Find a TenderCancelledProcurement termination notice
Published 5 Jan 2026, 11:58 GMT

Official UK procurement notice

Street Lighting Improvements Programme 2026 - 2030

Official notice

Authority: Sandwell Metropolitan Borough Council (Local council)

Open framework schemeWorksOpen procedureAbove threshold
Framework ceiling (notional)£4,500,000framework ceiling, not attributable revenue
Submissions closed 4 Feb 2026
Framework period 4 yrsends 31 Mar 2030 · starts 1 Apr 2026

What is being bought

Published requirement description

Sandwell Metropolitan Borough Council Highway Authority has a legal duty to maintain the highway network within the borough, including street lighting and illuminated signage. Sandwell MBC provides and maintains 30,985 streetlights and approximately 5,000 other types of illuminated street furniture. Of these, 30,139 lighting units have already been upgraded through a previous lantern replacement programme. This delivered significant energy efficiencies, carbon reductions and introduced LED lighting technology controlled via a Central Management System (CMS), a platform that enables remote monitoring and adjustment of street lighting assets for optimal performance and fault detection. The proposed Street Lighting Improvement Programme Contract, will focus on upgrading the small number of remaining non-LED lighting units and converting approximately 9,000 existing LED lanterns onto a single, integrated CMS. Additionally, the contract will enable the replacement of lighting columns and other illuminated street furniture that have reached the end of their design life, ensuring that the infrastructure remains safe and fit for purpose.

  • The authority expects to re-tender this requirement around 2 Mar 2026, 23:59 GMT.

CPV: Installation of road lighting equipment · Installation of street furniture · Installation work of illumination and signalling systems · Street-lighting maintenance services

How this framework works

From the published notice
Type
Closed framework · open framework scheme (admission reopens)
Call-offs
every call-off is a further competition among the appointed suppliers
Places
up to 2 suppliers · 2 bids received (1.0 per place) · 2 appointed (full)
Framework period
4 yrs from 1 Apr 2026
Scheme runs until
1 Apr 2030
Supplier levy on call-offs (max %)
Not applicable
Published description of the framework

The two (2) Tenderers achieving the highest total scores will be appointed to the contract. The contract will be awarded to the highest-scoring bidder, who will be designated as the Primary Contractor. The Primary Contractor will be offered all work opportunities in the first instance. A Secondary Contractor will also be appointed to provide back up support in circumstances where the Primary Contractor is either unable to deliver the required services at any particular time or is lacking the capacity to undertake the work to meet any particular delivery timeframes

The lotProcurement structure

single lot · value published
Lot #1Awarded 4 yrsPublished value£4,500,000

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored
  • Simple description: Please refer to criteria in ITT documents
What this means for your bid
  • “Street Lighting Improvements Programme 2026 - 2030” is a framework: the contest is a place on its panel, up to 2 suppliers, not a single contract: each call-off is a further competition, so the pricing contest starts after appointment.

Procedure terms & legal framework

From the official record
Procedure method
Open procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Works
Notice status
Cancelled
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Standard
Commercial structure
Open framework scheme
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Yes · next expected 2 Mar 2026
First published
5 Jan 2026, 11:58 GMT
Last source update
1 Apr 2026, 10:45 BST
Award evaluation window
Submission end – 16 Mar 2026
Authority reference
SMBC 25057
FTS notice number
2026/S 000-000245
Latest notice
Procurement termination notice (UK12)
Classification (CPV)
Installation of road lighting equipmentInstallation of street furnitureInstallation work of illumination and signalling systemsStreet-lighting maintenance services
Delivery area
West Midlands (UKG37)
Official registry OCID
ocds-h6vhtk-05ff31 Find a Tender

How it was run

Official notice
Run through: In-tend · Who buys & how to bid on In-tend
Supplier login requiredElectronic submission allowedLanguage: EN
Access & registration note: Free · one account per buying organisation's portal · reCAPTCHA on signup
Appointment period ends
4 Feb 2026, 15:00 GMT
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Supplier levy on call-offs (max %)
call-off levy · Not applicable
Detailed submission instructions & authority contactsFrom official release

Timeline

5 Jan 2026 → 1 Apr 2026 · 7 dates
  1. Tender notice published295 days ago
    5 Jan 2026, 11:58 GMT
  2. Admission / appointment period ends264 days ago · period end, not a bid countdown
    4 Feb 2026, 15:00 GMT
  3. Assessment summaries sent232 days ago
    9 Mar 2026
  4. Award decision expected by224 days ago
    16 Mar 2026, 23:59 GMT
  5. Standstill ends221 days ago
    19 Mar 2026, 23:59 GMT
  6. Contract starts209 days ago
    1 Apr 2026, 00:00 BST
  7. Latest notice published209 days ago
    1 Apr 2026, 10:45 BST

Notice history

5 events · 3 releases on Find a Tender · since 5 Jan 2026
  1. Tender notice published
    5 Jan 2026, 11:58 GMT
    UK4
  2. Contract award notice published
    9 Mar 2026, 15:52 GMT
    UK6
  3. Status changed to complete
    9 Mar 2026, 15:52 GMT
  4. Procurement termination notice published
    1 Apr 2026, 10:45 BST
    UK12
  5. Contract signature expected
    1 Apr 2026, 23:59 BST
    scheduled

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 21 award · see the list ↓
Bids received 2
Named bidders 2published on the award notice
Contracts signed 1
Awarded toValueDateStatus
Altitude Services LimitedSME, J McCann and Co Ltd (a11)1 Apr 2026 – 31 Mar 2030£4,500,0009 Mar 2026Awarded

Contracts

Bid statistics published by the authority

BidsSMEVCSEValid bid range
2final-stage tenders · 5 at stage one00—

Who bid

Bidders as named on the Procurement Act 2023 award notice. “Won” means the bidder holds an award on this notice.

Contracting authority & participating public bodies

Sandwell Metropolitan Borough Council

Contracting authorityPublic authority - sub-central government GB-PPON: PJHD-8764-YRJJ Sandwell Council House, Freeth Street, Oldbury, West Midlands, B69 3DEContact name, email

Framework contractors & participating bidders

2 commercial parties on the notice
  • Altitude Services LimitedFramework contractorGB-PPON: PVYV-6874-YNTH Unit 10B1 Dean Court Shuttleworth Mead Business Park, Padiham Lancashire, North West, BB12 7NGContact email
  • J McCann & Co LimitedFramework contractorGB-PPON: PCPQ-1853-JWWV Mccann House 110 Nottingham Road, Chilwell Nottinghamshire, East Midlands, NG9 6DQContact email

Official documents & specifications (3)

Official links; attachments are not copied

Notices published for this procedure

  • Procurement termination notice tenderProcurement termination noticeUK12Procurement termination notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender