LHC Procurement Group: Contract Register & Procurement Profile

Other public bodyGreater LondonUxbridgeCentral purchasing body on 7 of 21 notices

Official UK PPONPWTR-5763-BVJQ

Open now5next deadline 11 Dec 2026
i

Tenders you can still bid for.

Notices at tender stage whose deadline has not passed, counted the way the search counts them: a notice shows under every code and region it names.

Notices, last 12 months10-9% vs prior 12 months (11)
i

Notices published in the last 12 months.

Counted per tender, not per lot, against the 12 months before where shown.

Top-3 supplier share48%of 23 awarded procedures · 468 suppliers
i

How much of this buyer’s work goes to its three most frequent suppliers.

Share of its awarded tenders that name at least one of the top three. Each tender is counted once.

23 awarded tenders, 468 different suppliers.

Describes the record. It is not a sign of favouritism.

All awards we hold.

Contracts ending ≤18 months524 within 6 months · 47 estimated
i

Contracts that finish in the next 18 months.

Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.

An end date does not confirm a new procurement.

Open notices

5 live · deadline in the future or not published · as of page build

NoticeDeadlineDays leftPublished value
Refurbishment and Modernisation (RM4S) - Scotland Framework AgreementFrameworkcentral purchasing body16 lots11 Dec 202646d£900,000,000
Energy Efficiency & Renewable Technology DPSDPScentral purchasing body8 lots18 Feb 2029846d£75,000,000
Repairs and Maintenance DPSDPS14 lots18 Feb 2029846d£55,000,000
Energy Efficiency & Renewable Technology DPSDPScentral purchasing body8 lots19 Feb 2029847d£50,000,000
Repairs and Maintenance DPSDPScentral purchasing body14 lots19 Feb 2029847d£4,000,000

What they buy
i

What kind of work is bought here.

Notices by procurement category (CPV). A notice with several categories counts in each.

Last 24 months · CPV divisions on published procedures · a notice with several divisions counts in each

45 Construction work20 procedures · 95% · 5 open
50 Repair and maintenance services8 procedures · 38% · 5 open
42 Industrial machinery8 procedures · 38% · 4 open
44 Construction structures and materials7 procedures · 33% · 2 open
71 Architectural, construction, engineering6 procedures · 29% · 2 open
09 Petroleum, coal, oil and gas5 procedures · 24% · 2 open
31 Electrical machinery4 procedures · 19% · 4 open

How they buy
i

How work here is packaged.

Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.

Last 24 months · 21 notices · commercial tool and route as published on the notice, not a legal-regime claim

Commercial tool
i

How work here is packaged.

Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.

  • Framework67%(14 notices)
    14 of 21 notices are Framework (67%).
  • Dynamic purchasing system19%(4 notices)
    4 of 21 notices are Dynamic purchasing system (19%).
  • Contract14%(3 notices)
    3 of 21 notices are Contract (14%).
Procedure route
i

Which procedures buyers here use.

Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.

  • Open57%(12 notices)
    12 of 21 notices are Open (57%).
  • Route not published33%(7 notices)
    7 of 21 notices are Route not published (33%).
  • Selective10%(2 notices)
    2 of 21 notices are Selective (10%).
Notice amendments
i

How often this buyer changes a notice after publishing it.

Middle number of amendments per notice. Deadline extensions and corrections both count.

Based on 21 notices across all categories, last 24 months.

Last 24 months.

08 of 21 notices amended

Who wins here
i

Which suppliers win the most here.

Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.

All published awards naming a supplier · ranked by distinct procedures, not pounds · panel and call-off entries inflate award records

SupplierProceduresShareLast 24mAward recordsLast activity
M & J GROUP (CONSTRUCTION & ROOFING) LTDframework/DPS on 7939.1%4202 Oct 2026
CLC Contractors Ltdframework/DPS on 5626.1%024—
IAN WILLIAMSframework/DPS on 5626.1%022—
VINCI Construction UKframework/DPS on 4521.7%282 Oct 2026
Joyner PA Cymru Ltdframework/DPS on 5521.7%112—
BELL GROUP LTDframework/DPS on 5521.7%021—
Morgan Sindall Construction and Infrastructure Ltdframework/DPS on 2417.4%3102 Oct 2026
Kier Construction Ltdframework/DPS on 2417.4%372 Oct 2026

The three most frequent suppliers are named on 48% of 23 awarded procedures (each procedure counted once, so a panel shared by several of them is not double-counted); 468 distinct suppliers hold at least one. Descriptive concentration of published awards, not a statement of preference.

Contracts ending
i

Contracts that finish in the next 18 months.

Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.

An end date does not confirm a new procurement.

108 of 118 contracts carry an end date, 96 estimated from the duration · not a retender forecast

ContractHolderEndsPublished value
Manufacture, Supply and Installation of PVC-U Windows and DoorsGraham Holmes Astraseal, NATIONWIDE WINDOWS LIMITED, SER Contractor Ltd +431 Jan 2027£20,000,000
Manufacture, Supply and Installation of PVC-U Windows and Doors - U11Graham Holmes Astraseal, IDM DOORS LIMITED, NATIONWIDE WINDOWS LIMITED +331 Jan 2027£16,000,000
Manufacture, Supply and Installation of PVC-U Windows and Doors - U11CCG (Scotland) Ltd, CR Smith Manufacturing, Sidey Solutions Limited +131 Jan 2027£30,000,000
Manufacture, Supply and Installation of PVC-U Windows and Doors - U11Graham Holmes Astraseal, Graham Holmes Astraseal, IDM DOORS LIMITED +931 Jan 2027£16,000,000
ALL LOTSGalliford Try Construction Limited, Galliford Try Construction Limited, Kier Construction Ltd +730 Apr 2027£16,000,000
1A - Asbestos ConsultancyALLIUM ENVIRONMENTAL LIMITED, Bradley Environmental Consultants Limited, ENQUIN ENVIRONMENTAL LIMITED +710 Aug 2027 estimated£10,000,000
5B - Portable Appliance Testing (PAT)phs Compliance10 Aug 2027 estimated£10,000,000
1B - Asbestos Surveys & TestingArmstrong York Asbestos Environmental Ltd, ALLIUM ENVIRONMENTAL LIMITED, Bradley Environmental Consultants Limited +1010 Aug 2027 estimated£10,000,000
1C - Asbestos Removal & Disposal WorksA&D Environmental Services, ASPECT CONTRACTS LIMITED, PHH Environmental (UK) Limited +410 Aug 2027 estimated£10,000,000
2A - Property Protection and Associated ServicesORBIS PROTECT LIMITED, SPS Doorguard Limited, VPS (UK) Ltd10 Aug 2027 estimated£10,000,000

Soonest 10 of 52 contracts ending within 18 months.

Recent procedures

Latest 46 of 46 procedures where this authority buys, is the authority the work is for, or runs the procurement

ProcedureStatusPublishedPublished value
Roofing SystemsFrameworkcentral purchasing body4 lotsRoof works and other special trade construction worksAwarded / complete9 Jan 2025£1,000,000
Roofing SystemsFramework4 lotsRoof works and other special trade construction worksAwarded / complete9 Jan 2025£26,000,000
Fire Safety FrameworkFrameworkcentral purchasing body11 lotsBuilding consultancy servicesAwarded / complete30 Jul 2024£105,000,000
Design, Supply and Installation of Permanent and Temporary Modular Buildingscentral purchasing body4 lotsPrefabricated buildingsPlanned12 Jun 2024£30,000,000
Supply and Installation of Aluminium Windows & DoorsFrameworkcentral purchasing bodyInstallation of door and window framesAwarded / complete12 Apr 2024£20,000,000
Aluminium Windows and DoorsFrameworkDoor framesAwarded / complete4 Apr 2024£40,000,000
North and Mid-Wales Residential Construction FrameworkFrameworkConstruction economics servicesNot published20 Mar 2024—
LHC Procurement Group 2024 Procurement Pipelinecentral purchasing bodyBoiler installationsPlanned6 Mar 2024—
LHC Procurement Group 2024 Procurement Pipeline NoticeBoiler installationsPlanned6 Mar 2024—
Refurbishment and Modernisation Framework AgreementFramework11 lotsBathrooms construction workAwarded / complete29 Feb 2024£210,000,000
Refurbishment and Modernisation Framework AgreementFrameworkcentral purchasing body11 lotsBathrooms construction workAwarded / complete29 Feb 2024£50,000,000
Asset Safety and Compliance FrameworkFrameworkcentral purchasing body12 lotsAir-conditioning installationsAwarded / complete17 Oct 2023£135,000,000
Passive Fire Protection (FS1P) Extension NoticeBuilding construction workNot published28 Jun 2023—
FS1-C: Fire Safety Consultancy and Fire Risk AssessorsFire-prevention servicesNot published28 Mar 2023—
LHC and WPA 2023 Procurement Pipeline Noticecentral purchasing bodyBathrooms construction workPlanned24 Jan 2023—
Manufacture and Supply of Domestic Kitchens and Associated ProductsFrameworkcentral purchasing body2 lotsFitted kitchensAwarded / complete1 Sept 2022£2,500,000
Asset Safety and Compliance FrameworkFrameworkcentral purchasing body10 lotsAsbestos removal servicesPlanned30 Aug 2022—
Modern Methods of Construction New Homes Framework NH3Frameworkcentral purchasing body5 lotsAssembly and erection of prefabricated structuresPlanned4 Feb 2022—
uPVC and Timber Windows and Doorscentral purchasing body3 lotsInstallation of doors and windows and related componentsPlanned9 Jul 2021—
Schools and Community Buildings — WalesBuilding construction workNot published9 Jun 2021—

Search all 46 procedures for this authority →

About this data
  • Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
  • One profile per authority. Different spellings and registration numbers of the same body are merged into this profile. It includes tenders the authority ran for other bodies and tenders run on its behalf; spend is credited to the body that pays.
  • Values are published values. Award values are what the authority published, excluding VAT and framework ceilings. They are not a budget or total spend.
  • Contract end dates. 108 of 118 published contracts have an end date; 96 of those are estimated as the signature (or publication) date plus the published duration and are marked “estimated”. They feed “Contracts ending”, the same rule as the retender radar.
  • Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.