Tenders you can still bid for.
Notices at tender stage whose deadline has not passed, counted the way the search counts them: a notice shows under every code and region it names.
i
Notices published in the last 12 months.
Counted per tender, not per lot, against the 12 months before where shown.
i
How many companies usually bid when this buyer runs a tender.
Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.
Based on 3 lots from this buyer’s competitions, last 24 months. Small sample.
i
How much of this buyer’s work goes to its three most frequent suppliers.
Share of its awarded tenders that name at least one of the top three. Each tender is counted once.
22 awarded tenders, 21 different suppliers.
Describes the record. It is not a sign of favouritism.
i
Contracts that finish in the next 18 months.
Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.
An end date does not confirm a new procurement.
i
How much this buyer has awarded recently, by published values.
Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.
Published values, not actual spend. The biggest rows are listed so you can check.
Open notices
1 live · deadline in the future or not published · as of page build
| Notice | Deadline | Days left | Published value |
|---|---|---|---|
| GH2011 Kitchen and Bathrooms Refurbishment | 20 Nov 2026 | 25d | £21,000,000 |
What they buyi
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
i
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
Last 24 months · CPV divisions on published procedures · a notice with several divisions counts in each
45 Construction work15 procedures · 60% · 1 open90 Sewage, refuse, cleaning and environmental3 procedures · 12%42 Industrial machinery2 procedures · 8%44 Construction structures and materials2 procedures · 8%50 Repair and maintenance services2 procedures · 8%60 Transport services (except waste transport)2 procedures · 8%63 Supporting and auxiliary transport; travel1 procedures · 4%71 Architectural, construction, engineering1 procedures · 4%How they buyi
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Last 24 months · 25 notices · commercial tool and route as published on the notice, not a legal-regime claim
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Contract100%(25 notices)
25 of 25 notices are Contract (100%).
i
Which procedures buyers here use.
Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.
Open76%(19 notices)
19 of 25 notices are Open (76%).Direct award12%(3 notices)
3 of 25 notices are Direct award (12%).Limited / restricted12%(3 notices)
3 of 25 notices are Limited / restricted (12%).
i
How many companies usually bid when this buyer runs a tender.
Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.
Based on 3 lots from this buyer’s competitions, last 24 months. Small sample.
i
How long this buyer takes to decide after bids close.
Middle value in days from the bid deadline to the award date, on this buyer’s own tenders.
Based on 3 decided tenders across all categories, last 24 months.
i
How often this buyer changes a notice after publishing it.
Middle number of amendments per notice. Deadline extensions and corrections both count.
Based on 25 notices across all categories, last 24 months.
i
Do this buyer’s awards land above or below its own estimates.
Each lot’s published estimate against its award, on this buyer’s competitions, like for like.
Based on 1 lots with both an estimate and an award, last 24 months. Small sample.
A past pattern, not a price to bid.
Who wins herei
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
i
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
All published awards naming a supplier · ranked by distinct procedures, not pounds · panel and call-off entries inflate award records
| Supplier | Procedures | Share | Last 24m | Award records | Last activity |
|---|---|---|---|---|---|
| Elliott Environmental Drainage Ltd | 2 | 9.1% | 2 | 2 | 13 May 2025 |
| Crittenden Tarmac and Concreting Contractors | 1 | 4.5% | 1 | 1 | — |
| Unite Lift Services Ltd | 1 | 4.5% | 1 | 1 | 15 May 2025 |
| Accordial | 1 | 4.5% | 1 | 1 | — |
| Total Support Services Ltd | 1 | 4.5% | 1 | 1 | 1 Jul 2025 |
| ABCA systems limited | 1 | 4.5% | 1 | 1 | — |
| Carbon3 | 1 | 4.5% | 1 | 1 | 8 Oct 2025 |
| Gould Landscapes Ltd | 1 | 4.5% | 1 | 1 | — |
The three most frequent suppliers are named on 18% of 22 awarded procedures (each procedure counted once, so a panel shared by several of them is not double-counted); 21 distinct suppliers hold at least one. Descriptive concentration of published awards, not a statement of preference.
i
How much this buyer has awarded recently, by published values.
Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.
Published values, not actual spend. The biggest rows are listed so you can check.
i
The middle published award value for this buyer.
Middle value of the same awards as the total above.
Largest published awards iThe biggest published awards. Awards to a single supplier with a published value, largest first, so you can check the totals against the notice. A repeated framework total can appear here. Open the notice to check. | Supplier | Awarded | Term | Published value |
|---|---|---|---|---|
| Groundworks | Crittenden Tarmac and Concreting Contractors | — | 3 yrs · up to 6 yrs | £3,456,000 † ≈ £1.2m/yr |
| SHF 2.1 Completion Works | Carbon3 | — | 5 mo | £908,863 |
| Drainage Works | Capital Drainage Ltd | — | — | £780,000 † |
| Grounds Maintenance Services | Gould Landscapes Ltd | — | — | £490,647 † |
| Beech House, Beneden House and Lamberhurst House MRL Lift Replacement | Liftworks Ltd | — | 7 mo | £355,155 † |
Contracts endingi
Contracts that finish in the next 18 months.
Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.
An end date does not confirm a new procurement.
i
Contracts that finish in the next 18 months.
Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.
An end date does not confirm a new procurement.
15 of 20 contracts carry an end date, 9 estimated from the duration · not a retender forecast
| Contract | Holder | Ends | Published value |
|---|---|---|---|
| Kitchen, bathrooms and associated works | Mulalley & Company Limited | 15 Nov 2026 estimated | £15,000,000 |
| Cambridge Crescent Regeneration | SKILLCROWN HOMES LIMITED | 2 May 2027 estimated | £62,740,000 |
| Electrical Contractor Works | Niblock Building Contractors | 22 Oct 2027 estimated | £5,000,000 |
Recent procedures
Latest 50 of 50 procedures where this authority buys, is the authority the work is for, or runs the procurement
| Procedure | Status | Published | Published value |
|---|---|---|---|
| Fire Remedial ContractorBuilding installation work | Open | 22 Jun 2026 | £600,000 |
| Lenham House Sprinkler System ReplacementFire-prevention installation works | Open | 8 May 2026 | £155,000 |
| Cyclical Repairs and External Property Wash-downs and Associated WorkPainting and protective-coating work of structures | Open | 16 Jan 2026 | £7,000,000 |
| Removals and decants tender noticeTransport services (excl. Waste transport) | Open | 4 Nov 2025 | £96,000 |
| Asbestos Works Tender NoticeAsbestos-removal work | Open | 3 Nov 2025 | £2,880,000 |
| Sewage Plant MaintenanceSewage services | Awarded / complete | 28 Oct 2025 | — |
| Retractable Wall Maintenance and Servicing Contract | Awarded / complete | 22 Oct 2025 | — |
| Contract Pack Golding Homes Door Entry Installations - CertusRepair and maintenance services of building installations | Awarded / complete | 21 Oct 2025 | £80,000 |
| Communal Doors Installation ContractBuilding installation work | Awarded / complete | 17 Oct 2025 | £240,000 |
| SHF2.1 Works Contract Award | Awarded / complete | 8 Oct 2025 | — |
| Mattison Place Cesspool InstallationConstruction work for sewage pipes | Awarded / complete | 1 Sept 2025 | £150,000 |
| Energy Measures WorksBuilding alteration work | Open | 21 Aug 2025 | £2,500,000 |
| Golding Homes - Removals And DecantsOther community | Awarded / complete | 19 Aug 2025 | £90,000 |
| Beech House, Beneden House and Lamberhurst House MRL Lift ReplacementConstruction work | Awarded / complete | 14 Aug 2025 | £450,000 |
| Pest ControlPest-control services | Awarded / complete | 1 Aug 2025 | £480,000 |
| Golding Homes - Repair And Maintenance Top Up ContractorConstruction work | Open | 21 Jul 2025 | £1,440,000 |
| Groundworks | Awarded / complete | 7 Jul 2025 | — |
| GHCOM1005 - Door EntryBuilding installation work | Cancelled | 11 Jun 2025 | £80,000 |
| GHCOM1006 - Broadway Heights Lift TenderConstruction work | Open | 29 May 2025 | £360,000 |
| Sycamore Court-Goudhurst House Lift Install - Unite Lifts | Awarded / complete | 19 May 2025 | — |
About this data
- Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
- One profile per authority. Different spellings and registration numbers of the same body are merged into this profile. It includes tenders the authority ran for other bodies and tenders run on its behalf; spend is credited to the body that pays.
- Values are published values. Award values are what the authority published, excluding VAT and framework ceilings. They are not a budget or total spend.
- Contract end dates. 15 of 20 published contracts have an end date; 9 of those are estimated as the signature (or publication) date plus the published duration and are marked “estimated”. They feed “Contracts ending”, the same rule as the retender radar.
- Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.