UK Fusion Energy Ltd: Contract Register & Procurement Profile

Companies House: Private Limited CompanyGOV.UK register: Sub organisationOther public bodySouth East EnglandAbingdon

Official UK PPONPCRM-7973-DCBL

Open now1next deadline 29 Oct 2026
i

Tenders you can still bid for.

Notices at tender stage whose deadline has not passed, counted the way the search counts them: a notice shows under every code and region it names.

Notices, last 12 months97+98% vs prior 12 months (49)
i

Notices published in the last 12 months.

Counted per tender, not per lot, against the 12 months before where shown.

Typical bids per lot39.5% single-bid · 21 bid reports
i

How many companies usually bid when this buyer runs a tender.

Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.

Based on 21 lots from this buyer’s competitions, last 24 months.

Last 24 months, all categories.

Top-3 supplier share14%of 70 awarded procedures · 67 suppliers
i

How much of this buyer’s work goes to its three most frequent suppliers.

Share of its awarded tenders that name at least one of the top three. Each tender is counted once.

70 awarded tenders, 67 different suppliers.

Describes the record. It is not a sign of favouritism.

All awards we hold.

Contracts ending ≤18 months1810 within 6 months · 6 estimated
i

Contracts that finish in the next 18 months.

Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.

An end date does not confirm a new procurement.

Published award value, 24m£148mnet · on 59 of 59 published values · top 5 = 82%
i

How much this buyer has awarded recently, by published values.

Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.

Published values, not actual spend. The biggest rows are listed so you can check.

Open notices

1 live · deadline in the future or not published · as of page build

NoticeDeadlineDays leftPublished value
PLANC (Permitting, Licences, Authorisations, Notifications & Consent) Assurance29 Oct 202623h£1,200,000

What they buy
i

What kind of work is bought here.

Notices by procurement category (CPV). A notice with several categories counts in each.

Last 24 months · CPV divisions on published procedures · a notice with several divisions counts in each

How they buy
i

How work here is packaged.

Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.

Last 24 months · 146 notices · commercial tool and route as published on the notice, not a legal-regime claim

Commercial tool
i

How work here is packaged.

Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.

  • Contract95%(139 notices)
    139 of 146 notices are Contract (95%).
  • Framework3%(4 notices)
    4 of 146 notices are Framework (3%).
  • Dynamic purchasing system2%(3 notices)
    3 of 146 notices are Dynamic purchasing system (2%).
Procedure route
i

Which procedures buyers here use.

Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.

  • Route not published36%(52 notices)
    52 of 146 notices are Route not published (36%).
  • Open34%(49 notices)
    49 of 146 notices are Open (34%).
  • Direct award19%(28 notices)
    28 of 146 notices are Direct award (19%).
  • Limited / restricted7%(10 notices)
    10 of 146 notices are Limited / restricted (7%).
  • Selective5%(7 notices)
    7 of 146 notices are Selective (5%).
Typical bids per lot
i

How many companies usually bid when this buyer runs a tender.

Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.

Based on 21 lots from this buyer’s competitions, last 24 months.

Last 24 months, all categories.

3robust · n=219.5% of lots drew a single bid
Deadline → award
i

How long this buyer takes to decide after bids close.

Middle value in days from the bid deadline to the award date, on this buyer’s own tenders.

Based on 27 decided tenders across all categories, last 24 months.

Last 24 months.

28 daysrobust · n=27
Notice amendments
i

How often this buyer changes a notice after publishing it.

Middle number of amendments per notice. Deadline extensions and corrections both count.

Based on 146 notices across all categories, last 24 months.

Last 24 months.

036 of 146 notices amended
Award vs estimate
i

Do this buyer’s awards land above or below its own estimates.

Each lot’s published estimate against its award, on this buyer’s competitions, like for like.

Based on 18 lots with both an estimate and an award, last 24 months.

A past pattern, not a price to bid.

Last 24 months.

0% at estimaterobust · n=18

Who wins here
i

Which suppliers win the most here.

Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.

All published awards naming a supplier · ranked by distinct procedures, not pounds · panel and call-off entries inflate award records

SupplierProceduresShareLast 24mAward recordsLast activity
Amentum Clean Energy Ltdframework/DPS on 145.7%474 Aug 2026
Kyoto Fusioneering45.7%443 Jul 2026
NPL Management Limitedframework/DPS on 134.3%344 Aug 2026
TSM Engineering34.3%336 Aug 2025
UNIVERSITY OF MANCHESTER34.3%33—
University of Strathclydeframework/DPS on 122.9%243 Aug 2026
Fujikura Europe Ltd.framework/DPS on 222.9%237 Nov 2025
Oxford Sigmaframework/DPS on 122.9%224 Aug 2026

The three most frequent suppliers are named on 14% of 70 awarded procedures (each procedure counted once, so a panel shared by several of them is not double-counted); 67 distinct suppliers hold at least one. Descriptive concentration of published awards, not a statement of preference.

Published award value (24m)
i

How much this buyer has awarded recently, by published values.

Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.

Published values, not actual spend. The biggest rows are listed so you can check.

£148mSum of published VAT-exclusive values on 59 of 59 published single-supplier values; the five largest make 82%; a further 6 published a VAT-inclusive amount only, kept apart.
Typical single-supplier award (24m)
i

The middle published award value for this buyer.

Middle value of the same awards as the total above.

Last 24 months.

£200k middle valuerobust · n=59Middle half £95k–£500k.
Largest published awards
i

The biggest published awards.

Awards to a single supplier with a published value, largest first, so you can check the totals against the notice.

A repeated framework total can appear here. Open the notice to check.

SupplierAwardedTermPublished value
Magnets Partner AgreementTokamak Energy Ltd25 Mar 20263 yrs · up to 5 yrs£70,000,000
≈ £23m/yr
PLM Support ServicesDassault Systemes UK Limited——£18,320,000 †
3DX Platform Licences and Wider EcosystemDassault Systemes UK Limited——£16,926,920 †
Call-Off Contract No. PP-UKIFS-218d for the supply of HighPerformance Computing - Updateboxxe Limited——£8,901,555 †
2G (REBCO-based) HTS Tape for the STEP Toroidal Field Model CoilShanghai Superconductor Technology Co.,14 Oct 20251.7 yrs · up to 3.2 yrs£7,000,000
≈ £4.2m/yr

Contracts ending
i

Contracts that finish in the next 18 months.

Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.

An end date does not confirm a new procurement.

40 of 48 contracts carry an end date, 6 estimated from the duration · not a retender forecast

Soonest 10 of 18 contracts ending within 18 months.

Recent procedures

Latest 50 of 146 procedures where this authority buys, is the authority the work is for, or runs the procurement

ProcedureStatusPublishedPublished value
Corrosion Testing Framework for STEPFramework3 lotsAnalysis servicesAwarded / complete14 Oct 2026£6,000,000
Cryogenics Partner for the STEP ProgrammeDesign and execution of research and developmentPlanning2 Oct 2026£0
Evolution of Electricity Systems and Markets and Implications for Fusion and other Low Carbon GenerationElectricityPlanning29 Sept 2026£0
UKFE External Board ReviewPerformance review servicesOpen23 Sept 2026£50,000
Fuel Cycle Technical Specification DevelopmentAwarded / complete17 Sept 2026—
Laser Induced Desorption System for Measuring First Wall Retention in STEPEngineering design servicesAwarded / complete16 Sept 2026£75,000
HVAC concept-level studyEngineering design servicesOpen16 Sept 2026£70,000
Design for Longevity- Electrolyser Prototype DesignEngineering servicesAwarded / complete15 Sept 2026£125,000
MAST-U EBW Transmission Line PSQEngineering design servicesOpen10 Sept 2026£0
MTC membershipAwarded / complete2 Sept 2026—
HiCrIS Full Design & BuildDesign and execution of research and developmentPlanning25 Aug 2026£0
PMEN UKFE - 259 Aluminium Waveguide StraightnessNon-destructive testing servicesPlanning24 Aug 2026£20,000
Moveable Shielding Concept Design StudyCivil engineering consultancy servicesOpen24 Aug 2026£70,000
Detailed design and build of a scaled down Fast Acting Low Conductance (FALCON)Design and execution of research and developmentOpen17 Aug 2026£200,000
Palladium Silver Membranes Tensile and Fatigue TestingComposition and purity testing and analysis servicesOpen14 Aug 2026£165,000
Procurement of Testing Campaign Using a Packed Bed Flow Reactor – PP-UKIFS - 458Awarded / complete13 Aug 2026—
STEP Programme Reporting DevelopmentAwarded / complete12 Aug 2026—
Detailed Design and Build of a Compound Cryogenic Pump Prototype (CCPP)Air pumpsAwarded / complete11 Aug 2026£1,500,000
HVAC concept-level studyEngineering design servicesPlanned6 Aug 2026£70,000
High Field TestingAwarded / complete6 Aug 2026—

Search all 146 procedures for this authority →

About this data
  • Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
  • One profile per authority. Different spellings and registration numbers of the same body are merged into this profile. It includes tenders the authority ran for other bodies and tenders run on its behalf; spend is credited to the body that pays.
  • Values are published values. Award values are what the authority published, excluding VAT and framework ceilings. They are not a budget or total spend.
  • Contract end dates. 40 of 48 published contracts have an end date; 6 of those are estimated as the signature (or publication) date plus the published duration and are marked “estimated”. They feed “Contracts ending”, the same rule as the retender radar.
  • Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.