Find a TenderAwardedContract award notice
Published 3 Oct 2025, 15:00 BST

Official UK procurement notice

Main Contractors Framework 2026

Official notice

Authority: London School of Hygiene & Tropical Medicine (Education)

Framework agreement2 lotsWorksCompetitive flexible procedureAbove thresholdSME suitableMax 1 lot to bidMax 1 lot per supplier
Framework ceiling (notional)£63,000,000total for 2 lots · framework ceiling, not attributable revenue
Submissions closed 27 Feb 2026awarded 6 May 2026
Award (standstill) to 8build Ltd +7 more2 awards
Framework period 5 yrsends 1 May 2031 · up to 1 May 2033 with extensions · starts 1 May 2026

What is being bought2 lots · detail below

Published requirement description

LSHTM Framework for Main Contractors, to procure works across all campuses of its estate, broken out into the following Lots: Lot 1 – Main Contractor - Carry out construction projects, either as traditional single stage or design and build. Lot 2 – Mechanical, Electrical and Public Health (MEP) Contractor – Predominantly in relation to either large plant replacement, or large scale replacement of for instance light fittings, or distribution pipework but may also cover simple external and internal refurbishment works. With an estimated total value of LSHTM capital projects over the life of the Framework of between £15,000,000 and £63,000,000 GBP based on up to £60,000,000 for lot 1 and up to £3,000,000 for lot 2. These figures cannot in any circumstances be guaranteed and nor should they be taken as a minimum or maximum amount. Typical call-off contract values range from £250,000 - £10,000,000 for lot 1, and £10,000 to £150,000 for lot 2. Please note that refurbishment work in the laboratories is of a highly technical nature, requiring extensive relevant skills and experience. In addition, the refurbishment works generally take place in occupied buildings with other research activities ongoing nearby, requiring careful planning and execution of the works so that no research is interrupted. Due to the criticality of these research activities an ability to react and resource promptly to address technical issues that threaten research continuity is required.

  • How the procedure runs: Two stages. Initial Conditions of Participation (CoP) stage followed by an Invitation to Tender (ITT) stage. All requests to participate received through the completed PSQ will be evaluated as detailed within the documents on both a pass / fail and scored criterion. Only those that fully meet the conditions of participation and score within the top places for each lot will proceed to the final Invitation to Tender stage. Please note that requests to participate must be through the Mercell portal and be submitted by the 31st October 2026 (13:00).
  • No preliminary market engagement: No preliminary market engagement has been carried out by LSHTM as not required.

CPV: Building completion work · Building construction work · Building installation work · Construction work · Construction work for buildings relating to education and research · Electrical installation work · Installation services of electrical and mechanical equipment · Mechanical installations · Overhaul and refurbishment work · Repair and maintenance services of electrical and mechanical building installations · Site preparation work · Works for complete or part construction and civil engineering work

How this framework works

From the published notice
Type
Closed framework
Call-offs
call-offs may be awarded directly or by further competition
Places
up to 8 suppliers · 5 bids on the busiest of 2 lots (0.6 per place) · 8 appointed (full)
Framework period
5 yrs · up to 7 yrs from 1 May 2026
Published description of the framework

Prices to be agreed as part of framework. Work will be assigned either through direct award or through mini competition as described in the procumment documents.

Lots and requirements (2)Procurement structure

2 lots · all with a published value · a supplier may bid for at most 1 and win at most 1 of them · same conditions of participation on every lot · same evaluation weights on every lot
Lot #1Main ContractorsAwardedRenewal 5 yrsPublished valueGIP 60,000,000

The source published no individual description for this lot.

Contract period: 1 May 2026 – 1 May 2031 (5 yrs) · up to 1 May 2033 with extensionsValue: GIP 60,000,000 exc. VAT · GIP 72,000,000 inc. VAT
Delivery: London
Extensions: The initial term will be 5 years with the option to extend for a further two years. A longer term framework is required due to the scale of the projects that will be called off from the framework, the time to deliver each scheme and the relatively low frequency of the schemes/competitions. The extended duration will enable the delivery of the School’s capital programme, and the opportunity to develop the collaborative relationships that the School desires.
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    Selection criteria as stated in the procurement documents

  • Technical & professional ability

    Selection criteria as stated in the procurement documents

Lot #2MEP ContractorAwardedRenewal 5 yrsPublished value£3,000,000

The source published no individual description for this lot.

