Official UK procurement notice
ITT - Swindon Archive Decarbonisation Design Team (UID 320)
Authority: Historic England (Central government)
What is being bought
Published requirement descriptionHistoric England is seeking to appoint a multidisciplinary design team to develop the Archive Decarbonisation Project at its national archive facility in Swindon through RIBA Stage 3. Under the terms of this contract, we reserve the right to award RIBA stage 4 following the satisfactory completion of stage 3 and the receipt of an acceptable return for Stage 4 methodology and pricing schedule (in line with rates provided at stage 3).
The Historic England Archive is one of the nation's most significant collections of records relating to England's historic environment. The purpose-built archive store was constructed in 1993 to BS5454 standards and provides specialist environmental conditions for the long-term preservation of nationally important photographic, film and documentary collections. However, the building and its associated mechanical and electrical systems were not designed with energy efficiency or net-zero objectives in mind.
The project forms a key part of Historic England's commitment to achieve net-zero carbon emissions by 2040 and responds to the urgent requirement to replace ageing building services plant that has reached, and in some cases exceeded, its operational life. Recent equipment failures have highlighted the increasing risk to collection preservation, building resilience and operational continuity.
A RIBA Stage 2 feasibility study has recently been completed. The study explored a range of options to reduce operational carbon, improve energy performance and secure the long-term sustainability of the archive while maintaining stringent environmental conditions required for collection care.
Based on the information provided, Historic England's preferred option currently involves:
- Replacement of existing end-of-life environmental control systems with significantly more energy-efficient solutions.
- Rationalisation of archive environmental zones to improve operational efficiency.
- Fabric improvements to enhance thermal performance and airtightness.
- Fire safety upgrades and associated building works.
- Creation of additional archive storage capacity through the repurposing of existing plant room space, reducing reliance on external storage facilities and supporting future collection growth.
Scope of Services
The appointed design team will be required to lead the project through:
RIBA Stage 3 – Spatial Coordination
Including but not limited to:
- Review and validation of the completed RIBA Stage 2 outputs.
- Development of the preferred design solution.
- Coordination of architectural, structural and building services design, ensuring full integration of archive operational, conservation and storage requirements, and compliance with relevant standards and guidance, including BS EN 16893:2018 Evaluation and mitigation of collection care risks associated with proposed mechanical solutions.
- Interpretation and integration of thermographic surveys, air-tightness testing and other specialist investigations.
- Use and develop the client-provided Revit BIM model as the principal tool for multidisciplinary spatial coordination, ensuring that all proposed building-services systems, plant, access requirements and interfaces are accurately modelled and coordinated with the architectural and structural design.
- Review, validate and develop the existing building physics model to a level appropriate for RIBA Stage 3, reflecting the spatially coordinated design and demonstrating performance against the agreed environmental requirements, energy and carbon targets, plant loads and future climate scenarios.
- Planning application preparation and submission.
- Cost planning and value management exercises.
- Development of a robust whole-life cost and carbon assessment.
- Stakeholder engagement and workshop facilitation.
- Support Historic England’s fundraising activities for the project by providing reasonable information, evidence, and documentation to assist fundraising and grant applications where requested.
- How the procedure runs: Stage 1 - Using Procurement Specific Questionnaire (Conditions of participation) to reduce the number of suppliers to be invited to submit final tenders. If supplier passes all Stage 1 questions, then they will be invited to participate to Stage 2. Stage 2 - Invitation To Tender (ITT) - Quality and Pricing evaluation questions.
CPV: Architectural and related services · Architectural design services · Architectural, engineering and planning services · Engineering design services · Environmental engineering consultancy services · Environmental improvement works · Project and design preparation, estimation of costs
The lotProcurement structure
single lot · value publishedLot #1RenewalPublished value£149,000
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published sub-criteria (2)
- Quality: 70%
- Pricing: 30%
Published award criteria (2)
- Pricing: RIBA Stage 3 fixed price schedule RIBA Stage 3 Rate table RIBA Stage 4 Rate table
- Quality: Quality 1 - Understanding of Project Objectives and Option Review Approach Quality 2 - Methodology for Option Validation, Design Development and Technical Delivery Quality 3 - Understanding of Archive Collection Requirements Quality 4 - Archive Collections and Environmental Risk Management Quality 5 - Relevant Experience and Lessons Learned Quality 6 - Cost Management and Buildability Quality 7 - Project Team and Resource Commitment Social Value 1 - Environmental stewardship, skills and wider benefit
No conditions of participation were published on the notice; check the tender documents.
- Price carries 30 of 100 points: a 10% discount moves about 3 points. The method statement decides this lot, not the discount.
- Turnover usually expected at this size: about £298,000 (twice the annual value).
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula. Turnover is an indicative market norm (≈2× annual value), not a published condition.
Competition analysis · published record, not a forecast of who will bid
How Historic England buys Consultative engineering and construction services (CPV 7131), and who usually turns up
Historic England’s published record next to the market for the same work. Frameworks and DPS are left out: they draw different bid counts. Whole-market view: Consultative engineering and construction services (CPV 7131) →
How the contest usually goes
Winner shares use published awards; bid and price charts use contested lots.
i
How often small and medium firms win.
Share of awards where the winner’s size is known.
The counts under this question show how many awards have a known supplier size.
Small firms have won here. Neither number says whether you qualify; it describes who has been winning.
i
How often local firms win similar work.
Winners with a registered address in the delivery region, out of awards with a known address.
Local means the winner is registered in the region where that award was delivered. The market figure counts awards delivered in South West England (authority’s region).
A local branch does not count if the registered address is elsewhere.
Most of this buyer’s recorded winners were registered in the region where that award was delivered.
i
How long buyers here take to decide after bids close.
Middle value in days from the bid deadline to the award date, on competitions that published both.
Only decided tenders count, so slow ones still waiting are not in.
Half of these awards have an award date within 54 days of the bid deadline.
i
How often work is awarded with no recorded rival.
Direct awards and tenders where every published lot count shows one bid.
Both shares are minimums: some awards have no bid count.
Thin markets produce this too; it is not proof of a tailored specification.
Direct awards or one recorded bid are common here. Check the route before spending time on a bid.
How many bids did past lots attract?
i
How many bids past lots received.
Each colour is a bid-count range. Only competed lots with a published count are included.
Past bids do not predict this tender.
1 bid31% / 21%
2–315% / 6%
4–615% / 29%
7+38% / 44%
How did awards compare with estimates?
i
Where winning prices landed against estimates.
Each colour shows awards below, close to or above the published estimate, one lot at a time.
Past prices are a guide, not a bid price.
Below estimate37% / 38%
Within ±2%53% / 44%
Above estimate9% / 18%
Assess each lot i
What past awards tell you about each lot.
See the forecast, this buyer’s earlier suppliers and firms with relevant wins.
No supplier is confirmed as a bidder.
i
What past awards tell you about each lot.
See the forecast, this buyer’s earlier suppliers and firms with relevant wins.
No supplier is confirmed as a bidder.
Open a lot for its forecast, this buyer’s previous supplier and possible competitors, from published award history, not a bid list
Lot #1CPV 4526Published estimate£149k
This lot is listed as CPV 4526. The table above uses the notice category.
i
How many bids this lot may attract.
The forecast uses similar past competitions. The bar shows either that forecast or past bid counts; the line below says which.
Each lot shows its own forecast based on its own category; forecasts for different lots of the same notice are not comparative.
A forecast, not a list of bidders.
1 bid23%
2–322%
4–630%
7+25%
i
Where the award price may land.
The forecast uses similar awards and the buyer’s estimate. The band covers the middle half of likely prices.
Based on 24 comparable awards. Each lot reflects its own category; forecasts for different lots of the same notice are not comparative.
A statistical guide from past awards, not a price to bid.
Middle 50%£124k–£149k
Estimate£149k
Who has supplied this buyer on similar work? i
Who has done similar work for this buyer.
Past contracts are matched by buyer, title and type of work.
A past supplier may not bid again.
i
Who has done similar work for this buyer.
Past contracts are matched by buyer, title and type of work.
A past supplier may not bid again.
| Supplier | This buyer’s earlier contract | Lot | Award value | Why listed |
|---|---|---|---|---|
| Milton Keynes Surveys LtdLive contract | ITT - Swindon Archive Decarbonisation - Measured Building Survey (UID 312)runs to Oct 2026 | — | £13k | Matched as the earlier contract |
| ArchitypeWorked for this buyer | Archive Decarbonisation Surveys and Reports (NP 368)notice published Oct 2025 | — | — | Similar wording and category |
| NDM Health LtdWorked for this buyer | RFQ - Technical retrofit training for architects, surveyors, and SPAB helpline (UID 146)notice published Jan 2026 | — | — | Similar wording and category |
Who could compete for this lot? i
Who could compete for this lot?
Firms with relevant past wins. On a framework, we show firms on that agreement.
None is confirmed as a bidder.
i
Who could compete for this lot?
Firms with relevant past wins. On a framework, we show firms on that agreement.
None is confirmed as a bidder.
| Supplier | Won in this category | Live contracts | Award vs estimate |
|---|---|---|---|
| £13k1 award in 36m · last 2 months ago | 1 live · £13k iPublic contracts this supplier still holds. Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book. Unexpired says nothing about spare capacity. | no comparable pairs | |
| £70k1 award in 36m · last 12 months ago | None on file | 26% below n=1 | |
| £60m134 awards in 36m · last this month | 33 live · £19m iPublic contracts this supplier still holds. Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book. Unexpired says nothing about spare capacity. | at estimate n=27 | |
| £20m86 awards in 36m · last this month | 20 live · £6.5m iPublic contracts this supplier still holds. Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book. Unexpired says nothing about spare capacity. | 3% below n=2 | |
| £7.8m14 awards in 36m · last this month | 10 live · £8.5m iPublic contracts this supplier still holds. Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book. Unexpired says nothing about spare capacity. | 9% above n=5 |
About this data
- Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
- Two views, kept apart. The authority’s own track record and the wider market for the same kind of work sit side by side and are never mixed. Where the local picture is too thin, a figure widens to a broader market and says which one it used.
- Forecasts are labelled. The price forecast and its range, possible competitors and the earlier-work matches are our estimates from past awards: not published facts, not win chances and not price advice. Official notices do not say who is bidding.
- Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.
What this replaces i
Who has done similar work for this buyer.
Past contracts are matched by buyer, title and type of work.
51% title match.
A past supplier may not bid again.
i
Who has done similar work for this buyer.
Past contracts are matched by buyer, title and type of work.
51% title match.
A past supplier may not bid again.
The prior contract this notice most likely re-tenders · matched by title and category (51% title match), the holder is not guaranteed to re-bid
ITT - Swindon Archive Decarbonisation - Measured Building Survey (UID 312) — held by Milton Keynes Surveys Ltd; the published contract ends 31 Oct 2026.
Procedure terms & legal framework
From the official record- Procedure method
- Competitive flexible procedure
- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Procurement category
- Services
- Notice status
- Requests to participate open
- Procurement threshold
- Above threshold (FTS publication)
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 9 Oct 2026, 18:33 BST
- Last source update
- 9 Oct 2026, 18:33 BST
- Award evaluation window
- Submission end – 12 Jan 2027
- Authority reference
P/REF 00000632- FTS notice number
2026/S 000-095864- Latest notice
- Tender notice (UK4)
- Classification (CPV)
- Delivery area
- Not published
- Official registry OCID
ocds-h6vhtk-078534Find a Tender
- How it runs
Stage 1 - Using Procurement Specific Questionnaire (Conditions of participation) to reduce the number of suppliers to be invited to submit final tenders. If supplier passes all Stage 1 questions, then they will be invited to participate to Stage 2.
Stage 2 - Invitation To Tender (ITT) - Quality and Pricing evaluation questions.
How to participate & submission route
Official notice Submit via In-tend- Requests to participate (first stage)
- 4 Nov 2026, 09:30 GMT
- Tender submission deadline
- 4 Nov 2026, 09:30 GMT
- Clarification deadline
- 28 Oct 2026, 17:00 GMT
- Submission channel
- Official e-sourcing portal
- Electronic submission
- Allowed
- Accepted languages
- en
Please find further details of the project and submit any questions / submit your response to the procurement specific questionnaire (conditions of participation) via our free procurement portal : supplier.in-tend.co.uk/historicengland/home ↗
Please be aware at this Stage 1 (procurement specific questionnaire (conditions of participation)), we do not require a Tender returned. Only the stage 1 document.
Timeline
9 Oct 2026 → 28 Jan 2027 · 5 dates- Tender notice published18 days ago9 Oct 2026, 18:33 BST
- Today27 Oct 2026
- Clarification questions byin 21h28 Oct 2026, 17:00 GMT
- Submission deadlinein 7 days4 Nov 2026, 09:30 GMT
- Award decision expected byin 77 days12 Jan 2027, 23:59 GMT
- Contract startsin 92 days28 Jan 2027
Notice history
1 event · 1 release on Find a Tender- Tender notice published9 Oct 2026, 18:33 BSTUK4
Commercial outcome & contract awards
Nothing awarded yet- Awards (0)
- No award published
- Contracts (0)
- No contract published
- Bid statistics
- No aggregate bid statistics published
Contracting authority & participating public bodies
Official documents & specifications (1)
Official links; attachments are not copiedNotices published for this procedure
- Tender notice Tender notice on Find a Tender