Official UK procurement notice
Building Management System · UK public procurement notice
Authority: York Teaching Hospital Facilities Management Company
What is being bought
Published requirement descriptionMaintenance and support of Building Management System (BMS) including new installations and replacements / upgrades.
CPV: Repair and maintenance services of building installations · Repair and maintenance services of electrical and mechanical building installations
The lotProcurement structure
single lot · no lot value publishedLot #1York Teaching Hospital Facilities Management provides a comprehensive range of…Awarded
York Teaching Hospital Facilities Management provides a comprehensive range of facilities and estates services to healthcare providers throughout York and North Yorkshire.Our annual turnover is £108.4m. We cover eight hospital sites (York, Scarborough, Bridlington, Malton, Selby, Easingwold and two rehabilitation units, Whitecross Court and St Helens) and have a workforce of just over 1,000 staff working across our hospitals and in the community. Our work ensures that facilities, projects and contracts are managed efficiently, correctly, on time and on budget.York Teaching Hospital Facilities Management (YTHFM) has for many years used the Continuum as main the main system for hospital BMS including heating, ventilation and air conditioning (HVAC) and security system first developed in 1998 by Andover Controls.This system is now unable to be support by brand new hardware although a strategy has been developed to release spare parts from upgrades and it is envisaged that Continuum will need to remain operational for the entire length of the contract.There are also a number of other systems in place within the Estate that require maintenance and improvement, most notably the Cylon system at Selby War Memorial Hospital.The bidder is expected to provide staff with the technical knowledge and expertise to be able to maintain and modify the Continuum System and other legacy systems and that the percentage of the service requirement dedicated to the legacy systems is to be determined by YTHFM.As over 90% of the current installed BMS system uses Continuum hardware, it is envisaged that the maintenance of the Continuum system will be form the major proportion of the workload of any maintenance engineers in the near term. To be able to provide service to all the sites outlined on the Service Specification Document and commit to 52 service days per year that will require Service Engineer presence at York, Scarborough, Bridlington, Malton or Selby Hospital.The estimated contract spend is around £150-300,000 per annum dependent on the number of upgrades, budget constraints and business pressures.The contract term will be 5 years.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published award criteria (2)
- Quality: 40%
- Price: 60%
- Price carries 60 of 100 points: a 10% discount moves about 6 points. This one is won on the number: sharpen the price before polishing the prose.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record- Procedure method
- Open procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Services
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- No (one-off requirement)
- First published
- 7 May 2021, 09:15 BST
- Last source update
- 14 Jul 2021, 08:44 BST
- Award evaluation window
- 10 Jun 2021 – …
- Authority reference
PH/21/1408- FTS notice number
2021/S 000-016433- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-02ae2dFind a Tender
How it was run
Official notice- Submission deadline
- 10 Jun 2021, 12:00 BST
- Submission channel
- {"electronicSubmission","written"}
- Accepted languages
- en
- Bids opened
- 10 Jun 2021, 12:00 BST
Timeline
10 Jun 2021 → 1 Aug 2021 · 4 dates- Submission deadline10 Jun 2021, 12:00 BST
- Bids opened10 Jun 2021, 12:00 BST
- Notice published14 Jul 2021, 08:44 BST
- Contract starts1 Aug 2021, 00:00 BST
Notice history
1 event · 2 releases on Find a Tender- Status changed to complete14 Jul 2021, 08:44 BST
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| SCHNEIDER ELECTRIC LIMITED | £1,000,000 † | — | Awarded |
Contracts
Building Management System · SCHNEIDER ELECTRIC LIMITED
- Signed
- 14 Jul 2021
- Value
- £1,000,000
- Period
- … – 31 Jul 2026
- Status
- active
Bid statistics published by the authority
| Bids | SME | VCSE | Valid bid range |
|---|---|---|---|
| 3bids · 3 electronic · 3 from abroad | 1 | — | — |
Contracting authority & participating public bodies
Dispute resolution & review bodies
- Public Procurement Review ServiceReview body
Bidders & participating suppliers
1 commercial party on the notice- Schneider Electric LtdAwarded supplier
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.