Official UK procurement notice
HMS Warrior Dry Docking & Moorings Professional Team PIN
Authority: NMRN Operations
What is being bought
Published requirement descriptionHMS Warrior was built in 1860, is berthed at the National Museum of the Royal Navy (NMRN) Portsmouth and
was last dry-docked in 2004 in the Portsmouth Naval Base (PNB). NMRN are planning to dry-dock HMS Warrior
for hull, onboard moorings and rigging maintenance, when a dry-dock is available within the PNB. The
availability of a dry-dock is dependent on Royal Navy requirements so the dry-docking may be during the winter of 23/24 or winter 24/25. Whilst the ship is in dry-dock, the permanent sea moorings are to be serviced or renewed and her berth dredged.
HMS Warrior was the Royal Navy’s first iron hulled warship, launched in 1860 in Blackwall, London. The ship featured innovations such as hybrid propulsion of steam engines and sail, and advanced weaponry for the time.The speed of innovations at the time meant she was placed in reserve a mere 12 years after commissioning. Warrior became a training ship, then an oil hulk in Pembroke, Wales until being saved for preservation in 1979.
She was fully restored at Hartlepool before returning to Portsmouth in 1987.
The proposed scope of works can be found on the link to Contracts Finder for the specific Lots that will be undertaken with this project. These requirements may change in scope and available funding, so this is currently indicative of at the time of writing.
Clarifications or registering of interest must be done by emailing tenders@nmrn.org.uk
The NMRN have provisionally indicated the tender for this might begin in July 2023, but this may change as it is currently provisional.
PIN Notice in full can be found here;
CPV: Architectural, engineering and surveying services · Health and safety consultancy services · Marine construction works · Marine survey services · Repair, maintenance and associated services related to aircraft, railways, roads and marine equipment
The lotProcurement structure
single lot · no lot value publishedLot #1It is currently at the PIN stage, which will then go out to tender as an Open ProcedurePlanned
It is currently at the PIN stage, which will then go out to tender as an Open Procedure.
The NMRN will likely split the work into Lots, but it is dependant on funding and timeline of the work to be carried out.
Procedure terms & legal framework
From the official record · publisher note attached- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Past planning notice
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- Unspecified in notice
- First published
- 19 May 2023, 11:38 BST
- Last source update
- 19 May 2023, 11:38 BST
- FTS notice number
2023/S 000-014311- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-03cdcdFind a Tender
Publisher note: NOTE: To register your interest in this notice and obtain any additional information please visit the myTenders Web Site at https://www.mytenders.co.uk/Search/Search_Switch.aspx?ID=229444. (MT Ref:229444)
How it was run
Official notice- Submission deadline
- —
Timeline
19 May 2023 → 1 Jul 2023 · 2 dates- Notice published19 May 2023, 11:38 BST
- Tender notice expected1 Jul 2023, 00:00 BST
Commercial outcome & contract awards
Pipeline notice- Awards (0)
- No award published
- Contracts (0)
- No contract published
- Bid statistics
- No aggregate bid statistics published
Contracting authority & participating public bodies
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.