere25Awarded supplier
- Troup Bywaters + AndersAwarded supplier
- Turner & TownsendAwarded supplier
Official documents & specifications (2)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria
- Technical selection criteria