Find a TenderAwarded without competition
Published 7 Jun 2021, 22:41 BST

Official UK procurement notice

Provision Of Replacement Terminal Operating System - Portsmouth International Port

Official notice

Authority: Portsmouth City Council (Local council)

GoodsAward procedure without prior publication of a call for competition
Awarded value£388,000published contract · exc. VAT
Awarded 6 May 2021no call for competition
Awarded to COPAS BV

What is being bought

Published requirement description

Portsmouth City Council (the 'Council') has awarded a contract to COPAS B.V. (the 'Supplier') to supply and maintain a replacement Terminal Operating System (TOS) for use at Portsmouth International Port.

The new terminal operating system (TOS) is required in order to ensure compliance with UK Government additional Border Control Measures that are required to be in place by 1st July 2021 and also to service a multi-purpose facility including Roll on Roll Off (RoRo) freight haulage serving both the European Union and 'Rest of the World' trade routes, currently the Channel Islands.

The Council awarded the contract on 6th May 2021, with commencement of implementation effective immediately. The contract will run for an initial term of 3 years extendable thereafter on a yearly rolling basis without limits to number of extensions granted and associated contract duration.

Th value of the contract for the 1st year for all acquisition and implementation costs is £268k plus £40k for servicing / maintenance costs making a total 1st year cost of £308k. The ongoing annual servicing / maintenance costs for subsequent years is £40k which equates to a total inclusive 3 year cost of £388k. If further extensions are taken up on a rolling basis this will increase the total cumulative cost of the contract accordingly.

CPV: Compliance software package · Database and operating software package · Enterprise resource planning software package · Facilities management software package and software package suite · Financial analysis and accounting software package · Industry specific software package · Inventory management software package · Software programming and consultancy services · Statistical software package

The lotProcurement structure

single lot · no lot value published
Lot #1During the course of 2020 the UK Government announced additional Border Control…Awarded

During the course of 2020 the UK Government announced additional Border Control Measures that would be required by UK ports from 2021, referred to as the 'Border Operating Model' (BOM).

The BOM, placed requirements on ports and terminals to adapt their operating models, infrastructure and systems so that they can comply with the new requirements that will apply post 2300hrs 31st December 2020, once the BREXIT transition period has concluded.

HM Revenue & Customs (HMRC) have instructed UK Ports that the new systems and solutions must be fully in place by the 1st July 2021.

The new operating system is needed to meet the requirements of the UK Governments new Border Operating Model (BOM), which are to be in place by 1st July 2021.

These requirements must include, but are not be limited to:

  • Electronic interfacing with the Customs Inventory systems (Inventory Linking) to ensure compliance required to obtain a Port Temporary Storage approval from the Customs National Frontiers Unit (NFAU).
  • Electronic messaging and data transfer for operating the new customs Goods Vehicle Movement Service (GVMS).
  • Ability to ensure goods that are subject to Customs procedure are not released to the public domain whilst not cleared from a customs process.
  • Integrations with ferry company manifests and booking systems.

The system will be the primary software used for record keeping, planning, control and monitoring for the management of freight units throughout the port estate from the point of arriving at the port either by road or vessel, until the freight unit leaves again either by road or vessel.

To comply with the BOM requirements, the Port is establishing a Border Control Post (BCP). The BCP will be operated on behalf of the Port by a separate provider Portico (BCP Service Provider) under contract. Portico operate a deep water cargo terminal which neighbours the Port and are uniquely placed to offer the required services on an operationally effective and economical basis.

The solution will must integrate seamlessly to the BCP service provider's software system which can only really be achieved effectively via both parties using the same system especially within the timeframe for system implementation and launch which has been placed upon the Port by UK Government.

The BCP service provider currently uses the COPAS system provided by the Supplier and has no intention of reviewing these arrangements at present, hence the Port's decision to enter into contract via direct award to the Supplier to ensure system compatibility.

It should also be noted that even if Portico were not the appointed BCP service provider the Port would still need to ensure system compatibility with Portico which can only be effectively achieved via purchase of the COPAS system due to:

  • As mandated by the Department for Environment, Food and Rural Affairs (DEFRA) and the Animal & Plant Health Agency (APHA) any unit being requested to transfer from the Port to the BCP for an inspection must have a full audit trail of the journey from leaving the Port to arriving and then leaving the BCP Facility. This is to ensure that any contaminated consignment does not make its way into the normal food chain. All units whether accompanied or unaccompanied will have to travel across the Portico site to attend the BCP facility and therefore will have to be shown within Portico's own system which is the COPAS system, otherwise a gap in the audit trail will occur and effective tracking of the unit is significantly compromised.
  • Units will also need to be logged onto the Portico system for security purposes as Portico's site is covered by ISPS (International Ship and Port Facility Security Code). As well as for health and safety reasons.
  • Portico hold a 30 year lease of the land in question and the Port and wider Council has no ability to force Portico to change their current operating systems, therefore any system the Port uses must seamlessly integrate with Portico's systems.
  • To retain the Port's current trade levels, the Port requires 'Temporary Storage Approval' to allow existing channel island traffic to continue. To gain Temporary Storage Approval the Port requires Inventory Linking. To allow unaccompanied units arriving from the EU to pass through a Temporary Storage area inventory linking is also required. To be inventory linked our systems need to integrate with a community service provider (CSP).
  • The current CSP used by Condor (a key Port customer) and Portico is CNS. Therefore the Port's systems need to link to CNS. The COPAS system already includes for integration to CNS. Changing to a different CSP would cause cost and inconvenience to Portcio and Condor who would be under no legally binding obligation to facilitate the required integration.

