London Borough of Harrow: Contract Register & Procurement Profile
NHS ODS: LOCAL AUTHORITY·ONS register: Local-authority-district·Social housing register: Local authority·NHS ODS: LOCAL AUTHORITY - LEGACY·Local authority·Greater London·Harrow
Official UK PPONPQRC-2343-GRQR
i
Tenders you can still bid for.
Notices at tender stage whose deadline has not passed, counted the way the search counts them: a notice shows under every code and region it names.
i
Notices published in the last 12 months.
Counted per tender, not per lot, against the 12 months before where shown.
i
How many companies usually bid when this buyer runs a tender.
Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.
Based on 5 lots from this buyer’s competitions, last 24 months.
i
How much of this buyer’s work goes to its three most frequent suppliers.
Share of its awarded tenders that name at least one of the top three. Each tender is counted once.
158 awarded tenders, 185 different suppliers.
Describes the record. It is not a sign of favouritism.
i
Contracts that finish in the next 18 months.
Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.
An end date does not confirm a new procurement.
i
How much this buyer has awarded recently, by published values.
Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.
Published values, not actual spend. The biggest rows are listed so you can check.
What they buyi
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
i
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
Last 24 months · CPV divisions on published procedures · a notice with several divisions counts in each
45 Construction work18 procedures · 10%85 Health and social work services12 procedures · 7%50 Repair and maintenance services10 procedures · 6%79 Business services: law, marketing, consulting7 procedures · 4%34 Transport equipment and products6 procedures · 3%44 Construction structures and materials4 procedures · 2%90 Sewage, refuse, cleaning and environmental4 procedures · 2%31 Electrical machinery3 procedures · 2%How they buyi
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Last 24 months · 180 notices · commercial tool and route as published on the notice, not a legal-regime claim
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Contract94%(169 notices)
169 of 180 notices are Contract (94%).Framework6%(11 notices)
11 of 180 notices are Framework (6%).
i
Which procedures buyers here use.
Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.
Direct award52%(93 notices)
93 of 180 notices are Direct award (52%).Route not published29%(52 notices)
52 of 180 notices are Route not published (29%).Open9%(16 notices)
16 of 180 notices are Open (9%).Limited / restricted8%(14 notices)
14 of 180 notices are Limited / restricted (8%).Selective3%(5 notices)
5 of 180 notices are Selective (3%).
i
How many companies usually bid when this buyer runs a tender.
Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.
Based on 5 lots from this buyer’s competitions, last 24 months.
i
How long this buyer takes to decide after bids close.
Middle value in days from the bid deadline to the award date, on this buyer’s own tenders.
Based on 5 decided tenders across all categories, last 24 months.
i
How often this buyer changes a notice after publishing it.
Middle number of amendments per notice. Deadline extensions and corrections both count.
Based on 181 notices across all categories, last 24 months.
i
Do this buyer’s awards land above or below its own estimates.
Each lot’s published estimate against its award, on this buyer’s competitions, like for like.
Based on 1 lots with both an estimate and an award, last 24 months. Small sample.
A past pattern, not a price to bid.
Who wins herei
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
i
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
All published awards naming a supplier · ranked by distinct procedures, not pounds · panel and call-off entries inflate award records
| Supplier | Procedures | Share | Last 24m | Award records | Last activity |
|---|---|---|---|---|---|
| WATES CONSTRUCTION LIMITED | 4 | 2.5% | 3 | 4 | — |
| London Councils | 3 | 1.9% | 3 | 3 | — |
| Community Connex Limited | 2 | 1.3% | 2 | 4 | 11 Aug 2025 |
| EACH COUNSELLING AND SUPPORT | 2 | 1.3% | 2 | 3 | — |
| KINGDOM SERVICES GROUP LIMITED | 2 | 1.3% | 2 | 2 | 16 Apr 2026 |
| WHIPP CONSTRUCTION LIMITED | 2 | 1.3% | 2 | 2 | — |
| VERITECH SYSTEMS LIMITED | 2 | 1.3% | 2 | 2 | — |
| ARK Consultancy Ltd | 2 | 1.3% | 2 | 2 | — |
The three most frequent suppliers are named on 6% of 158 awarded procedures (each procedure counted once, so a panel shared by several of them is not double-counted); 185 distinct suppliers hold at least one. Descriptive concentration of published awards, not a statement of preference.
i
How much this buyer has awarded recently, by published values.
Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.
Published values, not actual spend. The biggest rows are listed so you can check.
i
The middle published award value for this buyer.
Middle value of the same awards as the total above.
Largest published awards iThe biggest published awards. Awards to a single supplier with a published value, largest first, so you can check the totals against the notice. A repeated framework total can appear here. Open the notice to check. | Supplier | Awarded | Term | Published value |
|---|---|---|---|---|
| 0-19 Health Visiting and School Nursing | Central and North West London NHS Foundation Trust (CNWL) | — | — | £21,579,110 † |
| Children & Young Peoples Substance Misuse | Via Community Ltd | — | — | £8,967,101 † |
| Community Equipment Services | Provide Care Solutions Ltd | 19 Sept 2025 | 2 yrs · up to 3 yrs | £8,700,000 ≈ £4.3m/yr |
| Knights Court Care Home | MMCG (2) Ltd | 11 Aug 2025 | 2 yrs | £1,443,452 ≈ £722k/yr |
| Children & Young Peoples Substance Misuse | Compass - Services to Improve Health and Wellbeing | — | — | £1,011,513 † |
Contracts endingi
Contracts that finish in the next 18 months.
Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.
An end date does not confirm a new procurement.
i
Contracts that finish in the next 18 months.
Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.
An end date does not confirm a new procurement.
172 of 181 contracts carry an end date, 35 estimated from the duration · not a retender forecast
| Contract | Holder | Ends | Published value |
|---|---|---|---|
| Fire Alarms Stag Lane School | FIRETEC SERVICES LIMITED | 28 Oct 2026 | £54,461 |
| Lightning Protection Schools | EUROSAFE COMPLIANCE LIMITED | 30 Oct 2026 | £52,428 |
| Vacant Site Security | VERITECH SYSTEMS LIMITED | 31 Oct 2026 | £174,500 |
| Vacant Commercial Property Security | VERITECH SYSTEMS LIMITED | 31 Oct 2026 | £249,343 |
| North Harrow Station Bridge Cleaning and Refurbishment Works | CC Infrastructure Services | 2 Nov 2026 | £96,164 |
| Pension Administration Support Services | Hymans Robertson | 1 Dec 2026 | £38,000 |
| Mote Mews - Stage 3 Main Works Appointments - Principal Contractor & Brickwork | LEE MARLEY BRICKWORK LIMITED | 11 Dec 2026 | £536,993 |
| Mote Mews - Stage 3 Main Works Appointments - Roofing | ITHACA ROOFING LTD | 11 Dec 2026 | £521,889 |
| Mote Mews - Stage 3 Main Works Appointments - Windows | M.A. SIMMONDS INSTALLATIONS LIMITED | 11 Dec 2026 | £32,258 |
| Specialist Structural Repairs | ICB GENERAL BULDING AND CIVIL ENGINEERING Ltd | 24 Dec 2026 | £99,000 |
Soonest 10 of 59 contracts ending within 18 months.
Recent procedures
Latest 50 of 227 procedures where this authority buys, is the authority the work is for, or runs the procurement
About this data
- Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
- One profile per authority. Different spellings and registration numbers of the same body are merged into this profile. It includes tenders the authority ran for other bodies and tenders run on its behalf; spend is credited to the body that pays.
- Values are published values. Award values are what the authority published, excluding VAT and framework ceilings. They are not a budget or total spend.
- Contract end dates. 172 of 181 published contracts have an end date; 35 of those are estimated as the signature (or publication) date plus the published duration and are marked “estimated”. They feed “Contracts ending”, the same rule as the retender radar.
- Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.