Find a TenderAwarded
Published 18 Nov 2021, 14:30 GMT

Official UK procurement notice

001103 - Supply, Installation, Servicing, Maintenance, Removal, Storage, Refurbishment and Re-siting of Stairlifts, Step Lifts, Vertical Through Floor Lifts and Ceiling Track Hoists

Official notice

Authority: YPO·Consortium: 2 public authorities

Framework agreement11 lotsGoodsOpen procedure
Framework ceiling (notional)£10,000,000total for 11 lots · framework ceiling, not attributable revenue · 1 value update
Submissions closed 21 Apr 2022awarded 17 Jun 2022
Lots 11see the lot list below
Framework period 4 yrsends 26 Jun 2026 · extension options published · starts 27 Jun 2022

What is being bought11 lots · detail below

Published requirement description

YPO are looking for Providers to be appointed onto a Framework Agreement for the Supply, Installation, Servicing, Maintenance, Removal, Storage, Refurbishment and Re-siting of Stairlifts, Step Lifts, Vertical Through Floor Lifts and Ceiling Track Hoists. The Framework is designed to meet the needs of all public sector organisations which includes YPO’s internal requirements.

  • Recurrence: There is a possibility that this framework will be subject to renewal after 3.5 years from the commencement date.

CPV: Hoists · Lift and escalator installation work · Lift installation work · Lift-maintenance services · Lifts · Lifts, skip hoists, hoists, escalators and moving walkways · Repair and maintenance services of electrical machinery, apparatus and associated equipment · Stairlifts

How this framework works

From the published notice
Bids received
20 bids received · 17 suppliers appointed
Framework period
4 yrs from 27 Jun 2022

Lots and requirements (11)Procurement structure

11 lots · no lot values published · evaluation weights differ by lot
Lot #1Stairlifts (Straight) - Supply and installation of new equipment including servicing, maintenance under original manufacturer’s warranty and removal, storage, refurbishment, and re-siting of equipment.CancelledRenewal 4 yrs

Stairlifts (Straight) - Supply and installation of new equipment including servicing, maintenance under original manufacturer’s warranty and removal, storage, refurbishment, and re-siting of equipment.

Contract period: 27 Jun 2022 – 26 Jun 2026 (4 yrs)
Delivery: UK
Extensions: There is a possibility that this framework will be subject to renewal after 3.5 years from the commencement date.Variant bids: not allowed
Lot #2Stairlifts (Straight) – Servicing and maintenance of equipment no longer under warranty and removal, storage, refurbishment, and re-siting of existing equipmentCancelledRenewal 4 yrs

Stairlifts (Straight) – Servicing and maintenance of equipment no longer under warranty and removal, storage, refurbishment, and re-siting of existing equipment

Contract period: 27 Jun 2022 – 26 Jun 2026 (4 yrs)
Delivery: UK
Extensions: There is a possibility that this framework will be subject to renewal after 3.5 years from the commencement date.Variant bids: not allowed
Lot #3Stairlifts (Curved) – Supply and installation of new equipment including servicing, maintenance under original manufacturer’s warranty and removal, storage, refurbishment, and re-siting of equipmentCancelledRenewal 4 yrs

Stairlifts (Curved) – Supply and installation of new equipment including servicing, maintenance under original manufacturer’s warranty and removal, storage, refurbishment, and re-siting of equipment

Contract period: 27 Jun 2022 – 26 Jun 2026 (4 yrs)
Delivery: UK
Extensions: There is a possibility that this framework will be subject to renewal after 3.5 years from the commencement date.Variant bids: not allowed
Lot #4Stairlifts (Curved) – Servicing and maintenance of equipment no longer under warranty and removal, storage, refurbishment, and re-siting of existing equipmentCancelledRenewal 4 yrs

Stairlifts (Curved) – Servicing and maintenance of equipment no longer under warranty and removal, storage, refurbishment, and re-siting of existing equipment

Contract period: 27 Jun 2022 – 26 Jun 2026 (4 yrs)
Delivery: UK
Extensions: There is a possibility that this framework will be subject to renewal after 3.5 years from the commencement date.Variant bids: not allowed
Lot #5Steplifts – Supply and installation of new equipment including servicing, maintenance under original manufacturer’s warranty and removal, storage, refurbishment, and re-siting of equipment.CancelledRenewal 4 yrs

Steplifts – Supply and installation of new equipment including servicing, maintenance under original manufacturer’s warranty and removal, storage, refurbishment, and re-siting of equipment.

