Thanet District Council: Contract Register & Procurement Profile
NHS ODS: LOCAL AUTHORITY·ONS register: Local-authority-district·Social housing register: Local authority·NHS ODS: LOCAL AUTHORITY - LEGACY·Local authority·South East England·Margate
Official UK PPONPYDQ-9172-CNVV
i
Tenders you can still bid for.
Notices at tender stage whose deadline has not passed, counted the way the search counts them: a notice shows under every code and region it names.
i
Notices published in the last 12 months.
Counted per tender, not per lot, against the 12 months before where shown.
i
How much of this buyer’s work goes to its three most frequent suppliers.
Share of its awarded tenders that name at least one of the top three. Each tender is counted once.
24 awarded tenders, 25 different suppliers.
Describes the record. It is not a sign of favouritism.
i
Contracts that finish in the next 18 months.
Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.
An end date does not confirm a new procurement.
i
How much this buyer has awarded recently, by published values.
Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.
Published values, not actual spend. The biggest rows are listed so you can check.
Open notices
1 live · deadline in the future or not published · as of page build
| Notice | Deadline | Days left | Published value |
|---|---|---|---|
| Thanet Bus Shelter Replacement Project | 4 Nov 2026 | 8d | £1,495,000 |
What they buyi
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
i
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
Last 24 months · CPV divisions on published procedures · a notice with several divisions counts in each
45 Construction work21 procedures · 62% · 1 open50 Repair and maintenance services4 procedures · 12%71 Architectural, construction, engineering4 procedures · 12%79 Business services: law, marketing, consulting4 procedures · 12%34 Transport equipment and products2 procedures · 6% · 1 open42 Industrial machinery1 procedure · 3%44 Construction structures and materials1 procedure · 3%48 Software package and information systems1 procedure · 3%How they buyi
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Last 24 months · 34 notices · commercial tool and route as published on the notice, not a legal-regime claim
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Contract100%(34 notices)
34 of 34 notices are Contract (100%).
i
Which procedures buyers here use.
Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.
Open76%(26 notices)
26 of 34 notices are Open (76%).Limited / restricted15%(5 notices)
5 of 34 notices are Limited / restricted (15%).Direct award9%(3 notices)
3 of 34 notices are Direct award (9%).
Who wins herei
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
i
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
All published awards naming a supplier · ranked by distinct procedures, not pounds · panel and call-off entries inflate award records
| Supplier | Procedures | Share | Last 24m | Award records | Last activity |
|---|---|---|---|---|---|
| Curl la Tourelle Head Architecture | 2 | 8.3% | 0 | 2 | — |
| Jan Kattein Architects | 2 | 8.3% | 0 | 2 | — |
| Exmouth Marine Limited | 1 | 4.2% | 1 | 2 | 4 Sept 2026 |
| Softcat Plc | 1 | 4.2% | 1 | 1 | 14 Jul 2026 |
| OVENDEN ALLWORKS LIMITED | 1 | 4.2% | 1 | 1 | — |
| INTERFIX WASHROOMS LIMITED | 1 | 4.2% | 1 | 1 | — |
| KENT CABLES LIMITED | 1 | 4.2% | 1 | 1 | — |
| Axis Recruitment Limited | 1 | 4.2% | 1 | 1 | 3 Sept 2026 |
The three most frequent suppliers are named on 21% of 24 awarded procedures (each procedure counted once, so a panel shared by several of them is not double-counted); 25 distinct suppliers hold at least one. Descriptive concentration of published awards, not a statement of preference.
i
How much this buyer has awarded recently, by published values.
Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.
Published values, not actual spend. The biggest rows are listed so you can check.
i
The middle published award value for this buyer.
Middle value of the same awards as the total above.
Largest published awards iThe biggest published awards. Awards to a single supplier with a published value, largest first, so you can check the totals against the notice. A repeated framework total can appear here. Open the notice to check. | Supplier | Awarded | Term | Published value |
|---|---|---|---|---|
| Green Campus works contract | Apex Contractors Ltd | 11 Aug 2026 | 1.1 yrs | £6,781,589 ≈ £6.3m/yr |
| Ramsgate Royal Harbour Mechanical Dredging | Exmouth Marine Limited | 4 Sept 2026 | 3 yrs · up to 5 yrs | £562,080 ≈ £187k/yr |
| Replacement Backup Solution Platform | Softcat Plc | 14 Jul 2026 | 5 yrs | £231,060 ≈ £46k/yr |
| Public Sector Decarbonisation Scheme Phase 4 - Consultant Design Team | Barker Associates (Essex) Limited | 27 Mar 2026 | 6 mo · up to 2.5 yrs | £191,640 |
| Camera and Microphone Replacement | Nuway Audio Visual Limited | — | 3 yrs | £139,588 † ≈ £47k/yr |
Contracts endingi
Contracts that finish in the next 18 months.
Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.
An end date does not confirm a new procurement.
i
Contracts that finish in the next 18 months.
Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.
An end date does not confirm a new procurement.
16 of 25 contracts carry an end date, 8 estimated from the duration · not a retender forecast
| Contract | Holder | Ends | Published value |
|---|---|---|---|
| Security software | Planet IT Ltd | 26 Mar 2027 | £42,605 |
| Treasury Advisory Service | MUFG Corporate Markets Treasury Limited | 29 Feb 2028 | £37,430 |
Recent procedures
Latest 50 of 59 procedures where this authority buys, is the authority the work is for, or runs the procurement
| Procedure | Status | Published | Published value |
|---|---|---|---|
| Residential conversion of 38-40 Grosvenor Place, MargateOverhaul and refurbishment work | Planned | 19 Oct 2026 | £2,000,000 |
| Temporary Worker ContractSupply services of personnel including temporary staff | Awarded / complete | 18 Sept 2026 | £3,300,000 |
| Ramsgate Royal Harbour Mechanical DredgingConstruction work | Awarded / complete | 8 Sept 2026 | £363,750 |
| Green Campus Main ContractorConstruction work | Awarded / complete | 11 Aug 2026 | £6,815,000 |
| Refurbishment and Restoration of the Theatre Royal MargateAuditorium construction work | Open | 30 Jul 2026 | £4,100,000 |
| Replacement Backup Solution PlatformBackup or recovery software development services | Awarded / complete | 16 Jul 2026 | £240,000 |
| Spitfire Way works contractConstruction work | Open | 24 Jun 2026 | £990,000 |
| Public Toilets - Phase 3 Repairs and Maintenance WorksOverhaul and refurbishment work | Open | 24 Jun 2026 | £450,000 |
| Port Transformer #3 Replacement | Awarded / complete | 23 Jun 2026 | — |
| Margate Harbour Arm Stabilisation | Awarded / complete | 23 Jun 2026 | — |
| Kent Innovation Centre Toilet Refurbishment | Awarded / complete | 23 Jun 2026 | — |
| Fibre and Cabling | Awarded / complete | 23 Jun 2026 | — |
| Treasury Advisory Service | Awarded / complete | 15 Jun 2026 | — |
| Camera and Microphone Replacement | Awarded / complete | 15 Jun 2026 | — |
| Security software | Awarded / complete | 15 Jun 2026 | — |
| Stone Bay Toilets - New Build and RefurbishmentConstruction work | Open | 1 Jun 2026 | £526,000 |
| Thanet District Council office ground floor refurbishment and reconfiguration - Consultant Design TeamArchitectural design services | Open | 28 May 2026 | £75,000 |
| Walpole Bay Beach FacilitiesBuilding completion work | Open | 22 Apr 2026 | £805,000 |
| Public Sector Decarbonisation Scheme Phase 4 - Consultant Design TeamDesign consultancy services | Awarded / complete | 10 Apr 2026 | £181,000 |
| Green Campus Works ContractConstruction work | Planned | 7 Apr 2026 | £7,000,000 |
About this data
- Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
- One profile per authority. Different spellings and registration numbers of the same body are merged into this profile. It includes tenders the authority ran for other bodies and tenders run on its behalf; spend is credited to the body that pays.
- Values are published values. Award values are what the authority published, excluding VAT and framework ceilings. They are not a budget or total spend.
- Contract end dates. 16 of 25 published contracts have an end date; 8 of those are estimated as the signature (or publication) date plus the published duration and are marked “estimated”. They feed “Contracts ending”, the same rule as the retender radar.
- Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.