Find a TenderClosed
Published 20 Jul 2021, 15:51 BST

Official UK procurement notice

Warden & Nurse Call Systems - Supply, Installation, Servicing & Maintenance - Portsmouth

Official notice

Authority: Portsmouth City Council (Local council)

Framework agreementWorksRestricted procedure
Published value£4,150,000published on the single lot · framework ceiling, not attributable revenue
Submissions closed 20 Aug 2021

What is being bought

Published requirement description

Portsmouth City Council (the 'Council') is inviting expressions of interest from suitably experienced contractors for the replacement of existing analogue residential Warden and Telecare Call systems installed within the Council's 34 sheltered housing properties with digital systems.

Following completion of the supply and installation works, the Council will also require ongoing servicing, maintenance, repair and spares provision on a rolling basis.

In order to ensure flexibility the Council will require that the new systems can operate on a full Open Protocol basis in terms of both hardware / software integration and ongoing servicing & maintenance.

Supply & installation works will be delivered on a phased basis made up of multiple sheltered housing blocks within each phase.

The first phase (Phase 1) comprising 8 blocks is targeted to commence on site in January 2022 with all subsequent phases to be completed as far in advance of the 2025 deadline after which the analogue telephone services which the current systems rely upon will be switched off as the UK's telecoms infrastructure is upgraded to digital connectivity.

In order to provide continuity and ideally realise economies of scale and programme efficiencies, the Council will seek to ideally work with one contractor to deliver the supply & installation works and ongoing servicing & maintenance requirements. However in order to provide contingency and options for programme acceleration of installations a multi-suppler framework made up of 3-4 contractors will be established.

The top ranked framework contractor will be the primary source for all supply & installation works and, unless there is an issue with performance, the sole provider in respect of ongoing servicing & maintenance of the entire system portfolio.

The estimated cost for delivery of Phase 1 is approx. £600k with the further 26 blocks equating to approx. £2.15M bringing the total approx. estimated value for supply & installation of new systems across all 34 blocks to approx. £2.75M. The estimated cost for delivery of on-going servicing & maintenance including for repairs and spares provision is estimated to be at maximum approx. £70k per annum.

Servicing & maintenance agreements will be let on a 5 year initial term which can be subsequently extended on a rolling basis in increments to be agreed of no less than 1 year and no more than 5 years in any one increment. It is anticipated that the new systems and equipment will have a 20 year operational life.

Award of the framework agreement and Phase 1 contract is targeted for November 2021. The framework agreement will run for a period of 4 years with an option to extend for a further 2 years in case there is any delay to the installation programme and / or change to the national analogue to digital switchover timescales.

The Council will run the procurement process in accordance with the 'Restricted' procedure as set out within the Public Contracts Regulations (2015) in line with the following programme:

  • FTS Notice & SSQ Stage Issue - Tuesday 20th July 2021
  • SSQ Return Date - Friday 20th August 2021 14:00
  • ITT published via Intend - Monday 6th September 2021
  • Site visits - W/C 13th September 2021
  • Tender Return Deadline - Friday 15th October 2021 14:00
  • Award notification and start of standstill period - Monday 1st November 2021
  • End of standstill period - Thursday 11th November 2021
  • Contract & Framework Award - Friday 12th November 2021
  • Phase 1 On-site Commencement - January 2022

Application is via completion and submission of a project specific Supplier Status Questionnaire (SSQ) by the deadline stated. The SSQ documentation is accessible via the Council's e-sourcing solution which will be used to administrate the procurement process and is accessible free of charge via the link below:

in-tendhost.co.uk/portsmouthcc/aspx/home/ ↗

CPV: Alarm system and antenna installation work · Communications equipment · Data-communications equipment · Data-transmission equipment · Digital transmission apparatus · Electrical apparatus for line telephony or line telegraphy · Electrical installation work · Engineering services · Installation services of communications equipment · Repair and maintenance services of electrical building installations · Telemetry and control equipment · Telephone network equipment

How this framework works

From the published notice
Places
up to 4 suppliers

The lotProcurement structure

single lot · value published
Lot #1INTRODUCTIONRenewalPublished value£4,150,000

INTRODUCTION

Portsmouth City Council (the 'Council') is inviting expressions of interest from suitably experienced contractors for the replacement of existing analogue residential Warden and Telecare Call systems installed within the Council's 34 sheltered housing properties with digital systems.

Following completion of the supply and installation works, the Council will also require ongoing servicing, maintenance, repair and spares provision on a rolling basis.