Contract period: 27 Jun 2022 – 26 Jun 2026 (4 yrs)
Delivery: UK
Extensions: There is a possibility that this framework will be subject to renewal after 3.5 years from the commencement date.Variant bids: not allowed
Lot #6Steplifts – Servicing and maintenance of equipment no longer under warranty and removal, storage, refurbishment, and re-siting of existing equipmentCancelledRenewal 4 yrs

Steplifts – Servicing and maintenance of equipment no longer under warranty and removal, storage, refurbishment, and re-siting of existing equipment

Contract period: 27 Jun 2022 – 26 Jun 2026 (4 yrs)
Delivery: UK
Extensions: There is a possibility that this framework will be subject to renewal after 3.5 years from the commencement date.Variant bids: not allowed
Lot #7Vertical Through Floor Lifts – Supply and installation of new equipment including servicing, maintenance under original manufacturer’s warranty and removal, storage, refurbishment, and re-siting of equipmentCancelledRenewal 4 yrs

Vertical Through Floor Lifts – Supply and installation of new equipment including servicing, maintenance under original manufacturer’s warranty and removal, storage, refurbishment, and re-siting of equipment

Contract period: 27 Jun 2022 – 26 Jun 2026 (4 yrs)
Delivery: UK
Extensions: There is a possibility that this framework will be subject to renewal after 3.5 years from the commencement date.Variant bids: not allowed
Lot #8Vertical Through Floor Lifts – Servicing and maintenance of equipment no longer under warranty and removal, storage, refurbishment, and re-siting of existing equipmentCancelledRenewal 4 yrs

Vertical Through Floor Lifts – Servicing and maintenance of equipment no longer under warranty and removal, storage, refurbishment, and re-siting of existing equipment

Contract period: 27 Jun 2022 – 26 Jun 2026 (4 yrs)
Delivery: UK
Extensions: There is a possibility that this framework will be subject to renewal after 3.5 years from the commencement date.Variant bids: not allowed
Lot #9Ceiling Track Hoists – Supply and installation of new equipment including servicing, maintenance under original manufacturer’s warranty and removal, storage, refurbishment, and re-siting of equipment.CancelledRenewal 4 yrs

Ceiling Track Hoists – Supply and installation of new equipment including servicing, maintenance under original manufacturer’s warranty and removal, storage, refurbishment, and re-siting of equipment.

Contract period: 27 Jun 2022 – 26 Jun 2026 (4 yrs)
Delivery: UK
Extensions: There is a possibility that this framework will be subject to renewal after 3.5 years from the commencement date.Variant bids: not allowed
Lot #10Ceiling Track Hoists – Servicing and maintenance of equipment no longer under warranty and removal, storage, refurbishment, and re-siting of existing equipmentAwarded

Ceiling Track Hoists – Servicing and maintenance of equipment no longer under warranty and removal, storage, refurbishment, and re-siting of existing equipment

Delivery: UK
Lot #11One Stop Shop – For Providers who’re awarded onto all the Lots, 1 to 10 will automatically be awarded onto Lot 11.Cancelled

One Stop Shop – For Providers who’re awarded onto all the Lots, 1 to 10 will automatically be awarded onto Lot 11.

Delivery: UK

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored

Lots publish different evaluation splits; there is no single procedure weighting.

