  1. Ends · in 58 days

    Re-roofing works to units 11 and 12 Bunting Road, Bury St Edmunds

    West Suffolk Council · Local authority

    Incumbent: FABER ROOFING LIMITED

    Replacement of a built-up plasterboard/ asbestos-cement roof covering, parapet linings, trims and roof lights with composite insulated roof panels.

    Published value
    £189k
    Annual run-rate
    —term under 6 months
    Term
    5 Oct 2026 → 24 Dec 2026 · 3 months
    Reference
    ocds-h6vhtk-06fb19
  2. Ends · in 58 days

    TfGM Internal alterations at Piccadilly Place (Basement)

    Transport for Greater Manchester · Other public body · North West England

    Incumbent: Schofield & Sons

    TfGM require a sole Supplier to complete a number of internal alteration works, in the basement, at TfGM's headquarters in Manchester. The chosen Supplier must be able to start and complete these works as soon as possible after contract awa…

    Published value
    £136k
    Annual run-rate
    —term under 6 months
    Term
    1 Oct 2026 → 24 Dec 2026 · 3 months
    Reference
    ocds-h6vhtk-078133
  3. Ends · in 58 days

    Diversion of BT Global Services utility apparatus for Thornaby Town Deal Cycleway

    Stockton on Tees Borough Council · Local authority · North East England

    Incumbent: British Telecommunications Plc

    Utility apparatus belonging to BT Openreach has been identified as a constraint in the delivery of a new footpath cycleway scheme. To achieve a compliant scheme to LTN 1/20 and satisfy the requirements of Active Travel England it is necessa…

    Published value
    £113k
    Annual run-rate
    £65kpublished value ÷ term, exc. VAT
    Term
    1 Apr 2025 → 24 Dec 2026 · 1.8 yrs
    Reference
    ocds-h6vhtk-04faa8
  4. Ends · in 58 days

    Specialist Structural Repairs

    London Borough of Harrow · Local authority · Greater London

    Incumbent: ICB GENERAL BULDING AND CIVIL ENGINEERING Ltd

    A Service Imperative circumstance applies to ensure the timely procurement of specialist structural repair services from ICB General Building & Civil Engineering Ltd. Direct appointment of this supplier is necessary to maintain continuity o…

    Published value
    £99k
    Annual run-rate
    £110kpublished value ÷ term, exc. VAT
    Term
    30 Jan 2026 → 24 Dec 2026 · 11 months
    Reference
    ocds-h6vhtk-065366
  5. Ends · in 58 days

    EBCT 442 Street Furniture Painting, Ilkeston Town Centre

    Erewash Borough Council · Local authority · East Midlands

    Incumbent: BELL GROUP LTD · Last contest: awarded 23% under the estimate

    Erewash Borough Council is seeking to appoint a suitable Contractor to carry out the painting of various street furniture located within the town centre at Ilkeston, Derbyshire.

    Published value
    £77k
    Annual run-rate
    —term under 6 months
    Term
    5 Oct 2026 → 24 Dec 2026 · 3 months
    Reference
    ocds-h6vhtk-06abf2
  6. Ends · in 58 days

    Diversion of Virgin Media utility apparatus - Thornaby Town Deal Cycleway

    Stockton on Tees Borough Council · Local authority · North East England

    Incumbent: Virgin Media Business Ltd

    Utility apparatus belonging to Virgin Media has been identified as a constraint in the delivery of a new footpath cycleway scheme. To achieve a compliant scheme to LTN 1/20 and satisfy the requirements of Active Travel England it is necessa…

    Published value
    £49k
    Annual run-rate
    £28kpublished value ÷ term, exc. VAT
    Term
    1 Apr 2025 → 24 Dec 2026 · 1.8 yrs
    Reference
    ocds-h6vhtk-04fabc
  7. Ends · in 58 days

    NDC0035-25 - Improvements to the Old Town Station building in Barnstaple

    North Devon District Council · Local authority · South West England

    Incumbent: Grills Renovation & Refurbishments LTD

    Replacement double glazed units, additional opening casement windows, replacement gas boilers, external decorations and roofing works.

