Inspection, testing and maintenance of Building Management System (BMS)
Authority: West London NHS Trust (Central government)
What is being bought
Published requirement descriptionThe works comprise of the inspection and maintenance of building management system, for all equipment in the Trust's asset register , in line with manufacturers’ recommendations, governing regulations and best practice guidance including but limited to the checklist identified in the specification.
CPV: Health and social work services
The lotProcurement structure
single lot · value publishedLot #1The requirements shall encourage the Contractor to provide a pro-active approach to…Published value£330,000
The requirements shall encourage the Contractor to provide a pro-active approach to preventative and reactive maintenance of the Trust building management systems.
The Contractor shall directly employ, on this Contract, only engineers fully trained, qualified (including but not limited to on TREND systems) and of sufficient breadth of experience to cope with the level of expertise which will be required in inspecting, monitoring, testing, servicing and maintaining units and systems of different design and manufacture.
The Contractor shall issue a pre-agreed work programme to the Contract Administrator and any alterations to these agreed dates should be made with the Contract Administrator or his nominated representative.
Two-operatives working shall be used where appropriate and necessary for the delivery of this contract. If contractor is advising one operative working when carrying out servicing, contractor shall provide generic minimum risk assessment and method statement for lone working.
The Contractor shall only provide directly employed operatives to execute the requirements of this contract and shall not sub-contract the Works nor use operatives provided by third parties, without the prior approval of the Contract Administrator.
The Contractor shall insure they are familiar with all items of assets highlighted in Attachment B below. Any additional training required to carry out the servicing and repair of the plant shall be covered at the contractors’ expense.
The Contractor is:
- To produce a risk assessment and method statement produced before the work commences. Personal protective equipment (PPE) may be required
- To produce defects reports and send to the Trust authorised officers within 1 working day from the time the issues are noticed.
The Contractor will be expected to include:
All service kits, consumable parts, cleaning chemicals and other necessary materials deemed necessary to meet the manufacturer’s service recommendations for each asset.
All technical and associated administrative actions intended to maintain the equipment and systems in a condition where they can perform their required function (including materials except where explicitly advised to report and obtain authorisation from to the Trust Authorised Officer to progress with repair)
The scope of works outlined in Attachment C should be undertaken as minimum requirements and where manufacturer’s instructions exceed the requirements in Attachment C, they shall be adhered to in their entirety.
It is the Contractors’ responsibility to observe the on-going condition of the equipment with regard to safe, correct operation and control. The Contractor shall bring to the attention of the Trust any specific areas where periodic checking, testing and adjustment exceeds or fail normal provisions for equipment of the age and type installed.
When the need for adjustment, repairs and replacement are identified during the course of maintenance inspections the Contractor shall undertake the necessary works in accordance with the requirements of this contract terms and specification.
All additional cost for remedial repairs, deemed to be outside the scope of works of this contract, must be brought to the attention of the Contract Administrator or his nominated representatives before being carried out.
Spares or replacement parts utilised on the contract for the control of building management system shall be of TREND make. Any deviation from this make shall be upon the authorisation of the Trust contract administrators.
The Contractor shall ensure that they source all materials at the most competitive rates currently available to ensure best value at all times. Utilised spares on the contract are to be charged at the declared mark-up rates from paid wholesale prices and installed utilising the agreed labour rates.
The Contractor shall be required to provide a 24 hour breakdown service, 365 days per annum.
The Call Out is to be covered as soon as possible and the operative attending must be on site within same day if call out request is logged same day AM, whilst attending next day AM if call out request is logged during PM.
The contractor may be required to respond and attend site within 4 hours for emergency callout request for full system failure or as determined by the Authority.
If the Authority is to proceed with pricing schedule option 3, option 4, option 5 or a combination the contractor nominated engineer is expecting to be in attendance on the agreed day/s in line with the working hours stipulated in section 1.2.15 for 52 weeks per annum.
The contract shall make the necessary arrangement for alternative cover during their nominated engineer planned or unplanned absences / leave.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published sub-criteria (3)
- Quality: 40
- Price: 60
- price: 60
Published award criteria (3)
- Quality: 40
- Price: 60
- Price: 60
- Price carries 120 of 160 points: a 10% discount moves about 12 points. This one is won on the number: sharpen the price before polishing the prose.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record- Procedure method
- Restricted procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Services
- Notice status
- Closed
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- No (one-off requirement)
- First published
- 22 Nov 2021, 10:45 GMT
- Last source update
- 22 Nov 2021, 10:45 GMT
- Authority reference
DN583237- FTS notice number
2021/S 000-029012- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-02f8c3Find a Tender
- Electronic trading
- e-invoicing allowed · electronic ordering · electronic payment
How it was run
Official notice- Submission deadline
- 10 Jan 2022, 14:00 GMT
- Submission channel
- {"electronicSubmission"}
- Accepted languages
- en
Timeline
22 Nov 2021 → 4 Apr 2022 · 3 dates- Notice published22 Nov 2021, 10:45 GMT
- Submission deadline10 Jan 2022, 14:00 GMT
- Contract starts4 Apr 2022, 00:00 BST