Find a TenderCancelledProcurement termination notice
Published 16 Sept 2025, 12:20 BST

Official UK procurement notice

Estates Framework - Planned and Reactive Maintenance

Official notice

Authority: The Police and Crime Commissioner for Leicestershire (Police & fire)

Framework agreement5 lotsWorksOpen procedureAbove thresholdSME suitable
Framework ceiling (notional)£10,000,000total for 5 lots · framework ceiling, not attributable revenue
Submissions closed 20 Oct 2025
Lots 5see the lot list below
Framework period 4 yrsends 31 Mar 2030 · starts 1 Apr 2026

What is being bought5 lots · detail below

Published requirement description

The contracting authority is seeking to award a Framework Agreement for the provision of planned and reactive maintenance works across Leicestershire Police. The framework will cover mutiple lots including plumbing, surfacing, electrical works, roofing services and general building works. The Contracting Authority wishes to establish between two and six providers (plus others within 1 point of the sixth-place score) per lot.

All tender documentation will be available on the In-Tend Portal: sell2.in-tend.co.uk/blpd/home ↗. Documents are as follows:

  • Attachment 1 - CONT0467 - ITT - Schedule of Non-Compliance
  • Attachment 2 - CONT0467 - ITT Instructions to Bidders
  • Attachment 3 - CONT0467 - Estates Framework - Statement of Requirements DRAFT
  • Attachment 4 - CONT0467 - ITT Response to Tender - Technical Response
  • Attachment 5 - CONT0467 - Pricing Schedule
  • Attachment 6 - CONT0467 - Conditions of Contract - Estates Framework DRAFT
  • Procurement Specific Questionnaire (PSQ) - V3
  • Annex 1 - Electrical Quality Specification
  • Annex 2 - Equality Duty Guidance for Contractors and Suppliers
  • Annex 3 - Code of Conduct for Contractors and Suppliers
  • Annex 4 - CHAS
  • Annex 5 - Lot 1 - Plumbing Scenario
  • Annex 6 - Lot 2 - Surfacing Scenario
  • Annex 7 - Lot 3 - Electrical Scenario
  • Annex 8 - Lot 4 - Roofing Scenario
  • Annex 9 - Lot 5 - General Building Scenario

CPV: Electrical services · Repair and maintenance services of building installations · Resurfacing works · Roof works and other special trade construction works · Water plumbing work

How this framework works

From the published notice
Type
Closed framework
Call-offs
call-offs may be awarded directly or by further competition
Places
up to 30 suppliers
Framework period
4 yrs from 1 Apr 2026
Published description of the framework

All instructions must be accompanied by a work order from Estates Helpdesk, this will then be followed up with an official purchase order by electronically in due course. Unless otherwise stated remedial works to a value of £500 can be carried out without referral to the Estates Helpdesk. For works likely to exceed this amount further authorisation must be obtained from the Estates Helpdesk. The Contractor shall not accept instructions from site personnel without approval from the Estates Helpdesk.

All works (planned and reactive) above £20,001.00 (exc VAT) shall be awarded through further competitions via this Framework issued on the procurement portal with drawings and specifications to all Contractors on the framework for that lot. Each project shall be awarded to the lowest tenderer, subject to a satisfactory tender. The Contracting Authority reserve the right to implement JCT contracts for these projects. Where the Contracting Authority mandate that this needs to be signed, works will not be awarded unless signed.

Planned/Reactive maintenance works up to £20,000.99 (exc VAT) shall be apportioned on a rotation basis subject to price, availability, reliability/timeliness, and quality of workmanship, security clearance and health & safety.

All Contractors on each Lot will be listed. Works will then be allocated on a turn-by-turn basis, moving down the list. If the Contractor next on the list is not available to undertake the work (due to the reasons set out above) then the next Contractor on the list will be offered the opportunity. The next call-off opportunity will continue down the list and the Contractor will need to wait for their turn when it comes around next time going through the list on a turn-by-turn rotation basis.

Any reports of poor performance based on the above criteria, will be investigated by the Contracting Authority and may result in a Contractor being suspended from the turn-by-turn rotation between Contractors servicing the framework.

Lots and requirements (5)Procurement structure

5 lots · all with a published value · same evaluation weights on every lot

Every one of these 5 lots carries the same published figure, £10,000,000: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.

Lot #1PlumbingAwarded 4 yrsSMEceiling above

Including: water and gas, from repairs and maintenance to refurbishment projects.

