UK Power Networks: UK Public Sector Contracts Won & Awards
Large organisation·Companies House: Private Limited Company·Potters Bar·East of England·Main market: Electrical installation work
Official UK PPONPGGV-9992-RNGD
i
How many tenders this supplier has won.
Tenders with at least one award to it. Award records are shown too, because one framework can carry many call-offs.
i
How many different public bodies have awarded to this supplier.
Buyers named on its awards, with duplicate names merged.
i
How much this supplier has won, by published values.
Sum of award values where it was the only winner, VAT excluded, framework ceilings left out.
Not turnover. Not every award publishes a value.
i
Awards to this supplier in the last 12 months.
Award records dated in the last 12 months, against the two years before.
i
Contracts that finish in the next 18 months.
Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.
An end date does not confirm a new procurement.
i
In which regions this supplier wins work.
The region of each buyer it won from: the buyer’s office, placed by the official ONS postcode lookup. Each procedure counts once.
Where the buyer is based, not necessarily where the work was done; the tender page shows the published place of delivery.
Where they wini
In which categories this supplier wins.
Distinct awards by the main category of the lot, or of the procedure when no lot is named. Repeat publications count once.
An award counts once in each class it covers; classes can overlap.
i
In which categories this supplier wins.
Distinct awards by the main category of the lot, or of the procedure when no lot is named. Repeat publications count once.
An award counts once in each class it covers; classes can overlap.
23 awards (23 for a named lot, 100%, 0 for a whole procedure with no lot named) · top CPV classes, shares of all 23 awards. An award may cover more than one class.
4531 Electrical installation work9 awards · 39% · awards naming a lot4523 Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork4 awards · 17% · awards naming a lot6530 Electricity distribution and related services4 awards · 17% · awards naming a lot9839 Other services1 award · 4% · awards naming a loti
How much this supplier has won, by published values.
Sum of award values where it was the only winner, VAT excluded, framework ceilings left out.
Not turnover. Not every award publishes a value.
i
What one of this supplier’s wins is usually worth.
Middle value of the same awards as the total above.
Largest published awards iThe biggest published awards. Awards to a single supplier with a published value, largest first, so you can check the totals against the notice. A repeated framework total can appear here. Open the notice to check. | Authority | Awarded | Term | Published value |
|---|---|---|---|---|
| SCAH Power Upgrades – PR27 Woodham Lane | Defra Network eTendering Portal | — | — | £40,911,987 † |
| 1 | National Highways Limited | — | — | £20,301,378 † |
| The decommissioning and removal of Shornewood Switching Station (33kV) | National Highways Limited | — | — | £9,792,446 † |
| LTC-UK Power Networks – Diversion Agreement – PEA Route | National Highways Limited | 19 Aug 2026 | 2.6 yrs | £8,920,090 ≈ £3.5m/yr |
| LTC-UK Power Networks – Diversion Agreement – PAB Route | National Highways Limited | 19 Aug 2026 | 3.6 yrs | £5,537,028 ≈ £1.5m/yr |
Where their buyers arei
In which regions this supplier wins work.
The region of each buyer it won from: the buyer’s office, placed by the official ONS postcode lookup. Each procedure counts once.
Where the buyer is based, not necessarily where the work was done; the tender page shows the published place of delivery.
i
In which regions this supplier wins work.
The region of each buyer it won from: the buyer’s office, placed by the official ONS postcode lookup. Each procedure counts once.
Where the buyer is based, not necessarily where the work was done; the tender page shows the published place of delivery.
ITL1 region of the buyer office · known for 19 of 19 awarded procedures · each procedure counts once
Who they sell toi
Which public bodies award work to this supplier.
Authorities named on its published awards, ranked by distinct procedures, duplicate names merged.
i
Which public bodies award work to this supplier.
Authorities named on its published awards, ranked by distinct procedures, duplicate names merged.
Authorities named on this supplier’s published awards · ranked by distinct procedures · a framework or DPS adds one award record per appointed supplier
i
What kinds of public bodies award work to this supplier.
Its award records by the authority’s published type, otherwise by its name. One framework can add many records.
Central government52%(12 awards)
12 of 23 awards are Central government (52%).Other public body22%(5 awards)
5 of 23 awards are Other public body (22%).Type not classified22%(5 awards)
5 of 23 awards are Type not classified (22%).Police & fire4%(1 award)
1 of 23 awards is Police & fire (4%).
| Authority | Procedures | Share | Award records | Last activity |
|---|---|---|---|---|
| National Highways Limited | 7 | 36.8% | 7 | 2 Oct 2026 |
| Guy's and St Thomas' NHS Foundation Trust | 2 | 10.5% | 2 | 20 Apr 2026 |
| Southern Water Services Limited | 1 | 5.3% | 4 | 17 Mar 2025 |
| London Fire Brigade | 1 | 5.3% | 2 | 6 Jun 2025 |
| Defra Network eTendering Portal | 1 | 5.3% | 1 | 24 Oct 2022 |
| West Hertfordshire Teaching Hospitals NHS Trust | 1 | 5.3% | 1 | 19 Jul 2026 |
| Ebbsfleet Development Corporation | 1 | 5.3% | 1 | 5 Jun 2026 |
| Forestry Commission | 1 | 5.3% | 1 | 4 Sept 2025 |
Share = of the 19 procedures with an award naming this supplier. Last activity = award date, or notice publication when no award date was published.
Contracts endingi
Contracts that finish in the next 18 months.
Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.
An end date does not confirm a new procurement.
i
Contracts that finish in the next 18 months.
Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.
An end date does not confirm a new procurement.
13 of 23 awards carry an end date, 1 estimated from the duration · not a retender forecast
| Contract | Ends | Published value |
|---|---|---|
| Supply upgrade to Bedgebury Walled Garden Power Supply including substation | 12 Nov 2026 | £124,746 |
| UKRI-5252 | 31 Dec 2026 | £85,891 |
| LTC-UK Power Networks – Diversion Agreement – Station Road (11kV-0024) | 31 Mar 2028 | £403,368 |
| LTC-UKPN 11kV Stifford Clays Road (E-UKPN-11kV-0015) (Bell Mouth Construction) | 31 Mar 2028 | £76,195 |
Recent awards
Latest 23 of 23 award records naming this supplier
About this data
- Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
- One profile per supplier. Built from award and contract notices that name this supplier; different spellings and registration numbers of the same company are merged into this profile.
- Values are published values. The table mirrors what the notice published: framework ceilings and joint awards are labelled and never counted as this supplier's money, and † marks a value taken from the contract notice when the award published none. Only awards made to this supplier alone count towards its value, excluding VAT. It is not turnover.
- Regions on this page are where the work is delivered, not the supplier’s registered address.
- Contract end dates. Published on 12 of 23 awards, estimated from the published duration on 1 more (marked “estimated”); those feed “Contracts ending”.
- Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.