Official UK procurement notice
Tender for the Provision of a Maintenance and Support Contract for an Elekta Neuromag® Triux Basic Measurement System With IHR to the University of Birmingham
Authority: THE UNIVERSITY OF BIRMINGHAM (Education)·Consortium: 2 public authorities
What is being bought
Published requirement descriptionThe University of Birmingham invites tenders for supply of a three-year Maintenance and Support contract for a MEG system and associated IHR (Elekta Neuromag® TRIUX Basic Measurement System with IHR) located at the Centre for Human Brain Health,
University of Birmingham. The contract provider will be able to fully service, repair, troubleshoot any issues associated with this system. The provider will ensure a quality, customer service level and will ensure the system and its operators are fully supported.
This will include but not be exclusive to 24/7 emergency response, parts, and on-site attendance within 48 hours.
This project may be funded by the European Regional Development Fund (ERDF) or;
- European Structural and Investment Fund (ESIF) or;
- Research Councils UK (RCUK), the strategic partnership of the UK's seven Research Councils.
CPV: Magnetometer geophysical instruments · Repair and maintenance services
The lotProcurement structure
single lot · no lot value publishedLot #1The University of Birmingham invites tenders for supply of a three-year Maintenance…Awarded
The University of Birmingham invites tenders for supply of a three-year Maintenance and Support contract for a MEG System with IHR (Elekta Neuromag® TRIUX Basic Measurement System with IHR - This TRIUX MEG system has 306 sensors distributed over
the head with 204 planar gradiometers and 102 magnetometers supported by noise-resilient ARMOR(TM) sensor technology) located at the Centre for Human Brain Health, University of Birmingham.
The provider will ensure a quality, customer service level and will ensure the system and its operators are fully supported and trained where necessary.
- Technical Support;
i. Remote Support via phone, email or online.
ii. Access to relevant software releases, manuals and general technical information.
- Usage Support;
i. Remote support via phone, email or online.
- Planned Maintenance (yearly);
i. Planned yearly maintenance visits in coordination with the Centre/Facility lead.
ii. This will include software updates, preventative solutions to mitigate issues and ensure performance.
- Parts and Corrective Maintenance;
i. Parts will be included within the service contract.
ii. Reactive maintenance for on-site repairs.
iii. On site attendance within 48 hours.
- Guarantee for Uptime above 95% threshold during a 12-month period
The maintenance/support required needs to include:
- tuning and/or replacement of faulty SQUID sensors
- maintenance of electronics rack
- maintenance of dewar (warmup and vacuum pumping)
- maintenance of He recycler
- maintenance of peripherals including participants support ('chair')
- maintenance of MSR
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published sub-criteria (5)
- Compliance to the Specifications: 45%
- Delivery and Training: 20%
- Contract Acceptance: 5%
- Standard Supplier Questionnaire (SQ): 10%
- price: 20%
Published award criteria (5)
- Compliance to the Specifications: 45
- Delivery and Training: 20
- Contract Acceptance: 5
- Standard Supplier Questionnaire (SQ): 10
- Price: 20
- Price carries 20 of 100 points: a 10% discount moves about 2 points. The method statement decides this lot, not the discount.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record- Procedure method
- Open procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Services
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- No (one-off requirement)
- First published
- 4 Jul 2022, 16:19 BST
- Last source update
- 13 Sept 2022, 09:55 BST
- Award evaluation window
- 3 Aug 2022 – …
- Authority reference
SC10894/22- FTS notice number
2022/S 000-025595- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-034dc6Find a Tender
How it was run
Official notice- Submission deadline
- 3 Aug 2022, 11:59 BST
- Submission channel
- {"electronicSubmission"}
- Accepted languages
- en
- Bids opened
- 3 Aug 2022, 12:00 BST
Timeline
3 Aug 2022 → 13 Sept 2022 · 4 dates- Submission deadline3 Aug 2022, 11:59 BST
- Bids opened3 Aug 2022, 12:00 BST
- Contract starts7 Sept 2022, 00:00 BST
- Notice published13 Sept 2022, 09:55 BST
Notice history
2 events · 2 releases on Find a Tender · since 13 Sept 2022- Status changed to complete13 Sept 2022, 09:55 BST
- Buyer details updated13 Sept 2022, 09:55 BST
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| Megin Oy | £286,352 † | — | Awarded |
Contracts
Contract 025595-2022-1 · Megin Oy
- Signed
- 25 Aug 2022
- Value
- £286,352
- Period
- … – 6 Sept 2025
- Status
- active
Bid statistics published by the authority
| Bids | SME | VCSE | Valid bid range |
|---|---|---|---|
| 1bids | — | — | — |
Contracting authority & participating public bodies
2 public bodies on the noticeDispute resolution & review bodies
- University of BirminghamReview body
Bidders & participating suppliers
1 commercial party on the notice- Megin OyAwarded supplier
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.