Contract period: 1 Apr 2026 – 31 Mar 2030 (4 yrs)
Delivery: East MidlandsEligibility: SME eligible
Lot #2Surfacing worksAwarded 4 yrsSMEceiling above

Includes: resurfacing paths and roads and line painting.

Contract period: 1 Apr 2026 – 31 Mar 2030 (4 yrs)
Delivery: East MidlandsEligibility: SME eligible
Lot #3Electrical WorksAwarded 4 yrsSMEceiling above

All aspects of electrical works.

Contract period: 1 Apr 2026 – 31 Mar 2030 (4 yrs)
Delivery: East MidlandsEligibility: SME eligible
Lot #4Roofing ServicesAwarded 4 yrsSMEceiling above

Including: flat roofs, pitched tiles, from repairs and maintenance to replacement roofing projects.

Contract period: 1 Apr 2026 – 31 Mar 2030 (4 yrs)
Delivery: East MidlandsEligibility: SME eligible
Lot #5General BuildingAwarded 4 yrsSMEceiling above

Including: joinery, minor repairs, planned projects and minor new works.

Contract period: 1 Apr 2026 – 31 Mar 2030 (4 yrs)
Delivery: East MidlandsEligibility: SME eligible

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored · same split on all 5 lots
Quality: 40%Price: 60%
Published sub-criteria (2)
  • Technical (Including Social Value): 40%
  • Cost: 60%
Published award criteria (2)
  • Technical (Including Social Value)
  • Cost
Lot distribution rule: The tenderer may tender for more than one lot, however they will only awarded to one lot based on their preferences, unless there is less than six awarded companies on a less preferred lot and are within the sixth ranked tenderer.
What this means for your bid
  • Price carries 60 of 100 points: a 10% discount moves about 6 points. This one is won on the number: sharpen the price before polishing the prose.
  • “Estates Framework - Planned and Reactive Maintenance” is a framework: the contest is a place on its panel, up to 30 suppliers, not a single contract: call-offs may be direct or by further competition.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Open procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Works
Notice status
Cancelled
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
16 Sept 2025, 12:20 BST
Last source update
4 Nov 2025, 15:14 GMT
Award evaluation window
Submission end – 20 Nov 2025
Authority reference
CONT0467
FTS notice number
2025/S 000-056914
Latest notice
Procurement termination notice (UK12)
Classification (CPV)
Electrical servicesRepair and maintenance services of building installationsResurfacing worksRoof works and other special trade construction worksWater plumbing work
Delivery area
East Midlands (UKF)
Official registry OCID
ocds-h6vhtk-059b33 Find a Tender

How it was run

Official notice
Run through: In-tend · Who buys & how to bid on In-tend
Supplier login requiredElectronic submission allowedLanguage: EN
Access & registration note: Free · one account per buying organisation's portal · reCAPTCHA on signup
Appointment period ends
20 Oct 2025, 10:00 BST
Clarification deadline
6 Oct 2025, 10:00 BST
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

Tenders should be submitted by 10am on 20th October 2025 via the In-Tend portal - sell2.in-tend.co.uk/blpd/home ↗.

Timeline

16 Sept 2025 → 1 Apr 2026 · 6 dates
  1. Tender notice published
    16 Sept 2025, 12:20 BST
  2. Clarification questions by386 days ago
    6 Oct 2025, 10:00 BST
  3. Admission / appointment period ends372 days ago · period end, not a bid countdown
    20 Oct 2025, 10:00 BST
  4. Latest notice published357 days ago
    4 Nov 2025, 15:14 GMT
  5. Award decision expected by340 days ago
    20 Nov 2025, 23:59 GMT
  6. Contract starts209 days ago
    1 Apr 2026, 00:00 BST

Notice history

3 events · 2 releases on Find a Tender · since 16 Sept 2025
  1. Tender notice published
    16 Sept 2025, 12:20 BST
    UK4
  2. Procurement termination notice published
    4 Nov 2025, 15:14 GMT
    UK12
  3. Status changed to complete
    4 Nov 2025, 15:14 GMT

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awards 1
Awarded toValueDateStatus
Across several lots1 award
supplier not published—4 Nov 2025CancelledThis procurement will be terminated and re-tendered with amendments to the tender pack.

Contracting authority & participating public bodies

The Police and Crime Commissioner for Leicestershire

Contracting authorityPublic authority - sub-central government GB-PPON: PXJR-8257-MYGR St Johns, Leicester, East Midlands, LE19 2BXContact email

Official documents & specifications (2)

Official links; attachments are not copied

Notices published for this procedure

  • Procurement termination notice tenderProcurement termination noticeUK12Procurement termination notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender