Find a TenderAwarded
Published 24 Mar 2023, 17:58 GMT

Official UK procurement notice

Responsive Repairs Framework 2023

Official notice

Authority: THE UNIVERSITY OF WESTMINSTER (Education)·Consortium: 2 public authorities

Framework agreement10 lotsServicesOpen procedureSME suitableMax 9 lots per supplier
Framework ceiling (notional)£7,000,000total for 10 lots · framework ceiling, not attributable revenue
Submissions closed 24 Apr 2023awarded 30 May 2023
Lots 10max 9 won per supplier
Framework period 3 yrsends 31 May 2026 · starts 22 May 2023

What is being bought10 lots · detail below

Published requirement description

The University has established an internal framework of suitably experienced supplier/s to deliver responsive repairs across all University Campuses.

Historically, responsive repairs services have been procured on a project by project basis, either by direct appointment or on via a quotation or tender process, depending on the value of the individual project

This framework allows for full flexibility of supplier appointment throughout the contract duration. This includes:

  • Direct award to any successful supplier on the relevant lot,
  • Further Competition or Quotation process involving all suppliers on the lot,
  • Further Competition or Quotation involving a selection of suppliers on the lot.

Lots:

Lot 1 Heating and Plumbing

Lot 2 Electrical

Lot 3 General Repairs

Lot 4 Decoration

Lot 5 Asbestos Removal

Lot 6 Asbestos Surveys

Lot 7 Doors

Lot 8 Windows/Blinds

Lot 9 Ventilation

Lot 10 Flooring

CPV: Repair and maintenance services

How this framework works

From the published notice
Places
up to 25 suppliers · 53 bids received (2.1 per place) · 34 appointed (full)
Framework period
3 yrs from 22 May 2023

Lots and requirements (10)Procurement structure

10 lots · all with a published value · win at most 9 of them

Every one of these 3 lots carries the same published figure, £400,000: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.

Lot #1Heating and PlumbingCancelled 3 yrsceiling above

The University has establish an internal framework of suitably experienced supplier/s to deliver responsive repairs across all University Campuses.

Historically, responsive repairs services have been procured on a project by project basis, either by direct appointment or on via a quotation or tender process, depending on the value of the individual project

The framework allows for full flexibility of supplier appointment throughout the contract duration. This includes:

  • Direct award to any successful supplier on the relevant lot,
  • Further Competition or Quotation process involving all suppliers on the lot,
  • Further Competition or Quotation involving a selection of suppliers on the lot.

Lots:

Lot 1 Heating and Plumbing

Lot 2 Electrical

Lot 3 General Repairs

Lot 4 Decoration

Lot 5 Asbestos Removal

Lot 6 Asbestos Surveys

Lot 7 Doors

Lot 8 Windows/Blinds

Lot 9 Ventilation

Lot 10 Flooring

Contract period: 22 May 2023 – 31 May 2026 (3 yrs)
Delivery: London
Variant bids: not allowed
Lot #2ElectricalCancelled 3 yrsPublished value£1,000,000

The University has establish an internal framework of suitably experienced supplier/s to deliver responsive repairs across all University Campuses.

Historically, responsive repairs services have been procured on a project by project basis, either by direct appointment or on via a quotation or tender process, depending on the value of the individual project

The framework allows for full flexibility of supplier appointment throughout the contract duration. This includes:

  • Direct award to any successful supplier on the relevant lot,
  • Further Competition or Quotation process involving all suppliers on the lot,
  • Further Competition or Quotation involving a selection of suppliers on the lot.

Lots:

Lot 1 Heating and Plumbing

Lot 2 Electrical

Lot 3 General Repairs

Lot 4 Decoration

Lot 5 Asbestos Removal

Lot 6 Asbestos Surveys

Lot 7 Doors

Lot 8 Windows/Blinds

Lot 9 Ventilation

Lot 10 Flooring

Contract period: 22 May 2023 – 31 May 2026 (3 yrs)
Delivery: London
Variant bids: not allowed
Lot #3General RepairsCancelled 3 yrsPublished value£1,000,000

The University has establish an internal framework of suitably experienced supplier/s to deliver responsive repairs across all University Campuses.

Historically, responsive repairs services have been procured on a project by project basis, either by direct appointment or on via a quotation or tender process, depending on the value of the individual project

The framework allows for full flexibility of supplier appointment throughout the contract duration. This includes:

  • Direct award to any successful supplier on the relevant lot,
  • Further Competition or Quotation process involving all suppliers on the lot,
  • Further Competition or Quotation involving a selection of suppliers on the lot.

Lots:

Lot 1 Heating and Plumbing

Lot 2 Electrical

Lot 3 General Repairs

Lot 4 Decoration

Lot 5 Asbestos Removal

Lot 6 Asbestos Surveys

Lot 7 Doors

Lot 8 Windows/Blinds

Lot 9 Ventilation

Lot 10 Flooring

Contract period: 22 May 2023 – 31 May 2026 (3 yrs)
Delivery: London
Variant bids: not allowed
Lot #4DecorationCancelled 3 yrsPublished value£1,200,000

The University has establish an internal framework of suitably experienced supplier/s to deliver responsive repairs across all University Campuses.

Historically, responsive repairs services have been procured on a project by project basis, either by direct appointment or on via a quotation or tender process, depending on the value of the individual project

The framework allows for full flexibility of supplier appointment throughout the contract duration. This includes:

  • Direct award to any successful supplier on the relevant lot,
  • Further Competition or Quotation process involving all suppliers on the lot,
  • Further Competition or Quotation involving a selection of suppliers on the lot.

Lots:

Lot 1 Heating and Plumbing

Lot 2 Electrical

Lot 3 General Repairs

Lot 4 Decoration

Lot 5 Asbestos Removal

Lot 6 Asbestos Surveys

Lot 7 Doors

Lot 8 Windows/Blinds

Lot 9 Ventilation

Lot 10 Flooring

Contract period: 22 May 2023 – 31 May 2026 (3 yrs)
Delivery: London
Variant bids: not allowed
Lot #5Asbestos RemovalCancelled 3 yrsPublished value£200,000

The University has establish an internal framework of suitably experienced supplier/s to deliver responsive repairs across all University Campuses.

Historically, responsive repairs services have been procured on a project by project basis, either by direct appointment or on via a quotation or tender process, depending on the value of the individual project

The framework allows for full flexibility of supplier appointment throughout the contract duration. This includes:

  • Direct award to any successful supplier on the relevant lot,
  • Further Competition or Quotation process involving all suppliers on the lot,
  • Further Competition or Quotation involving a selection of suppliers on the lot.

Lots:

Lot 1 Heating and Plumbing

Lot 2 Electrical

Lot 3 General Repairs

Lot 4 Decoration

Lot 5 Asbestos Removal

Lot 6 Asbestos Surveys

Lot 7 Doors

Lot 8 Windows/Blinds

Lot 9 Ventilation

Lot 10 Flooring

Contract period: 22 May 2023 – 31 May 2026 (3 yrs)
Delivery: London
Variant bids: not allowed
Lot #6Asbestos SurveysCancelled 3 yrsPublished value£200,000

The University has establish an internal framework of suitably experienced supplier/s to deliver responsive repairs across all University Campuses.

Historically, responsive repairs services have been procured on a project by project basis, either by direct appointment or on via a quotation or tender process, depending on the value of the individual project

The framework allows for full flexibility of supplier appointment throughout the contract duration. This includes:

  • Direct award to any successful supplier on the relevant lot,
  • Further Competition or Quotation process involving all suppliers on the lot,
  • Further Competition or Quotation involving a selection of suppliers on the lot.

Lots:

Lot 1 Heating and Plumbing

Lot 2 Electrical

Lot 3 General Repairs

Lot 4 Decoration

Lot 5 Asbestos Removal

Lot 6 Asbestos Surveys

Lot 7 Doors

Lot 8 Windows/Blinds

Lot 9 Ventilation

Lot 10 Flooring

Contract period: 22 May 2023 – 31 May 2026 (3 yrs)
Delivery: London
Variant bids: not allowed
Lot #7DoorsCancelled 3 yrsPublished value£1,200,000

The University has establish an internal framework of suitably experienced supplier/s to deliver responsive repairs across all University Campuses.

Historically, responsive repairs services have been procured on a project by project basis, either by direct appointment or on via a quotation or tender process, depending on the value of the individual project

The framework allows for full flexibility of supplier appointment throughout the contract duration. This includes:

  • Direct award to any successful supplier on the relevant lot,
  • Further Competition or Quotation process involving all suppliers on the lot,
  • Further Competition or Quotation involving a selection of suppliers on the lot.

Lots:

Lot 1 Heating and Plumbing

Lot 2 Electrical

Lot 3 General Repairs

Lot 4 Decoration

Lot 5 Asbestos Removal

Lot 6 Asbestos Surveys

Lot 7 Doors

Lot 8 Windows/Blinds

Lot 9 Ventilation

Lot 10 Flooring

Contract period: 22 May 2023 – 31 May 2026 (3 yrs)
Delivery: London
Variant bids: not allowed
Lot #8Windows / BlindsCancelled 3 yrsceiling above

The University has establish an internal framework of suitably experienced supplier/s to deliver responsive repairs across all University Campuses.

Historically, responsive repairs services have been procured on a project by project basis, either by direct appointment or on via a quotation or tender process, depending on the value of the individual project

The framework allows for full flexibility of supplier appointment throughout the contract duration. This includes:

  • Direct award to any successful supplier on the relevant lot,
  • Further Competition or Quotation process involving all suppliers on the lot,
  • Further Competition or Quotation involving a selection of suppliers on the lot.

Lots:

Lot 1 Heating and Plumbing

Lot 2 Electrical

Lot 3 General Repairs

Lot 4 Decoration

Lot 5 Asbestos Removal

Lot 6 Asbestos Surveys

Lot 7 Doors

Lot 8 Windows/Blinds

Lot 9 Ventilation

Lot 10 Flooring

Contract period: 22 May 2023 – 31 May 2026 (3 yrs)
Delivery: London
Variant bids: not allowed
Lot #9VentilationCancelled 3 yrsceiling above

The University has establish an internal framework of suitably experienced supplier/s to deliver responsive repairs across all University Campuses.

Historically, responsive repairs services have been procured on a project by project basis, either by direct appointment or on via a quotation or tender process, depending on the value of the individual project

The framework allows for full flexibility of supplier appointment throughout the contract duration. This includes:

  • Direct award to any successful supplier on the relevant lot,
  • Further Competition or Quotation process involving all suppliers on the lot,
  • Further Competition or Quotation involving a selection of suppliers on the lot.

Lots:

Lot 1 Heating and Plumbing

Lot 2 Electrical

Lot 3 General Repairs

Lot 4 Decoration

Lot 5 Asbestos Removal

Lot 6 Asbestos Surveys

Lot 7 Doors

Lot 8 Windows/Blinds

Lot 9 Ventilation

Lot 10 Flooring

Contract period: 22 May 2023 – 31 May 2026 (3 yrs)
Delivery: London
Variant bids: not allowed
Lot #10FlooringCancelled 3 yrsPublished value£800,000

The University has establish an internal framework of suitably experienced supplier/s to deliver responsive repairs across all University Campuses.

Historically, responsive repairs services have been procured on a project by project basis, either by direct appointment or on via a quotation or tender process, depending on the value of the individual project

The framework allows for full flexibility of supplier appointment throughout the contract duration. This includes:

  • Direct award to any successful supplier on the relevant lot,
  • Further Competition or Quotation process involving all suppliers on the lot,
  • Further Competition or Quotation involving a selection of suppliers on the lot.

Lots:

Lot 1 Heating and Plumbing

Lot 2 Electrical

Lot 3 General Repairs

Lot 4 Decoration

Lot 5 Asbestos Removal

Lot 6 Asbestos Surveys

Lot 7 Doors

Lot 8 Windows/Blinds

Lot 9 Ventilation

Lot 10 Flooring

Contract period: 22 May 2023 – 31 May 2026 (3 yrs)
Delivery: London
Variant bids: not allowed

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored
Lot distribution rule: Lot Exclusions - In order to maintain independence of service, the University will not award any combination of the following lots to a single supplier:\n\n Lot 5: Asbestos Removal and Lot 6: Asbestos Surveys
What this means for your bid
  • “Responsive Repairs Framework 2023” is a framework: the contest is a place on its panel, up to 25 suppliers, not a single contract.

Procedure terms & legal framework

From the official record
Procedure method
Open procedure
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Services
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
No (one-off requirement)
First published
24 Mar 2023, 17:58 GMT
Last source update
23 Aug 2024, 09:45 BST
Award evaluation window
24 Apr 2023 – …
Authority reference
DN662671
FTS notice number
2024/S 000-026969
Classification (CPV)
Repair and maintenance services
Delivery area
London (UKI)
Official registry OCID
ocds-h6vhtk-03b616 Find a Tender

How it was run

Official notice
Run through: ProContract (Due North) · Who buys & how to bid on ProContract
Supplier login requiredLanguage: EN
Access & registration note: Free · short registration with manual review; public opportunity list
Appointment period ends
24 Apr 2023, 11:00 BST
Submission channel
{"electronicSubmission"}
Accepted languages
en
Supplier levy on call-offs (max %)
document
Bids opened
24 Apr 2023, 12:00 BST
Detailed submission instructions & authority contactsFrom official release

Timeline

24 Apr 2023 → 23 Aug 2024 · 4 dates
  1. Admission / appointment period endsperiod end, not a bid countdown
    24 Apr 2023, 11:00 BST
  2. Bids opened
    24 Apr 2023, 12:00 BST
  3. Contract starts
    22 May 2023, 00:00 BST
  4. Notice published
    23 Aug 2024, 09:45 BST

Notice history

2 events · 2 releases on Find a Tender · since 23 Aug 2024
  1. Status changed to complete
    23 Aug 2024, 09:45 BST
  2. Buyer details updated
    23 Aug 2024, 09:45 BST

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 34admitted to the panel · see the list ↓
Bids received 5345 from SMEs
Contracts signed 1latest 30 May 2023

1 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.

Contracts

  • Contract 026969-2024-1

    Signed
    30 May 2023
    Value
    —
    Status
    active

Bid statistics published by the authority

BidsSMEVCSEValid bid range
53bids · 53 electronic45—£1,000,000 – £7,000,000

Contracting authority & participating public bodies

2 public bodies on the notice

THE UNIVERSITY OF WESTMINSTER

Contracting authorityEducationBody governed by public lawEducation GB-COH: 00977818 309 Regent Street, LONDON, London, W1B2HWContact name, email, phone

Framework contractors & participating bidders

34 commercial parties on the notice
Show 24 more suppliers

Official documents & specifications (2)

Official links; attachments are not copied

Tender pack and attachments

  • Economic and financial selection criteriatenderEconomic and financial selection criteria
  • Technical selection criteriatenderTechnical selection criteria