LotQualityPriceSocial valueEnvironmentalSplit
1 · Stairlifts (Straight) - Supply and installation of new equipment including servicing, maintenance under original manufacturer’s warranty and removal, storage, refurbishment, and re-siting of equipment.454555
10 · Ceiling Track Hoists – Servicing and maintenance of equipment no longer under warranty and removal, storage, refurbishment, and re-siting of existing equipment454555
11 · One Stop Shop – For Providers who’re awarded onto all the Lots, 1 to 10 will automatically be awarded onto Lot 11.454555
2 · Stairlifts (Straight) – Servicing and maintenance of equipment no longer under warranty and removal, storage, refurbishment, and re-siting of existing equipment45—55
3 · Stairlifts (Curved) – Supply and installation of new equipment including servicing, maintenance under original manufacturer’s warranty and removal, storage, refurbishment, and re-siting of equipment454555
4 · Stairlifts (Curved) – Servicing and maintenance of equipment no longer under warranty and removal, storage, refurbishment, and re-siting of existing equipment454555
5 · Steplifts – Supply and installation of new equipment including servicing, maintenance under original manufacturer’s warranty and removal, storage, refurbishment, and re-siting of equipment.454555
6 · Steplifts – Servicing and maintenance of equipment no longer under warranty and removal, storage, refurbishment, and re-siting of existing equipment454555
7 · Vertical Through Floor Lifts – Supply and installation of new equipment including servicing, maintenance under original manufacturer’s warranty and removal, storage, refurbishment, and re-siting of equipment454555
8 · Vertical Through Floor Lifts – Servicing and maintenance of equipment no longer under warranty and removal, storage, refurbishment, and re-siting of existing equipment454555
9 · Ceiling Track Hoists – Supply and installation of new equipment including servicing, maintenance under original manufacturer’s warranty and removal, storage, refurbishment, and re-siting of equipment.454555
Conditions of participation1
  • Suitability

    Organisations must ensure that they are not in breach of any of the mandatory or discretionary exclusions contained in Regulation 57 of the Public Contracts Regulations 2015. Please refer to the Tender Documentation/ Online Tender located on our E-Procurement system. The web address can be found under ‘Procurement Documents’ in ‘Communication’ section in this notice.

What this means for your bid
  • Price carries 45 points on every lot: a 10% discount moves about 4.5 points.
  • “001103 - Supply, Installation, Servicing, Maintenance, Removal,…” is a framework: the contest is a place on its panel, not a single contract.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record · publisher note attached
Procedure method
Open procedure
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Goods
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement

Yes · There is a possibility that this framework will be subject to renewal after 3.5 years from the commencement date.

First published
18 Nov 2021, 14:30 GMT
Last source update
4 Jul 2022, 15:53 BST
Award evaluation window
4 Apr 2022 – …
Authority reference
001103
FTS notice number
2022/S 000-018195
Classification (CPV)
HoistsLift and escalator installation workLift installation workLift-maintenance servicesLiftsLifts, skip hoists, hoists, escalators and moving walkwaysRepair and maintenance services of electrical machinery, apparatus and associated equipmentStairlifts
Delivery area
UK
Official registry OCID
ocds-h6vhtk-02f802 Find a Tender
Contract terms
Performance terms

Please refer to the Framework Agreement Terms and Conditions located on our E-Procurement system. The web address can be found under Procurement Documents in ‘Communication’ Section in this notice.

Publisher note: YPO are purchasing on the behalf of other contracting authorities. Please see the below link for details: https://www.ypo.co.uk/about/customers/permissible-users . YPO will incorporate a standstill period at the point of notification of the award of the contract is provided to all bidders. The standstill period will be for a minimum of 10 calendar days, and provides time for unsuccessful tenderers to challenge the award decision before the contract is entered into. The Public Contracts Regulations 2015 provide for aggrieved parties who have been harmed or are at risk of harm by a breach of the rules to take action in the High Court (England, Wales and Northern Ireland).