Supply & installation works will be delivered on a phased basis made up of multiple sheltered housing blocks within each phase in order to achieve effective contract management, equipment economies of scale leverage and programme efficiencies.

The first phase (Phase 1) comprising 8 blocks is targeted to commence on site in January 2022 with all subsequent phases to be completed as far in advance of the 2025 deadline after which the analogue telephone services which the current systems rely upon will be switched off as the UK's telecoms infrastructure is upgraded to digital connectivity.

SCOPE, REQUIREMENTS & SPECIFICATION SUMMARY

The Alarm Receiving Centre (ARC) which the current and replacement equipment will signals and alerts to is not subject to this procurement process. This is currently provided via a shared service agreement with Southampton City Council.

In order to ensure that the new systems are able to integrate with differing equipment hardware, ARC systems and can be effectively maintained & serviced by any number of contractors once installed the Council will require on mandated basis that applying contractors are able to supply & install systems and subsequently service & maintain on a full Open Protocol basis.

Warden call systems MUST meet the requirements of BS8521 Specification or equivalent for dual-tone multi-frequency (DTMF) signalling protocol for social alarm systems and Council performance specification. The contractor will be required to supply a turn-key service to include all management, builder's work, and design (where required) to include finishes and decoration as per the Council's performance specification.

All equipment must be the most up to date with both Warden Call and Telecare capability. The equipment must have both analogue and digital capability so that the equipment can operate with the existing analogue infrastructure and subsequently transfer to the future digital infrastructure without any further upgrading.

The contractor must be able to install the new system whilst the existing system remains operational throughout so there is no disruption to the safety of the residents. The contractor must have a maximum response time of 4 hours to carry out any repairs.

FRAMEWORK AGREEMENT RATIONALE & OVERVIEW

In order to provide continuity and ideally realise economies of scale plus programme efficiencies, the Council will seek to ideally work with one contractor to deliver the supply & installation works as well as the ongoing servicing & maintenance requirements. However in order to provide contingency and options for programme acceleration of installations a multi-suppler framework made up of 3-4 contractors will be established.

The top ranked framework contractor will be the primary source for all supply & installation works and, unless there is an issue with performance, the sole provider in respect of ongoing servicing & maintenance of the entire system portfolio.

The framework agreement will be established via the seeking of tenders for Phase 1 being the supply, installation and ongoing maintenance of a Warden Call System at Austin Court, Barkis House, Bresler House, John Marshall Court, Ladywood House, Pickwick House, Thorrowgood House, and Wyn Sutcliffe Court. The blocks listed represent a broad range of the Council's portfolio with some low rise blocks and high rise blocks up to 24 storeys.

The Phase 1 supply & installation works will be let on an individual basis to the contractor who achieves the highest score. That contractor plus the next ranking contractors up to a maximum total number of 3-4 will be appointed onto the framework agreement.

Subject to satisfactory performance of the supply & installation works the Phase 1 contractor will then be awarded the on-going servicing & maintenance contract and, again subject to ongoing performance, all further servicing & maintenance work for the further phases irrespective of whether supply & installation was undertaken by another framework contractor.

The additional next framework ranked contractors will generally only be called upon to deliver supply and installation works where the top ranked framework contractor does not have the capacity to undertake installation works to programme requirements, and / or where pricing cannot be agreed on an economic basis and / or where there has been issues with the top ranked framework contractors performance.

As stated above in respect of ongoing servicing & maintenance agreements the next ranked framework contractors would only be called upon to deliver these requirements where there is an unresolvable issue in regards of the performance of the top ranked framework contractor.

Call off contracts are likely to be let via ranked direct award in the majority of instances although the Council will retain the ability to let contracts via mini-competition procedure as well.

ESTIMATED CONTRACTS VALUES, DURATIONS & LEGAL TERMS

The estimated cost for delivery of Phase 1 is approx. £600k with the further 26 blocks equating to approx. £2.15M bringing the total approx. estimated value for supply & installation of new systems across all 34 blocks to approx. £2.75M. The estimated cost for delivery of on-going servicing & maintenance including for repairs and spares provision is estimated to be at maximum approx. £70k per annum.

The total estimated value of approx. £4.15M entered under Section II.2.6. below is based upon servicing & maintenance agreements running to a term of 20 years. Should t…

Delivery: South East · The Council's 34 sheltered housing blocks which will require the replacement of existing analogue residential Warden and Telecare Call systems together with ongoing servicing & maintenance are located within the City of Portsmouth and neighbouring boroughs of Havant and East Hampshire.
Extensions: See Section II.2.7. in respect of options for the extension of agreement durations and Section II.2.4. in respect of options for extension via direct award and / or in term variation of call off contracts. · framework agreement will run for a period of 4 years with an option to extend for a further 2 years in case there is any delay to the installation programme and / or change to the national analogue to digital switchover timescales. Phase 1 supply & installation works are targeted to commence on site in January 2022 with all subsequent phases of supply & installation works to be completed as far in advance of the 2025 deadline after which the analogue telephone services which the current systems rely upon will be switched off as the UK's telecoms infrastructure is upgraded to digital connectivity. The servicing & maintenance agreement will be let on a 5 year initial term which can be subsequently extended on a rolling basis in increments to be agreed of no less than 1 year and no more than 5 years in any one increment. It is anticipated that the new systems and equipment will have a 20 year operational life.Second stage: 3–4 candidates invited to tenderVariant bids: not allowed

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
What this means for your bid
  • “Warden & Nurse Call Systems - Supply, Installation, Servicing &…” is a framework: the contest is a place on its panel, up to 4 suppliers, not a single contract.

Procedure terms & legal framework

From the official record
Procedure method
Restricted procedure
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Works
Notice status
Closed
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
No (one-off requirement)
First published
20 Jul 2021, 15:51 BST
Last source update
20 Jul 2021, 15:51 BST
FTS notice number
2021/S 000-017097
Classification (CPV)
Alarm system and antenna installation workCommunications equipmentData-communications equipmentData-transmission equipmentDigital transmission apparatusElectrical apparatus for line telephony or line telegraphyElectrical installation workEngineering servicesInstallation services of communications equipmentRepair and maintenance services of electrical building installations
+2 moreTelemetry and control equipmentTelephone network equipment
Delivery area
South East (UKJ31)
Official registry OCID
ocds-h6vhtk-02ca37 Find a Tender
Contract terms
Performance terms

The Alarm Receiving Centre (ARC) which the current and replacement equipment will signals and alerts to is not subject to this procurement process. This is currently provided via a shared service agreement with Southampton City Council and there are no plans to review this arrangement at present.

In order to ensure that the new systems are able to integrate with differing equipment hardware, ARC systems and can be effectively maintained & serviced by any number of contractors once installed the Council will require on mandated basis that applying contractors are able to supply & install systems and subsequently service & maintain on a full Open Protocol basis.

Warden call systems MUST meet the requirements of BS8521 Specification or equivalent for dual-tone multi-frequency (DTMF) signalling protocol for social alarm systems and Council performance specification. The contractor will be required to supply a turn-key service to include all management, builder's work, and design (where required) to include finishes and decoration as per the Council's performance specification.

All equipment must be the most up to date with both Warden Call and Telecare capability. The equipment must have both analogue and digital capability so that the equipment can operate with the existing analogue infrastructure and subsequently transfer to the future digital infrastructure without any further upgrading.

The contractor must be able to install the new system whilst the existing system remains operational throughout so there is no disruption to the safety of the residents. The contractor must have a maximum response time of 4 hours to carry out any repairs.

How it was run

Official notice
Run through: In-tend · Who buys & how to bid on In-tend
Supplier login requiredLanguage: EN
Access & registration note: Free · one account per buying organisation's portal · reCAPTCHA on signup

Tender documents are also served through a separate tool: https://in-tendhost.co.uk/portsmouthcc/aspx/home ↗

Appointment period ends
20 Aug 2021, 14:00 BST
Submission channel
{"electronicSubmission"}
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

Timeline

20 Jul 2021 → 6 Sept 2021 · 3 dates
  1. Notice published
    20 Jul 2021, 15:51 BST
  2. Admission / appointment period endsperiod end, not a bid countdown
    20 Aug 2021, 14:00 BST
  3. Invitations to tender expected
    6 Sept 2021, 00:00 BST

Contracting authority & participating public bodies

PORTSMOUTH CITY COUNCIL

Contracting authorityLocal CouncilRegional or local authorityGeneral public services City Council, Portsmouth, South East, PO12BGContact name, email, phone Published organisation website ↗

Dispute resolution & review bodies

  • The High Court of JusticeReview body LondonContact phone

Official documents & specifications (2)

Official links; attachments are not copied

Tender pack and attachments

  • Economic and financial selection criteriatenderEconomic and financial selection criteria
  • Technical selection criteriatenderTechnical selection criteria