    Published value
    £42k
    Annual run-rate
    £57kpublished value ÷ term, exc. VAT
    Term
    1 Apr 2026 → 24 Dec 2026 · 9 months
    Reference
    ocds-h6vhtk-05e511
  8. Ends · in 59 days

    3553 - Warden Call (Arthur Dann Court)

    Portsmouth City Council · Local authority · South East England

    Incumbent: Legrand Electric Ltd

    This project comprises of the replacement of existing analogue residential Warden and Telecare Call systems with new digital systems. The initial project will be a pilot scheme at Arthur Dann Court, to verify the operation of the chosen sys…

    Published value
    £124kinc. VAT as published
    Annual run-rate
    —term under 6 months
    Term
    3 Aug 2026 → 25 Dec 2026 · 5 months
    Reference
    ocds-h6vhtk-06dca4
  9. Estimated end · in 60 daysFramework record

    2021 - 0868 Wyken Estate Regeneration (Combined SQ and ITT)

    Citizen Housing · West Midlands

    Incumbent: Wates Property Services Ltd

    • Building construction work
    Published value
    £21mpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 26 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-02b711
  10. Ends · in 60 daysLinked to a framework or DPS

    Cumberland Capital Works Framework Lot 1 - Creation of an Integrated Sexual Health Clinic at Civic Centre, Carlisle

    Cumberland Council · Local authority · North West England

    Incumbent: Thomas Armstrong (Construction) Ltd

    Creation of a suitable Integrated Sexual Health Clinic on the ground floor of the Civic Centre. The works comprise the conversion of the existing space with further subdivision, replacement of finishes and associated M&E works.

    Published value
    £562kvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    18 Jul 2026 → 26 Dec 2026 · 5 months
    Reference
    ocds-h6vhtk-06c232
  11. Estimated end · in 61 daysFramework recordPanel · 93 suppliers

    National Framework for Medium Works 23

    THE EDUCATION ALLIANCE · Nationwide (UK)

    Panel: 8 build Limited, Alcema Ltd, Amey Community Ltd +90 more

    • Construction work
    Published value
    £1.0bnpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 27 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-03443d
  12. Estimated end · in 61 days

    Belfast (North / West Belfast)

    Northern Ireland Housing Executive · Northern Ireland

    Incumbent: H A MECHANICAL SERVICES LTD · Last contest: 6 bids (1 SME)

    The Contracting Authority intends to enter into a NEC4 Term Service Contract with the successful Economic Operator(s) for the installation, maintenance, repair, servicing, replacement of boilers and heating systems within its properties to …

    • Central-heating installation work
    Published value
    £114m
    Annual run-rate
    —start date not published
    Term
    Estimated end 27 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-03eb60
  13. Estimated end · in 61 days

    South (Mid Ulster/South Area/South West Area)

    Northern Ireland Housing Executive · Northern Ireland

    Incumbent: BAYVIEW CONTRACTS LTD · Last contest: 6 bids (1 SME)

    The Contracting Authority intends to enter into a NEC4 Term Service Contract with the successful Economic Operator(s) for the installation, maintenance, repair, servicing, replacement of boilers and heating systems within its properties to …

    • Central-heating installation work
    Published value
    £112m
    Annual run-rate
    —start date not published
    Term
    Estimated end 27 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-03eb60
  14. Estimated end · in 61 days

    North (Causeway Area/West Area)

    Northern Ireland Housing Executive · Northern Ireland

    Incumbent: H A MECHANICAL SERVICES LTD · Last contest: 6 bids (1 SME)

    The Contracting Authority intends to enter into a NEC4 Term Service Contract with the successful Economic Operator(s) for the installation, maintenance, repair, servicing, replacement of boilers and heating systems within its properties to …

    • Central-heating installation work
    Published value
    £103m
    Annual run-rate
    —start date not published
    Term
    Estimated end 27 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-03eb60
  15. Estimated end · in 61 days

    Belfast (South and East Belfast/Lisburn and Castlereagh)

    Northern Ireland Housing Executive · Northern Ireland

    Incumbent: Greenview Gas (Ltd) · Last contest: 6 bids (1 SME)

    The Contracting Authority intends to enter into a NEC4 Term Service Contract with the successful Economic Operator(s) for the installation, maintenance, repair, servicing, replacement of boilers and heating systems within its properties to …

    • Central-heating installation work
    Published value
    £99m
    Annual run-rate
    —start date not published
    Term
    Estimated end 27 Dec 2026 · start not published
    Reference
    ocds-h6vhtk-03eb60

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,816 contracts and agreements end within 24 months, 4,714 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months922
  2. 3–6 months574
  3. 6–12 months591
  4. 12–24 months729

Top sectors, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.