How it was run

Official notice
Run through: ProContract (Due North) · Who buys & how to bid on ProContract
Supplier login requiredLanguage: EN
Access & registration note: Free · short registration with manual review; public opportunity list
Appointment period ends
21 Apr 2022, 14:00 BST
Submission channel
{"electronicSubmission"}
Accepted languages
en
Bid validity
90 days from the deadline
Bids opened
4 Apr 2022, 14:00 BST
Detailed submission instructions & authority contactsFrom official release

Timeline

17 Jan 2022 → 4 Jul 2022 · 5 dates
  1. Next notice expected
    17 Jan 2022
  2. Bids opened
    4 Apr 2022, 14:00 BST
  3. Admission / appointment period endsperiod end, not a bid countdown
    21 Apr 2022, 14:00 BST
  4. Contract starts
    27 Jun 2022, 00:00 BST
  5. Notice published
    4 Jul 2022, 15:53 BST

Notice history

7 events · 5 releases on Find a Tender · since 28 Feb 2022
  1. Published value published: £10,000,000
    28 Feb 2022, 20:35 GMT
  2. Status changed to active
    28 Feb 2022, 20:35 GMT
  3. Procurement method changed
    28 Feb 2022, 20:35 GMT
  4. Deadline published: 4 Apr 2022, 14:00 BST
    28 Feb 2022, 20:35 GMT
  5. Buyer details updated
    28 Feb 2022, 20:35 GMT
  6. Deadline moved to 21 Apr 2022, 14:00 BST
    17 Mar 2022, 17:47 GMT
    +17 days · was 4 Apr 2022, 14:00 BST
  7. Status changed to complete
    4 Jul 2022, 15:53 BST
Published amendments (2 · 1 deadline change)
WhenWhatBeforeAfterShift
—TextTitle · II.2.1Lot 6 - Vertical through Floor LiftsLot 6 - Vertical through Floor Lifts - Service and Maintenance
—DeadlineTime limit for receipt of tenders or requests to participate Date · IV2.24 Apr 202221 Apr 2022+17 d
—Bid openingConditions for opening of tenders · IV2.74 Apr 202221 Apr 2022+17 d

2 amendments published without a description.

Routine re-releases (5)
  • 2021-11: 2 releases · 18 Nov 2021, 23 Nov 2021

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 17admitted to the panel · see the list ↓
Bids received 20
Contracts signed 17latest 17 Jun 2022

17 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.

Contracts

All 17 of these contracts carry the same published figure, £10,000,000, the framework's maximum for the whole notice, not each contract's own value. They are not eleven separate sums.

  • 001103 - Supply, Installation, Servicing, Maintenance, Removal, Storage, Refurbishment and Re-siting of Stairlifts, Step Lifts, Vertical Through Floor Lifts and Ceiling Track Hoists

    Signed
    17 Jun 2022
    Value
    ceiling above
    Status
    active
  • 001103 – Supply, Installation, Servicing, Maintenance, Removal, Storage, Refurbishment and Re-siting of Stairlifts, Step Lifts, Vertical Through Floor Lifts and Ceiling Track Hoists

    Signed
    17 Jun 2022
    Value
    ceiling above
    Status
    active
  • 001103 – Supply, Installation, Servicing, Maintenance, Removal, Storage, Refurbishment and Re-siting of Stairlifts, Step Lifts, Vertical Through Floor Lifts and Ceiling Track Hoists

    Signed
    17 Jun 2022
    Value
    ceiling above
    Status
    active
  • 001103 – Supply, Installation, Servicing, Maintenance, Removal, Storage, Refurbishment and Re-siting of Stairlifts, Step Lifts, Vertical Through Floor Lifts and Ceiling Track Hoists

    Signed
    17 Jun 2022
    Value
    ceiling above
    Status
    active
  • 001103 – Supply, Installation, Servicing, Maintenance, Removal, Storage, Refurbishment and Re-siting of Stairlifts, Step Lifts, Vertical Through Floor Lifts and Ceiling Track Hoists

    Signed
    17 Jun 2022
    Value
    ceiling above
    Status
    active
  • 001103 – Supply, Installation, Servicing, Maintenance, Removal, Storage, Refurbishment and Re-siting of Stairlifts, Step Lifts, Vertical Through Floor Lifts and Ceiling Track Hoists

    Signed
    17 Jun 2022
    Value
    ceiling above
    Status
    active
  • 001103 – Supply, Installation, Servicing, Maintenance, Removal, Storage, Refurbishment and Re-siting of Stairlifts, Step Lifts, Vertical Through Floor Lifts and Ceiling Track Hoists

    Signed
    17 Jun 2022
    Value
    ceiling above
    Status
    active
  • 001103 – Supply, Installation, Servicing, Maintenance, Removal, Storage, Refurbishment and Re-siting of Stairlifts, Step Lifts, Vertical Through Floor Lifts and Ceiling Track Hoists

    Signed
    17 Jun 2022
    Value
    ceiling above
    Status
    active
  • 001103 – Supply, Installation, Servicing, Maintenance, Removal, Storage, Refurbishment and Re-siting of Stairlifts, Step Lifts, Vertical Through Floor Lifts and Ceiling Track Hoists

    Signed
    17 Jun 2022
    Value
    ceiling above
    Status
    active
  • 001103 - Supply, Installation, Servicing, Maintenance, Removal, Storage, Refurbishment and Re-siting of Stairlifts, Step Lifts, Vertical Through Floor Lifts and Ceiling Track Hoists

    Signed
    17 Jun 2022
    Value
    ceiling above
    Status
    active
  • 001103 – Supply, Installation, Servicing, Maintenance, Removal, Storage, Refurbishment and Re-siting of Stairlifts, Step Lifts, Vertical Through Floor Lifts and Ceiling Track Hoists

    Signed
    17 Jun 2022
    Value
    ceiling above
    Status
    active
  • 001103 – Supply, Installation, Servicing, Maintenance, Removal, Storage, Refurbishment and Re-siting of Stairlifts, Step Lifts, Vertical Through Floor Lifts and Ceiling Track Hoists

    Signed
    17 Jun 2022
    Value
    ceiling above
    Status
    active
  • 001103 – Supply, Installation, Servicing, Maintenance, Removal, Storage, Refurbishment and Re-siting of Stairlifts, Step Lifts, Vertical Through Floor Lifts and Ceiling Track Hoists

    Signed
    17 Jun 2022
    Value
    ceiling above
    Status
    active
  • 001103 – Supply, Installation, Servicing, Maintenance, Removal, Storage, Refurbishment and Re-siting of Stairlifts, Step Lifts, Vertical Through Floor Lifts and Ceiling Track Hoists

    Signed
    17 Jun 2022
    Value
    ceiling above
    Status
    active
  • 001103 – Supply, Installation, Servicing, Maintenance, Removal, Storage, Refurbishment and Re-siting of Stairlifts, Step Lifts, Vertical Through Floor Lifts and Ceiling Track Hoists

    Signed
    17 Jun 2022
    Value
    ceiling above
    Status
    active
  • 001103 – Supply, Installation, Servicing, Maintenance, Removal, Storage, Refurbishment and Re-siting of Stairlifts, Step Lifts, Vertical Through Floor Lifts and Ceiling Track Hoists

    Signed
    17 Jun 2022
    Value
    ceiling above
    Status
    active
  • 001103 – Supply, Installation, Servicing, Maintenance, Removal, Storage, Refurbishment and Re-siting of Stairlifts, Step Lifts, Vertical Through Floor Lifts and Ceiling Track Hoists

    Signed
    17 Jun 2022
    Value
    ceiling above
    Status
    active

Bid statistics published by the authority

LotBidsSMEVCSEValid bid range
10 · Ceiling Track Hoists – Servicing and maintenance of equipment no longer under warranty and removal, storage, refurbishment, and re-siting of existing equipment20bids———
Whole notice20bids———

Contracting authority & participating public bodies

2 public bodies on the notice

YPO

Contracting authorityBody governed by public lawGeneral public services 41 Industrial Park, Wakefield, Yorkshire & Humber, WF2 0XEContact name, email, phone Published organisation website ↗

Consortium members and other public bodies

  • Yorkshire Purchasing OrganisationContracting authorityBody governed by public lawGeneral public services WAKEFIELD, Yorkshire & HumberContact name, email, phone

Dispute resolution & review bodies

  • High Court of England and WalesReview body London

Framework contractors & participating bidders

17 commercial parties on the notice
Show 7 more suppliers

Official documents & specifications (2)

Official links; attachments are not copied

Tender pack and attachments

  • Economic and financial selection criteriatenderEconomic and financial selection criteria
  • Technical selection criteriatenderTechnical selection criteria