Contract period: 1 May 2026 – 1 May 2031 (5 yrs) · up to 1 May 2033 with extensionsValue: £3,000,000 exc. VAT · £3,600,000 inc. VAT
Delivery: London
Extensions: The initial term will be 5 years with the option to extend for a further two years. A longer term framework is required due to the scale of the projects that will be called off from the framework, the time to deliver each scheme and the relatively low frequency of the schemes/competitions. The extended duration will enable the delivery of the School’s capital programme, and the opportunity to develop the collaborative relationships that the School desires.
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    Selection criteria as stated in the procurement documents

  • Technical & professional ability

    Selection criteria as stated in the procurement documents

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored · same split on all 2 lots
Quality: 60%Price: 40%
Published sub-criteria (2)
  • Technical: 60%
  • Cost: 40%
Published award criteria (2)
  • Technical: Award criteria may be refined upto the Invitation to Tender stage. A draft evaluation criteria has been provided within documentation.
  • Cost: Award criteria may be refined upto the Invitation to Tender stage. A draft evaluation criteria has been provided within documentation.
Conditions of participation · identical on every lot2
  • Economic & financial standing

    Selection criteria as stated in the procurement documents

  • Technical & professional ability

    Selection criteria as stated in the procurement documents

What this means for your bid
  • Price carries 40 of 100 points: a 10% discount moves about 4 points. The method statement decides this lot, not the discount.
  • “Main Contractors Framework 2026” is a framework: the contest is a place on its panel, up to 8 suppliers, not a single contract: call-offs may be direct or by further competition.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Competitive flexible procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Works
Notice status
Awarded
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
Unspecified in notice
First published
3 Oct 2025, 15:00 BST
Last source update
8 May 2026, 16:01 BST
Award evaluation window
Submission end – 1 Apr 2026
Authority reference
LSHTM-2025-024
FTS notice number
2025/S 000-062218
Latest notice
Contract award notice (UK6)
Classification (CPV)
Building completion workBuilding construction workBuilding installation workConstruction workConstruction work for buildings relating to education and researchElectrical installation workInstallation services of electrical and mechanical equipmentMechanical installationsOverhaul and refurbishment workRepair and maintenance services of electrical and mechanical building installations
+2 moreSite preparation workWorks for complete or part construction and civil engineering work
Delivery area
London (UKI31)
Official registry OCID
ocds-h6vhtk-05a813 Find a Tender
How it runs

Two stages. Initial Conditions of Participation (CoP) stage followed by an Invitation to Tender (ITT) stage. All requests to participate received through the completed PSQ will be evaluated as detailed within the documents on both a pass / fail and scored criterion. Only those that fully meet the conditions of participation and score within the top places for each lot will proceed to the final Invitation to Tender stage. Please note that requests to participate must be through the Mercell portal and be submitted by the 31st October 2026 (13:00).

How it was run

Official notice
Run through: EU-Supply (CTM) · Who buys & how to bid on EU-Supply
Public notice page · account needed to bidElectronic submission allowedLanguage: EN
Access & registration note: Free · 5–10 minutes
Appointment period ends
27 Feb 2026, 13:00 GMT
Clarification deadline
17 Oct 2025, 13:00 BST
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

Timeline

3 Oct 2025 → 19 May 2026 · 8 dates
  1. Tender notice published388 days ago
    3 Oct 2025, 15:00 BST
  2. Clarification questions by374 days ago
    17 Oct 2025, 13:00 BST
  3. Admission / appointment period ends241 days ago · period end, not a bid countdown
    27 Feb 2026, 13:00 GMT
  4. Award decision expected by209 days ago
    1 Apr 2026, 00:59 BST
  5. Contract starts179 days ago
    1 May 2026
  6. Assessment summaries sent172 days ago
    8 May 2026
  7. Latest notice published171 days ago
    8 May 2026, 16:01 BST
  8. Standstill ends160 days ago
    19 May 2026, 23:59 BST