The introduction of the COPAS system will help to safeguard the Port's existing and future freight income streams, which currently amount to approximately £3.9 million per annum. Without this passenger and tonnage income may also be put at risk. If freight were not carried some routes may become uneconomic for operators and therefore cease.

Delivery: South East · Portsmouth International Port, George Byng Way, Portsmouth, PO2 8SP
Extensions: The contract is of a rolling nature, extendable in annual increments to be agreed without limit to number of increments or duration. In accordance with Regulation 17(b) of Public Contract Regulations (2015), the total term of the contract in terms of totality of extension options cannot be defined as the Council cannot forecast how long it will require the system for on an ongoing basis. Any end to the extension of the contract via annual rolling increments will also be constrained due to the need for seamless system compatibility with Portico who would be under no legal obligation to the Council to pursue alternative system options. The need for system compatibility is due to the operational implications of Portico's land interests within the Port and their appointment as the BCP service provider. If Portico do not choose to pursue alternative systems then the Council may have no option than to continue extending the contract on a rolling basis.

Procedure terms & legal framework

From the official record
Procedure method
Award procedure without prior publication of a call for competition
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Goods
Notice status
Awarded without competition
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Direct award (no call for competition)
GPA / WTO covered
Yes (GPA)
Recurring procurement
Unspecified in notice
First published
7 Jun 2021, 22:41 BST
Last source update
7 Jun 2021, 22:41 BST
FTS notice number
2021/S 000-012731
Classification (CPV)
Compliance software packageDatabase and operating software packageEnterprise resource planning software packageFacilities management software package and software package suiteFinancial analysis and accounting software packageIndustry specific software packageInventory management software packageSoftware programming and consultancy servicesStatistical software package
Delivery area
South East (UKJ31)
Official registry OCID
ocds-h6vhtk-02b92c Find a Tender
Why no open competition

The works, supplies or services can be provided only by a particular economic operator due to absence of competition for technical reasons

Published justification

During the course of 2020 the UK Government announced additional Border Control Measures that would be required by UK ports from 2021, referred to as the 'Border Operating Model' (BOM).

The BOM, placed requirements on ports and terminals to adapt their operating models, infrastructure and systems so that they can comply with the new requirements that will apply post 2300hrs 31st December 2020, once the BREXIT transition period has concluded.

HM Revenue & Customs (HMRC) have instructed UK Ports that the new systems and solutions must be fully in place by the 1st July 2021.

The new operating system provided by the Supplier is needed to meet the requirements of the UK Governments new Border Operating Model (BOM), which are to be in place by 1st July 2021.

To comply with the BOM requirements, the Port is establishing a Border Control Post (BCP). The BCP will be operated on behalf of the Port by a separate provider Portico (BCP Service Provider) under contract.

The solution will must integrate seamlessly to the BCP service provider's software system which can only really be achieved effectively via both parties using the same system especially within the timeframe for system implementation and launch which has been placed upon the Port by UK Government.

The BCP service provider currently uses the COPAS system provided by the Supplier and has no intention of reviewing these arrangements at present, hence the Port's decision to enter into contract via direct award to the Supplier to ensure system compatibility.

It should also be noted that even if Portico were not the appointed BCP service provider the Port would still need to ensure system compatibility with Portico which can only be effectively achieved via purchase of the COPAS system due to:

  • As mandated by the Department for Environment, Food and Rural Affairs (DEFRA) and the Animal & Plant Health Agency (APHA) any unit being requested to transfer from the Port to the BCP for an inspection must have a full audit trail of the journey from leaving the Port to arriving and then leaving the BCP Facility. This is to ensure that any contaminated consignment does not make its way into the normal food chain. All units whether accompanied or unaccompanied will have to travel across the Portico site to attend the BCP facility and therefore will have to be shown within Portico's own system which is the COPAS system, otherwise a gap in the audit trail will occur and effective tracking of the unit is significantly compromised.
  • Units will also need to be logged onto the Portico system for security purposes as Portico's site is covered by ISPS (International Ship and Port Facility Security Code). As well as for health and safety reasons.
  • Portico hold a 30 year lease of the land in question and the Port and wider Council has no ability to force Portico to change their current operating systems, therefore any system the Port uses must seamlessly integrate with Portico's systems.
  • To retain the Port's current trade levels, the Port requires 'Temporary Storage Approval' to allow existing channel island traffic to continue. To gain Temporary Storage Approval the Port requires Inventory Linking. To allow unaccompanied units arriving from the EU to pass through a Temporary Storage area inventory linking is also required. To be inventory linked our systems need to integrate with a community service provider (CSP).
  • The current CSP used by Condor (a key Port customer) and Portico is CNS. Therefore the Port's systems need to link to CNS. The COPAS system already includes for integration to CNS. Changing to a different CSP would cause cost and inconvenience to Portcio and Condor who would be under no legally binding obligation to facilitate the required integration.

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awards 1
Awarded value £388,0001 contract exc. VAT
Bids received 1
Contracts signed 1latest 6 May 2021
Awarded toValueDateStatus
COPAS BV£388,000 †—Awarded

Contracts

  • Contract 012731-2021-1 · COPAS BV

    Signed
    6 May 2021
    Value
    £388,000
    Status
    active

Bid statistics published by the authority

BidsSMEVCSEValid bid range
1bids · 0 electronic0——

Contracting authority & participating public bodies

PORTSMOUTH CITY COUNCIL

Contracting authorityLocal CouncilRegional or local authorityGeneral public services City Council, Portsmouth, South East, PO12BGContact name, email, phone

Dispute resolution & review bodies

  • The High CourtReview body LondonContact phone

Bidders & participating suppliers

1 commercial party on the notice
  • COPAS BVAwarded supplier Stockholm 39, 2993 L M Barendrecht, Barendrecht, NL4Contact email

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.