St George's University Hospitals NHS Foundation Trust: Contract Register & Procurement Profile

NHS ODS: NHS TRUSTCentral governmentGreater LondonLondonRan 1 procurement for other authorities

Official UK PPONPDCW-3725-ZVCPWebsitestgeorges.nhs.uk ↗

Open now0no live notices
i

Tenders you can still bid for.

Notices at tender stage whose deadline has not passed, counted the way the search counts them: a notice shows under every code and region it names.

Notices, last 12 months19+46% vs prior 12 months (13)
i

Notices published in the last 12 months.

Counted per tender, not per lot, against the 12 months before where shown.

Typical bids per lot50% single-bid · 3 bid reports
i

How many companies usually bid when this buyer runs a tender.

Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.

Based on 3 lots from this buyer’s competitions, last 24 months. Small sample.

Last 24 months, all categories.

Top-3 supplier share33%of 12 awarded procedures · 14 suppliers
i

How much of this buyer’s work goes to its three most frequent suppliers.

Share of its awarded tenders that name at least one of the top three. Each tender is counted once.

12 awarded tenders, 14 different suppliers.

Describes the record. It is not a sign of favouritism.

All awards we hold.

Contracts ending ≤18 months1none within 6 months
i

Contracts that finish in the next 18 months.

Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.

An end date does not confirm a new procurement.

Published award value, 24m£4.1mnet · on 8 of 8 published values · top 5 = 88%
i

How much this buyer has awarded recently, by published values.

Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.

Published values, not actual spend. The biggest rows are listed so you can check.

What they buy
i

What kind of work is bought here.

Notices by procurement category (CPV). A notice with several categories counts in each.

Last 24 months · CPV divisions on published procedures · a notice with several divisions counts in each

How they buy
i

How work here is packaged.

Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.

Last 24 months · 32 notices · commercial tool and route as published on the notice, not a legal-regime claim

Commercial tool
i

How work here is packaged.

Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.

  • Contract97%(31 notices)
    31 of 32 notices are Contract (97%).
  • Framework3%(1 notice)
    1 of 32 notices is Framework (3%).
Procedure route
i

Which procedures buyers here use.

Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.

  • Open59%(19 notices)
    19 of 32 notices are Open (59%).
  • Route not published19%(6 notices)
    6 of 32 notices are Route not published (19%).
  • Direct award13%(4 notices)
    4 of 32 notices are Direct award (13%).
  • Limited / restricted6%(2 notices)
    2 of 32 notices are Limited / restricted (6%).
  • Selective3%(1 notice)
    1 of 32 notices is Selective (3%).
Typical bids per lot
i

How many companies usually bid when this buyer runs a tender.

Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.

Based on 3 lots from this buyer’s competitions, last 24 months. Small sample.

Last 24 months, all categories.

5moderate · n=30% of lots drew a single bid
Notice amendments
i

How often this buyer changes a notice after publishing it.

Middle number of amendments per notice. Deadline extensions and corrections both count.

Based on 32 notices across all categories, last 24 months.

Last 24 months.

05 of 32 notices amended

Who wins here
i

Which suppliers win the most here.

Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.

All published awards naming a supplier · ranked by distinct procedures, not pounds · panel and call-off entries inflate award records

SupplierProceduresShareLast 24mAward recordsLast activity
Language Line Limited T/A Language Line Solutions216.7%2214 May 2026
Coloplast Limited18.3%1118 Mar 2026
Test Incorporated Limited18.3%1117 Nov 2025
LOCUMTAP LTD t/a Patchwork18.3%117 Sept 2026
DSSL Group Ltd18.3%1126 Feb 2026
Yourgene Health18.3%11—
Cryotomy18.3%11—
TESGL Ltd. T/A SSE Energy Solutions18.3%1127 Jan 2026

The three most frequent suppliers are named on 33% of 12 awarded procedures (each procedure counted once, so a panel shared by several of them is not double-counted); 14 distinct suppliers hold at least one. Descriptive concentration of published awards, not a statement of preference.

Published award value (24m)
i

How much this buyer has awarded recently, by published values.

Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.

Published values, not actual spend. The biggest rows are listed so you can check.

£4.1mSum of published VAT-exclusive values on 8 of 8 published single-supplier values; the five largest make 88%.
Typical single-supplier award (24m)
i

The middle published award value for this buyer.

Middle value of the same awards as the total above.

Last 24 months.

£337k middle valuerobust · n=8Middle half £218k–£413k.
Largest published awards
i

The biggest published awards.

Awards to a single supplier with a published value, largest first, so you can check the totals against the notice.

A repeated framework total can appear here. Open the notice to check.

SupplierAwardedTermPublished value
Provision of Non-Invasive Pre-natal TestingYourgene Health——£2,047,000 †
Services Contract for DermatologyCryotomy——£433,908 †
STG Building Management System MaintenanceTESGL Ltd. T/A SSE Energy Solutions27 Jan 20263 yrs · up to 5 yrs£405,885
≈ £135k/yr
STG- translation and interpretation serviceLanguage Line Limited T/A Language Line Solutions—4 mo · up to 0.8 yrs£337,000
STG- translation and interpretation serviceLanguage Line Limited T/A Language Line Solutions14 May 20264 mo · up to 0.8 yrs£337,000

Contracts ending
i

Contracts that finish in the next 18 months.

Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.

An end date does not confirm a new procurement.

7 of 10 contracts carry an end date, 1 estimated from the duration · not a retender forecast

ContractHolderEndsPublished value
Provision of Non-Invasive Pre-natal TestingYourgene Health30 Nov 2027£2,047,000

Recent procedures

Latest 41 of 40 procedures where this authority buys, is the authority the work is for, or runs the procurement

ProcedureStatusPublishedPublished value
Crawley & Eastbourne Renal Dialysis Satellite Unitsprocuring entityHaemodialysis devicesPlanning17 Nov 2025£43,000,000
Fixed Wire Testing- Non Disruptive EICR testingAwarded / complete17 Nov 2025—
Installation of Transformer Works at St James' Wing, St George's Hospital, TootingElectrical engineering installation worksOpen4 Nov 2025£420,000
A&C Workforce Review CHSFramework10 lotsAccountingAwarded / complete17 Oct 2025£500,000,000
LTHW Constant&Variable Temperature Plant/Eqpt Refurb Works at St George's HospHeating worksOpen3 Oct 2025£1,000,000
STG- Automatic Door MaintenanceRepair and maintenance servicesOpen15 Sept 2025£0
STG - Building Management System - MaintenanceBuilding and facilities management servicesOpen14 Aug 2025£0
St George's Fixed Wire Testing (EICR)Electrical servicesPlanning12 Aug 2025£250,000
STG - The Grove - Soft FMFacilities management servicesPlanned31 Jul 2025—
KRFT - Patient and Retail Catering (Soft FM Services)Catering servicesPlanning24 Jul 2025—
Toilets & Washrooms Refurbishment Works at St George's Hospital, TootingBathrooms construction workOpen11 May 2025£450,000
SGH - Fire Alarm MaintenanceFire-alarm systemsOpen1 Apr 2025£700,000
SGH - Fire Alarm MaintenanceFire-alarm systemsOpen1 Apr 2025£700,000
Grounds & Gardens Services for Epsom & St Helier University Hospitals NHS TrustGrounds maintenance servicesOpen28 Nov 2024—
KHT - Water Dispensers 2024/25Water distribution and related servicesOpen1 Jul 2024£1
NHS SWLPP - CHS ESH SGH - Site Wide Asbestos SurveysAsbestos removal servicesOpen1 Jul 2024£1
KHT - Water Dispensers 2024/25Water distribution and related servicesOpen13 Jun 2024£1
KHT - Water Dispensers 2024/25Water distribution and related servicesOpen13 Jun 2024£1
Electrical Substation Installation Work for ITU and Renal New Buildings at St George's Hospital, TootingElectrical engineering installation worksOpen1 Nov 2023£2,500,000
Croydon Health Services HVAC MTC 2023Heat-exchange unitsAwarded / complete19 Sept 2023£0

Search all 40 procedures for this authority →

About this data
  • Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
  • One profile per authority. Different spellings and registration numbers of the same body are merged into this profile. It includes tenders the authority ran for other bodies and tenders run on its behalf; spend is credited to the body that pays.
  • Values are published values. Award values are what the authority published, excluding VAT and framework ceilings. They are not a budget or total spend.
  • Contract end dates. 7 of 10 published contracts have an end date; 1 of those are estimated as the signature (or publication) date plus the published duration and are marked “estimated”. They feed “Contracts ending”, the same rule as the retender radar.
  • Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.