Repair and maintenance services of building installations: UK Tenders, Buyers & Competition
CPV 50700000·Services · class·in Repair & Maintenance
i
Tenders you can still bid for.
Notices at tender stage whose deadline has not passed, counted the way the search counts them: a notice shows under every code and region it names.
i
Notices published in the last 12 months.
Counted per tender, not per lot, against the 12 months before where shown.
i
How many companies usually bid for a lot here.
The middle value of the bid counts that award notices publish, one per lot. Only real competitions count: direct awards and framework places are left out.
Based on 88 lots from 63 competitions run by 56 buyers, last 36 months. A buyer with many similar contests counts only up to a limit. 48 lots are from Procurement Act 2023 notices (bids assessed, middle 4.5) and 40 from older notices (bids received, middle 6.5).
i
What a contract here is usually worth.
Middle value of published award values, VAT excluded. Framework ceilings are left out because they are not real contract values.
Based on 219 awards with a usable value, last 36 months.
Published values, not actual spend.
i
How long buyers here take to decide after bids close.
Middle value in days from the bid deadline to the award date, on competitions that published both.
Based on 43 decided competitions, last 36 months.
Only decided tenders count, so slow ones still waiting are not in.
Newest open tenders
3 of 26 open for bids now · newest first
| Notice | Authority | Deadline | Days left | Published value |
|---|---|---|---|---|
| Three Year Contract for Gutter Cleaning and Roof Inspection Services | Reidvale Housing Association | 19 Nov 2026 | 22d | £250,000 |
| QW Planned and Reactive Facilities Management Services | Qualifications Wales | 30 Nov 2026 | 33d | £133,333 |
| HBBC-1713 Testing, Servicing, Repairs and Maintenance of Renewable installations for Hinckley and Bosworth Borough Council | Hinckley and Bosworth Borough Council | 30 Oct 2026 | 2d | £220,000 |
Codes and neighbouring classes
The 8-digit CPV codes notices in this class actually use, and the other classes of the same division
50700000 Repair and maintenance services of building installations471 notices · 78%- Repair and maintenance services of medical and surgical equipment 541 · 12m
- Repair and maintenance services of motor vehicles and associated equipment 250 · 12m
- Repair and maintenance services of electrical and mechanical building installations 240 · 12m
- Repair and maintenance services of machinery 192 · 12m
- Lift-maintenance services 125 · 12m
- Repair and maintenance services of measuring, testing and checking apparatus 122 · 12m
- Repair, maintenance and associated services related to railways and other equipment 87 · 12m
- Repair, maintenance and associated services related to roads and other equipment 76 · 12m
- Repair and maintenance services of medical and precision equipment 69 · 12m
- Miscellaneous repair and maintenance services 68 · 12m
- All of Repair & Maintenance →
Who buysi
Which buyers publish the most notices here.
Buyers ranked by the number of notices, duplicate names merged.
i
Which buyers publish the most notices here.
Buyers ranked by the number of notices, duplicate names merged.
All notices carrying this code · official UK_CA_TYPE where published (NHS bodies are central government authorities), else derived from the authority name
i
What kinds of public bodies buy here.
Notices by the buyer’s type as published, otherwise by its name.
Local authorities30%(171 notices)
171 of 565 notices are Local authorities (30%).Central government20%(112 notices)
112 of 565 notices are Central government (20%).Other public bodies20%(112 notices)
112 of 565 notices are Other public bodies (20%).Education & universities10%(57 notices)
57 of 565 notices are Education & universities (10%).Housing associations9%(50 notices)
50 of 565 notices are Housing associations (9%).Not classified11%(63 notices)
63 of 565 notices are Not classified (11%).
| Contracting authority | Type | Notices | Last 12 months | Open now |
|---|---|---|---|---|
| Onward Group Limited | Other public bodies | 20 | 2 | 0 |
| Procurement for Housing | Other public bodies | 10 | 2 | 0 |
| Gloucestershire Health and Care NHS Foundation Trust | Central government | 8 | 8 | 0 |
| GLOUCESTERSHIRE HOSPITALS SUBSIDIARY COMPANY LIMITED | Central government | 7 | 7 | 0 |
| Woking Borough Council | Local authorities | 7 | 0 | 0 |
| Dundee City Council | Local authorities | 6 | 0 | 0 |
| Hastoe HA | Other public bodies | 6 | 4 | 0 |
| NORWICH CITY SERVICES LIMITED | Other public bodies | 6 | 2 | 0 |
| ACIVICO (DESIGN, CONSTRUCTION AND FACILITIES MANAGEMENT) LIMITED | Other public bodies | 5 | 1 | 0 |
| Leeds Teaching Hospitals NHS Trust | Central government | 5 | 1 | 0 |
361 distinct authorities in total · the ten most active shown.
Where the work is deliveredi
Where the work on these notices is delivered.
Delivery regions published on the notices. A notice with several regions counts in each.
Where the work is, not where the buyer is based.
i
Where the work on these notices is delivered.
Delivery regions published on the notices. A notice with several regions counts in each.
Where the work is, not where the buyer is based.
Delivery regions (ITL1) published on 472 of 604 notices · a notice covering several regions counts in each · competition columns: contracts awarded in the last 36 months, lots delivered in the region
| Region | Notices | Bids / lot | SME wins | Local wins |
|---|---|---|---|---|
| Scotland | 8 | 85% | 93% | |
| North West England | 8 | 79% | 52% | |
| Greater London | 5 | 61% | 23% | |
| South East England | 2 | 65% | 28% | |
| South West England | 4 | 84% | 44% | |
| East of England | 6 | 53% | 30% | |
| Yorkshire and the Humber | 5 | 72% | 26% | |
| West Midlands | 4 | 53% | 7% | |
| North East England | 4 | 71% | 21% | |
| East Midlands | 4 | 87% | 22% | |
| Wales (Cymru) | — | — | — | |
| Northern Ireland | — | — | — |
Local wins = the winner’s registered region is the delivery region. Dashes: fewer than ten observations.
How it is boughti
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Commercial tool, procedure route and threshold as published on the notice, not a legal-regime claim
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Contract82%(495 notices)
495 of 604 notices are Contract (82%).Framework16%(95 notices)
95 of 604 notices are Framework (16%).Dynamic purchasing system2%(14 notices)
14 of 604 notices are Dynamic purchasing system (2%).
i
Which procedures buyers here use.
Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.
Open46%(278 notices)
278 of 604 notices are Open (46%).Route not published20%(121 notices)
121 of 604 notices are Route not published (20%).Direct award16%(97 notices)
97 of 604 notices are Direct award (16%).Selective11%(67 notices)
67 of 604 notices are Selective (11%).Limited / restricted7%(41 notices)
41 of 604 notices are Limited / restricted (7%).
i
How much of this market is above the legal threshold.
Notices by whether the buyer marked them above or below the threshold that triggers the full rules.
Above threshold72%(110 notices)
110 of 152 notices are Above threshold (72%).Below threshold28%(42 notices)
42 of 152 notices are Below threshold (28%).
i
How long bidders get to respond.
Middle value in days from the tender notice to its deadline.
Competition
Contracts published in the last 36 months (293) · bid counts per lot from award notices · values are net contract awards, framework and DPS ceilings excluded · SME and local status as declared
i
How many bids past lots received.
Each colour is a bid-count range. Only competed lots with a published count are included.
Past bids do not predict this tender.
1 bid14%(12)
12 of 88 lots fall in 1 bid (14%).2–320%(18)
18 of 88 lots fall in 2–3 (20%).4–622%(19)
19 of 88 lots fall in 4–6 (22%).7 or more44%(39)
39 of 88 lots fall in 7 or more (44%).
i
The usual range of contract values here.
The middle half of published award values, VAT excluded, with the middle value marked. Framework ceilings are left out.
Published values, not actual spend.
i
How many companies usually bid for a lot here.
The middle value of the bid counts that award notices publish, one per lot. Only real competitions count: direct awards and framework places are left out.
Based on 88 lots from 63 competitions run by 56 buyers, last 36 months. A buyer with many similar contests counts only up to a limit. 48 lots are from Procurement Act 2023 notices (bids assessed, middle 4.5) and 40 from older notices (bids received, middle 6.5).
i
How much of this market is actually put out to competition.
Notices run as an open or selective procedure, out of all notices that say which procedure was used. Direct awards count as not competed.
149 of 279 notices that state a procedure, last 36 months. 14 more give no procedure and are left out.
i
What share of bids come from small and medium firms.
SME bids divided by all bids, on lots where the buyer published the split.
471 SME bids out of 546, on 88 lots where the buyer published the split.
i
What share of contracts go to small and medium firms.
Awards to a single supplier that declared its size. SME divided by all.
105 of 159 awards where the winner declared its size.
i
How much work here goes to companies based in the region.
Contract awards where the winner’s registered address is in this region, out of awards where the address is known.
Registered address, so a national firm with a local branch counts as outside.
i
Do winners come in above or below the buyer’s estimate.
For each lot we compare the published estimate with the award, like for like. Below means the winner was paid less than estimated, above means more.
Based on 52 lots with both an estimate and an award, last 36 months.
A past pattern, not a price to bid.
i
How often a tender ends with no award.
Notices cancelled, withdrawn or marked unsuccessful, plus terminated ones that never got an award.
13 of 293 notices, last 36 months.
Only what buyers published. Tenders that quietly went nowhere are not counted.
i
How many companies apply to get onto a framework or DPS here.
Middle value per lot, frameworks and dynamic markets only. Getting onto a panel is not the same as winning work, so it is kept separate.
Based on 99 lots from 28 framework and DPS notices, last 36 months.
Who winsi
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
i
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
Ranked by distinct procedures won on notices carrying this code, then award records · 476 awards to 340 suppliers · the five most frequent winners hold 10% of contract awards in the last 36 months
| Supplier | Procedures | Awards | Last 12 months | Buyers |
|---|---|---|---|---|
| SCHNEIDER ELECTRIC LIMITED | 7 | 7 | 4 | 6 |
| C & M Servicing Ltd T/A Charterhouse Property Solutions | 5 | 5 | 2 | 1 |
| Graham Asset Management Ltd | 4 | 5 | 3 | 4 |
| Mears Limited | 4 | 4 | 2 | 4 |
| Derek McNulty Joinery & Building Contractors | 3 | 4 | 2 | 1 |
| City Technical Services UK Ltd | 3 | 3 | 0 | 3 |
| Honeywell Control Systems Limited | 3 | 3 | 2 | 3 |
| STATIC SYSTEMS GROUP LTD | 3 | 3 | 3 | 3 |
Where to submiti
Where bids for this work are submitted.
Notices by the portal in their submission link, where one is published.
i
Where bids for this work are submitted.
Notices by the portal in their submission link, where one is published.
E-sourcing portals named in the submission address · 239 of 604 notices name one · each portal page explains registration
Open tenders in repair and maintenance services of…
26 open for bids now · soonest deadline first
| Notice | Authority | Deadline | Days left | Published value |
|---|---|---|---|---|
| HBBC-1713 Testing, Servicing, Repairs and Maintenance of Renewable installations for Hinckley and Bosworth Borough Council | Hinckley and Bosworth Borough Council | 30 Oct 2026 | 2d | £220,000 |
| Three Year Contract for Gutter Cleaning and Roof Inspection Services | Reidvale Housing Association | 19 Nov 2026 | 22d | £250,000 |
| QW Planned and Reactive Facilities Management Services | Qualifications Wales | 30 Nov 2026 | 33d | £133,333 |
| YPO - 000882 FM Services - Internal Fit-out and Maintenance | YPO | 23 Feb 2029 | 849d | £500,000,000 ceiling |
| Repairs and Maintenance Services | Procurement Assist Limited c/o Integrated Facilities Management Bolton Ltd (iFM Bolton) | 31 May 2029 | 946d | £100,000,000 ceiling |
| Estates Works and Capital Projects Dynamic Market | The Bolton Impact Trust | 9 Mar 2031 | 1,593d | — |
| Responsive Repairs and Voids Sub Contractors | First Choice Homes Oldham | 31 Aug 2032 | 2,134d | £28,200,000 ceiling |
About this data
- Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
- What counts here. Every notice with a CPV code starting 5070. A notice with several codes counts in each sector it names. Notices from 2021 to 23 Oct 2026.
- Competition. Bids and winners cover the last three years and count each lot as its own contest; frameworks and dynamic purchasing systems are shown apart from ordinary contracts.
- Why no total spend. Notice estimates often repeat a framework’s ceiling, so adding them up would overstate the market. Typical contract values are shown instead.
- Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.