Notice history

4 events · 2 releases on Find a Tender · since 3 Oct 2025
  1. Tender notice published
    3 Oct 2025, 15:00 BST
    UK4
  2. Contract award notice published
    8 May 2026, 16:01 BST
    UK6
  3. Status changed to complete
    8 May 2026, 16:01 BST
  4. Contract signature expected
    29 May 2026, 23:59 BST
    scheduled

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 82 awards · see the list ↓
Bids received 54 from SMEs · busiest of 2 lots
Named bidders 8published on the award notice
Awarded toValueDateStatus
Lot 1 · Main Contractors1 award
8build LtdSME, Estilo Interiors LimitedSME, Russell CawberrySME, T&B Contractors Limited, Vinci Facilities1 Jun 2026 – 31 May 2031 · up to 31 May 2033Extensions: The initial term will be 5 years with the option to extend for a further two years. A longer term framework is required due to the scale of the projects that will be called off from the framework, the time to deliver each scheme and the relatively low frequency of the schemes/competitions. The extended duration will enable the delivery of the School's capital programme, and the opportunity to develop the collaborative relationships that the School desires.£60,000,0006 May 2026standstill to 19 May 2026Standstill
Lot 2 · MEP Contractor1 award
Alpine Works LimitedSME, Aston GroupSME, Shield Mechanical, Electrical and Facilities Services LtdSME1 Jun 2026 – 31 May 2031 · up to 31 May 2033Extensions: The initial term will be 5 years with the option to extend for a further two years. A longer term framework is required due to the scale of the projects that will be called off from the framework, the time to deliver each scheme and the relatively low frequency of the schemes/competitions. The extended duration will enable the delivery of the School's capital programme, and the opportunity to develop the collaborative relationships that the School desires.£3,000,0006 May 2026standstill to 19 May 2026Standstill

Bid statistics published by the authority

LotBidsSMEVCSEValid bid range
1 · Main Contractors5final-stage tenders · 7 at stage one40—
2 · MEP Contractor3final-stage tenders30—

Who bid

Bidders as named on the Procurement Act 2023 award notice. “Won” means the bidder holds an award on this notice.

Contracting authority & participating public bodies

London School of Hygiene & Tropical Medicine

Contracting authorityPublic authority - sub-central government GB-PPON: PHBN-2917-QXQQ Keppel Street,, London, London, WC1E 7HTContact name, email, phone

Framework contractors & participating bidders

8 commercial parties on the notice
  • 8Build LimitedFramework contractorGB-PPON: PYPG-4328-LYQM 64 Leman Street, London, London, E1 8EUContact email
  • Alpine Works LimitedFramework contractorGB-PPON: PTXJ-5643-NXPY 64 Baker Street, London, London, W1U 7GBContact email
  • Aston Heating LtdFramework contractorGB-PPON: PJYY-1241-CYXH Moss Lane, Romford, London, RM1 2PTContact email
  • Estilo Interiors LimitedFramework contractorGB-PPON: PPDM-8141-WQCM Ludgate Court Water Street, Birmingham, West Midlands, B3 1EPContact email
  • Russell Cawberry LimitedFramework contractorGB-PPON: PVLQ-7286-CPHX 31 The Broadway, Cheam, London, SM3 8BLContact email
  • SHIELD MECHANICAL ELECTRICAL & FACILITIES SERVICES LTDFramework contractorGB-PPON: PJHN-7886-HQLJ Shield Home, 135 Hanham High Street, Hanham, Bristol, South West, BS15 3QYContact email
  • T & B (CONTRACTORS) LIMITEDFramework contractorGB-PPON: PYND-4632-DXGD Riverside House 1 Place Farm, St. Albans, East of England, AL4 8SBContact email
  • VINCI FACILITIES LIMITEDFramework contractorGB-PPON: PYCB-3475-QWVQ Stuart House, Manor Way, Rainham, London, RM13 8RHContact email

Official documents & specifications (3)

Official links; attachments are not copied

Notices published for this procedure

  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender