Official UK procurement notice
Horizon Technology, Services and Support Agreement
Authority: Post Office Limited (Public body)·Consortium: 2 public authorities
Provision of professional services to support electronic disclosure management services, including the collection, processing and analysing of electronic data. The continuing provision by FSL of the HNG-X Services and Development Services, together with the provision of contractual exit and transfer services in accordance with an agreed Exit Plan. The modification establishes the responsibilities, milestones, dependencies and governance required to transfer operational responsibility to Post Office's replacement supplier and to preserve continuity and operational stability during the transition.
What is being bought
Published requirement descriptionProvision of professional services to support electronic disclosure management services, including the collection, processing and analysing of electronic data.
CPV: IT services: consulting, software development, Internet and support
The lotProcurement structure
single lot · no lot value publishedLot #1The continuing provision by FSL of the HNG-X Services and Development Services,…Awarded
The continuing provision by FSL of the HNG-X Services and Development Services, together with the provision of contractual exit and transfer services in accordance with an agreed Exit Plan.
The modification establishes the responsibilities, milestones, dependencies and governance required to transfer operational responsibility to Post Office's replacement supplier and to preserve continuity and operational stability during the transition.
- Continuation of live HNG-X Services and Development Services
- Incorporation of the agreed Fujitsu Services Exit Plan
- Provision of Transfer Services, including knowledge transfer and the transfer of identified software, licences, documents, materials, assets and rights required for the replacement services.
- Data-preservation obligations concerning materials held at the Belfast Data Centre.
- Provision for decommissioning services.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
- Price
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| Fujitsu Services Ltd | £42,500,000 † | — | Awarded |
| Fujitsu Services Ltd | £2,438,000,000 †very large published value · not counted until verified, check the noticesame award published again · counted once | — | Awarded |
| Fujitsu Services Ltd | £42,500,000 † | — | Awarded |
| Fujitsu Services Ltd | £2,322,500,000 †very large published value · not counted until verified, check the noticesame award published again · counted once | — | Awarded |
| Fujitsu Services Ltd | £2,339,000,000 †very large published value · not counted until verified, check the noticesame award published again · counted once | — | Awarded |
| KPMG | £12,000,000 † | — | Awarded |
| Fujitsu Services Ltd | £2,375,000,000 †very large published value · not counted until verified, check the notice | — | Awarded |
| Fujitsu Services Ltd | £2,479,000,000 †very large published value · not counted until verified, check the noticesame award published again · counted once | — | Awarded |
| Fujitsu Services Ltd | £2,363,800,000 †very large published value · not counted until verified, check the notice | — | Awarded |
Contracts
Contract 106766-2026-C100147-1 · Fujitsu Services Ltd
- Signed
- 5 Nov 2026
- Value
- £2,363,800,000
- Period
- 1 Apr 2027 – 30 Nov 2027
- Status
- active
- Change The modification extends the delivery of the HNG-X Services and Development Services beyond 31 March 2027 and contractually incorporates the agreed Exit Plan, establishes transfer services and additional exit governance, enables the transfer of identified assets, software, licences, documents, materials and rights, provides for data-preservation obligations, and establishes an orderly decommissioning period after cutover., Need for additional works, services or supplies by the original contractor/concessionaire: Post Office requires FSL, as the incumbent contractor and developer/operator of the highly complex HNG-X legacy platform, to continue providing the live HNG-X and Development Services until the agreed Cutover Date and to perform the exit, transfer and decommissioning activities necessary to move operational responsibility safely to Post Office's replacement supplier. A change of contractor for these additional services cannot be made for technical and economic reasons. The activities are inseparable from FSL's existing operational knowledge, proprietary systems, tooling, software, assets, access arrangements and responsibilities under the Horizon Agreement and the agreed Exit Plan. Introducing a different contractor for this short, safety-critical transition period would create disproportionate technical and operational risk, duplicate transition and mobilisation activity, fragment accountability and increase the risk of disruption to live branch services. HNG-X is a highly complex, ageing and heavily integrated legacy platform supporting financial services, banking, government services, mails and retail transactions. FSL holds material system knowledge and continues to operate and maintain the service. The exit and transfer work depends on FSL providing access, knowledge, assets, software, licences, records and other materials while maintaining live service. These obligations cannot practicably be separated from the incumbent services without creating unacceptable implementation, operational and service-continuity risk. A further contractor change before the planned transfer to the replacement supplier would require an additional mobilisation and knowledge transfer for a time-limited interim period, duplicate governance, transition, access, assurance and decommissioning costs, and create dual-running and coordination overhead. It would also fragment responsibility between FSL, an interim contractor and the replacement supplier, creating substantial inconvenience and avoidable cost while increasing the risk to continuity of Post Office's branch services. The modification is limited to the period and services required to maintain live operations, complete the agreed transfer and safely decommission FSL's services. It does not appoint FSL to operate the replacement service beyond the controlled exit period.
Contract 073336-2025-C100147-1 · Fujitsu Services Ltd
- Signed
- 4 Nov 2025
- Value
- £2,479,000,000
- Period
- … – 30 Nov 2027
- Status
- active
- Change A one year extension of all Services from the 1st April 2026 to the 31st March 2027. Other than the extension of the term of the agreement, all other terms and conditions shall remain the same with the exception of FSL obligations in respect of: End of Service Life (EOSL) components, improved Governance for better management, Removal of Redundant Clauses and Schedules, maintenance of software that resides on HNG-X system, licenses required, updated contractors used by FSL and replacement of the current Fujitsu Services WAN, from the date of the execution of the modification; and Additional upgrades to address legacy End of Service Life components is estimated at £3,000,000 is also included in the modification value. NB: Any investment will be subject to POL agreeing suitable work orders with FSL., Need for additional works, services or supplies by the original contractor/concessionaire: This notice relates to the modification of an existing contract under regulation 72(1)(b) of the Public Contracts Regulations 2015 ("PCR"). Post Office Limited ("POL") requires a 12-month extension to its contract with Fujitsu Services Limited ("FSL") for the provision of its core trading platform Horizon (the "Contract"), from 01 April 2026 to 31 March 2027. The modification has become necessary because POL is in the process of procuring a replacement service provider ("Replacement Provider") to manage Horizon (the "Procurement") and that procurement activity and the mobilisation of the Replacement Provider will not be complete by 31 March 2026 when the Contract expires by effluxion of time. POL commenced the Procurement in the summer of 2025 and has been conducting the procedure at pace. POL expects that the Procurement will conclude and a new contract with the Replacement Provider put in place in Summer 2026 with transition activity commencing upon execution. It is necessary, therefore, to extend the Contract by 12 months to 31 March 2027. It would not have been possible for POL to have competed the opportunity to support Horizon during this period as any alternative tendered solution would not have been mobilised and transitioned to prior to 31st March 2026. A change of contractor cannot be made for technical reasons. The existing Horizon system is a highly complex legacy platform, written in outdated versions of software languages, and incorporates five 'systems' in one (i.e., financial services, banking, government services, mails, and retail). Horizon is an aging platform and has an inflexible monolithic architecture that makes technology change difficult. It would not be possible to simply hand this system over to another supplier. A change of contractor would result in disproportionate technical difficulties in implementation as well as operation and maintenance. Furthermore, while there are other similar systems to Horizon available on the market, there are no alternative systems that currently meet all of Post Office's business needs without significant development or customisation. It would not, therefore, be technically possible to mobilise a replacement system before 31 March 2026. On that basis, there are technical reasons why a change of contractor cannot be made. Changing contractor would cause significant inconvenience and duplication of costs. It would cause service disruption, cause significant data migration issues, require substantial business change at short notice, threaten continuity of service and create risk in the transfer of know-how. Furthermore, changing contractor would result in sunk costs, including an increase in run costs, dual running costs, and additional exit/transition costs. The modification is less than 50% of the original contract value. The Horizon support agreement was originally valued at approximately £846,700,000. The maximum value of the extension, if all options are called on during its term is approximately £41,000,000. The increase is, therefore, approximately 4.8% of the original contract value. In summary, a change of contractor cannot be made for technical or economic reasons and would cause substantial inconvenience and duplication of costs for the Post Office. The value of the extension is substantially less than 50% of the original contract value. Accordingly, Post Office is satisfied that the modification can be made under regulation 72(1)(b) of the PCR.
Contract 009521-2025-C100147-1 · Fujitsu Services Ltd
- Signed
- 29 Nov 2024
- Value
- £2,438,000,000
- Period
- … – 30 Nov 2027
- Status
- active
- Change A one year extension of all Services from the 1st April 2025 to the 31st March 2026. Other than the extension of the term of the agreement, all other terms and conditions shall remain the same with the exception of the removal of FSL obligations in respect of: Court Support Services, Litigation Support and prosecution support from both the Clauses and the Security Management Service: Service Description as well as Schedule A4 from the date of the execution of the modification; and Delivery of the Payment and Banking Service from 31st March 2025 or such earlier date as agreed between the Parties. Additional upgrades to address legacy technical debt issues estimated at £21,000,000 is also included in the modification value. NB: Any investment will be subject to POL agreeing suitable work orders with FSL., Need for additional works, services or supplies by the original contractor/concessionaire: This notice relates to the modification of an existing contract under regulation 72(1)(b) of the Public Contracts Regulations 2015 ("PCR"). The modification has become necessary because delays to Post Office Limited's ("POL") New Branch IT ("NBIT") project meant that it would not be possible to transition from its legacy system, Horizon - provided by Fujitsu Services Limited ("FSL"), to the new NBIT system before POL's contract with FSL expires by effluxion of time on 31st March 2025. By the time significant delays to the NBIT project had become apparent in October 2023, any alternative tendered solution to replace Horizon would not have been mobilised and transitioned to prior to 31st March 2025. It was, therefore, necessary to extend POL's contract with FSL for ongoing support of the Horizon system. A change of contractor cannot be made for technical reasons. The existing Horizon system is a highly complex legacy platform, written in outdated versions of software languages, and incorporates five 'systems' in one (i.e., financial services, banking, government services, mails, and retail). "Horizon" is an aging platform and has an inflexible monolithic architecture that makes technology change difficult. It would not be possible to simply hand this system over to another supplier. A change of contractor would result in disproportionate technical difficulties in implementation as well as operation and maintenance. Furthermore, while there are other similar systems to Horizon available on the market, there are no alternative systems that currently meet all of Post Office's business needs without significant development or customisation. It would not, therefore, be technically possible to mobilise a replacement system before 31 March 2025. On that basis, there are technical reasons why a change of contractor cannot be made. Changing contractor would cause significant inconvenience and duplication of costs. It would cause service disruption, cause significant data migration issues, require substantial business change at short notice, threaten continuity of service and create risk in the transfer of know-how. Furthermore, changing contractor would result in sunk costs, including an increase in run costs, dual running costs, and additional exit/transition costs. The modification is less than 50% of the original contract value. The Horizon support agreement was originally valued at approximately £846,700,000. The maximum value of the extension, if all options are called on during its term is approximately £63,000,000. The increase is, therefore, approximately 7.4% of the original contract value. In summary, a change of contractor cannot be made for technical or economic reasons and would cause substantial inconvenience and duplication of costs for the Post Office. The value of the extension is substantially less than 50% of the original contract value. Accordingly, Post Office is satisfied that the modification can be made under regulation 72(1)(b) of the PCR.
Contract 032026-2024-1 · KPMG
- Signed
- 1 Aug 2024
- Value
- £12,000,000
- Period
- … – 30 Nov 2027
- Status
- active
Contract 034447-2023-N/A-1 · Fujitsu Services Ltd
- Signed
- 3 Nov 2023
- Value
- £2,375,000,000
- Period
- 1 Apr 2024 – 31 Mar 2025
- Status
- active
- Change The following key amendments will be made to the Horizon Agreement. A 1 year extension of the Data Centre Operations and Central Network Services (including Test Infrastructure)., Need for additional works, services or supplies by the original contractor/concessionaire: This Notice relates to the modification of an existing contract that has been necessary due to the following reasons: The existing Horizon System is a highly complex platform, written in legacy versions of software languages and which incorporates five "systems" in one i.e. financial services, banking, government services, mails and retail. As an aging platform, the inflexible nature of the construction of the architecture of "Horizon" itself makes technology change challenging. Accordingly, the Program to transfer the services to the Cloud encountered fundamental technical challenges that Post Office could not economically and technically overcome, and the business has taken the decision to pivot back to the existing Data Centres until the successful transfer of services out of Horizon and into its replacement NBIT ("New Branch IT"). The Data Centre Operations and Central Network Services cannot be transferred away from the original contractor in the short term because of the specific interoperability requirements, compounded by the highly complex nature of the existing infrastructure and the Post Office's business model and operating procedures. A change of contractor would result in disproportionate technical difficulties in implementation as well as operation and maintenance at this time. Awarding the services to a different contractor would also cause significant inconvenience in terms of service delivery, reliability and continuity of service including because of incomplete transfer of know-how. Therefore, Post Office has modified the contract in accordance with Regulation 72 (1) (b) of the Public Contracts Regulations 2015. The increase in price as a result of the modified contract is less than 50% of the original contract value. The Data Centre Operations and Central Network Services have thereby been extended for an additional period of 1 year from the 1st April 2024.
Contract 010251-2023-N/A-1 · Fujitsu Services Ltd
- Signed
- 1 Apr 2023
- Value
- £2,339,000,000
- Period
- … – 30 Nov 2027
- Status
- active
- Change The following key amendments will be made to the Horizon Agreement. A 1 year extension of the Data Centre Operations and Central Network Services., Need for additional works, services or supplies by the original contractor/concessionaire: This Notice relates to the modification of an existing contract that has been necessary due to the following reasons: The existing Horizon System is a highly complex platform, written in legacy versions of software languages and which incorporates five "systems" in one i.e. financial services, banking, government services, mails and retail. "Horizon" itself is an aging platform constructed on an inflexible monolithic architecture that makes technology change difficult. Accordingly, the Program to transfer the services to the Cloud encountered fundamental technical challenges that Post Office could not economically and technically overcome, and the business has taken the decision to pivot back to the existing Data Centres until the successful transfer of services out of Horizon and into its replacement NBIT ("New Branch IT"). The Data Centre Operations and Central Network Services cannot be transferred away from the original contractor in the short term because of the specific interoperability requirements, compounded by the highly complex nature of the existing infrastructure and the Post Office's business model and operating procedures. A change of contractor would result in disproportionate technical difficulties in implementation as well as operation and maintenance at this time. Awarding the services to a different contractor would also cause significant inconvenience in terms of service delivery, reliability and continuity of service including because of incomplete transfer of know-how. Therefore, Post Office has modified the contract in accordance with Regulation 72 (1) (b) of the Public Contracts Regulations 2015. The increase in price as a result of the modified contract is less than 50% of the original contract value. The Data Centre Operations and Central Network Services have thereby been extended for an additional period of 1 year from the 1st April 2023.
Contract 009752-2021-1 · Fujitsu Services Ltd
- Signed
- 30 Apr 2021
- Value
- £42,500,000
- Period
- … – 30 Nov 2027
- Status
- active
Contract 009753-2021-N/A-1 · Fujitsu Services Ltd
- Signed
- 30 Apr 2021
- Value
- £2,322,500,000
- Period
- … – 30 Nov 2027
- Status
- active
- Change The following key amendments will be made to the Horizon Agreement: Extension period: Additional period of up to twenty-four months post-31st March 2023 to assist transition of services as per description below. Services during the extension period: o In line with the development and modernisation of the HNG-X system, on-premises hosting and data centre operations services and central network services will not be extended and will expire on 31 March 2023 (to be replaced by a separately procured cloud hosting solution). It is anticipated that Post Office will exercise its existing rights in the Horizon Agreement to terminate these services prior to that date and that amendments will need to be made to the ongoing operational services to reflect this change. o Certain digital development services and Post Office's obligation to purchase the services of a standing team of IT developers will also expire on 31 March 2023. Financial matters: Certain financial matters, and in particular relating to charges, financial savings and spend commitments, will be amended to reflect the above changes in the scope of service. Arrangements for exit: o A process will be added to facilitate access to specified Fujitsu intellectual property so as to assist the Post Office on its development and modernisation of the HNG-X system and exit from the Horizon Agreement. o A structured process will be added for addressing the replacement of end of life hardware and software components. o As part of the transitional support, Post Office has requested that Fujitsu Services provides certain termination services and cooperation to facilitate the orderly transfer of responsibility to a new supplier(s)., Need for additional works, services or supplies by the original contractor/concessionaire: This notice relates to the modification of an existing contract that has been necessary due to the following reasons. The existing Horizon system is a highly complex, legacy platform, written in outdated versions of software languages, and incorporates five 'systems' in one i.e. financial services, banking, government services, mails, and retail. "Horizon" is an aging platform, and has an inflexible monolithic architecture that makes technology change difficult. It was not designed for multi-channel digital operations. The services cannot for economic and technical reasons be provided by a contractor other than the original contractor before the expiry of the Horizon Agreement because of the specific interoperability requirements and the highly complex nature of the existing infrastructure and the Post Office's business model and operating procedures. A change of contractor would result in disproportionate technical difficulties in implementation as well as operation and maintenance. Awarding the contract to a different contractor would also cause significant inconvenience in terms of service delivery, reliability, and continuity of service, not least because of risk of incomplete transfer of know-how. Changing the original contractor would result in a number of sunk costs, including an increase in run costs, dual running costs, and additional exit/transition costs for a 2-year service term. There would also be significant service risk as a result of engaging in two transitions of service provider within the relatively short time period of 2-3 years whereas an extension with the original contractor would just require one such transition. In summary, a change of contractor cannot be made for technical or economic reasons and would cause substantial inconvenience and duplication of costs for the Post Office in accordance with Regulation 72(1)(b) of the Public Contracts Regulations 2015. The increase in price as a result of the modified contract is less than 50 % of the original contract value.
Contract 006992-2021-1 · Fujitsu Services Ltd
- Signed
- 6 Apr 2021
- Value
- £42,500,000
- Period
- … – 30 Nov 2027
- Status
- active
Bid statistics published by the authority
| Bids | SME | VCSE | Valid bid range |
|---|---|---|---|
| 1bids | — | — | — |
Procedure terms & legal framework
From the official record · publisher note attached- Procedure method
- Restricted procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Services
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 6 Apr 2021, 13:10 BST
- Last source update
- 10 Nov 2026, 15:15 GMT
- Authority reference
C100147- FTS notice number
2026/S 000-106766- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-02a2c1Find a Tender
- Why no open competition
The works, supplies or services can be provided only by a particular economic operator due to absence of competition for technical reasons; Additional deliveries by the original supplier ordered under the strict conditions stated in the directive
- Published justification
This Notice relates to the modification of an existing contract that has been necessary due to the following reasons.
The Authority's existing Horizon system is a highly complex, legacy platform, written in outdated versions of software languages, and incorporates five 'systems' in one i.e. financial services, banking, government services, mails, and retail. "Horizon" is an aging platform, has an inflexible monolithic architecture that makes technology change difficult. It was not designed for multi-channel digital operations. The services cannot for economic and technical reasons be provided by a contractor other than the original contractor before the expiry of the Horizon Agreement because of the specific interoperability requirements and the highly complex nature of the existing infrastructure and the Authority's business model and operating procedures. A change of contractor would result in disproportionate technical difficulties in implementation as well as operation and maintenance. Awarding the contract to a different contractor would also cause significant inconvenience in terms of service delivery, reliability, and continuity of service, not least because of risk of incomplete transfer of know-how. Changing the original contractor would result in a number of sunk costs, including an increase in run costs, dual running costs, and additional exit/transition costs for a 2-year service term. There would also be significant service risk as a result of engaging in two transitions of service provider within the relatively short time period of 2-3 years whereas an extension with the original contractor would just require one such transition.
In summary, a change of contractor cannot be made for technical or economic reasons and would cause substantial inconvenience and duplication of costs for the Authority in accordance with Regulation 72(1)(b) of the Public Contracts Regulations 2015. The increase in price as a result of the modified contract is less than 50 % of the original contract value.
Publisher note: NB: Technical issues with Find a Tender has delayed publication of this notice.
How it was run
Official notice- Submission deadline
- —
Timeline
10 Nov 2026 → 1 Apr 2027 · 2 dates- Notice published12h ago10 Nov 2026, 15:15 GMT
- Today11 Nov 2026
- Contract startsin 140 days1 Apr 2027, 00:00 BST
Notice history
3 events · 9 releases on Find a Tender · since 5 May 2021- Buyer details updated5 May 2021, 17:58 BST
- Buyer details updated6 Apr 2023, 16:39 BST
- Procurement method changed7 Oct 2024, 11:05 BST
Routine re-releases (9)
- 2024-10: 1 release · 7 Oct 2024
- 2023-11: 1 release · 21 Nov 2023
- 2023-04: 1 release · 6 Apr 2023
- 2021-05: 2 releases · 5 May 2021, 5 May 2021
- 2021-04: 1 release · 6 Apr 2021
Contracting authority & participating public bodies
2 public bodies on the noticeDispute resolution & review bodies
- Royal Courts of JusticeReview body
- Royal Courts of Justice, London, United KingdomReview body
Bidders & participating suppliers
6 commercial parties on the notice- Fujitsu Services LimitedAwarded supplier
- Fujitsu Services LimitedAwarded supplier
- Fujitsu Services LimitedAwarded supplier
- Fujitsu Services LimitedAwarded supplier
- Fujitsu Services LtdAwarded supplier
- KPMG LLPAwarded supplier