THAMES WATER UTILITIES LIMITED: Contract Register & Procurement Profile

Companies House: Private Limited CompanySouth East EnglandReading

Companies House02366661 ↗Websitethameswater.co.uk ↗

Open now3next deadline 2 Nov 2026
i

Tenders you can still bid for.

Notices at tender stage whose deadline has not passed, counted the way the search counts them: a notice shows under every code and region it names.

Notices, last 12 months35+52% vs prior 12 months (23)
i

Notices published in the last 12 months.

Counted per tender, not per lot, against the 12 months before where shown.

Top-3 supplier share9%of 55 awarded procedures · 217 suppliers
i

How much of this buyer’s work goes to its three most frequent suppliers.

Share of its awarded tenders that name at least one of the top three. Each tender is counted once.

55 awarded tenders, 217 different suppliers.

Describes the record. It is not a sign of favouritism.

All awards we hold.

Contracts ending ≤18 months22 within 6 months · 2 estimated
i

Contracts that finish in the next 18 months.

Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.

An end date does not confirm a new procurement.

Published award value, 24m£15mnet · on 3 of 3 published values · top 5 = 100%
i

How much this buyer has awarded recently, by published values.

Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.

Published values, not actual spend. The biggest rows are listed so you can check.

Open notices

3 live · deadline in the future or not published · as of page build

NoticeDeadlineDays leftPublished value
Pump Optimisation and Aeration Efficiency AnalysisFramework2 Nov 20264d£0
Low Code No Code Platform3 Nov 20265d£1,000,000
Continuous Testing (PTaaS) Service Agreement3 Nov 20265d£2,000,000

What they buy
i

What kind of work is bought here.

Notices by procurement category (CPV). A notice with several categories counts in each.

Last 24 months · CPV divisions on published procedures · a notice with several divisions counts in each

45 Construction work24 procedures · 41%
71 Architectural, construction, engineering10 procedures · 17% · 1 open
48 Software package and information systems7 procedures · 12% · 1 open
42 Industrial machinery6 procedures · 10% · 1 open

How they buy
i

How work here is packaged.

Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.

Last 24 months · 58 notices · commercial tool and route as published on the notice, not a legal-regime claim

Commercial tool
i

How work here is packaged.

Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.

  • Framework62%(36 notices)
    36 of 58 notices are Framework (62%).
  • Contract38%(22 notices)
    22 of 58 notices are Contract (38%).
Procedure route
i

Which procedures buyers here use.

Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.

  • Selective67%(39 notices)
    39 of 58 notices are Selective (67%).
  • Route not published17%(10 notices)
    10 of 58 notices are Route not published (17%).
  • Open16%(9 notices)
    9 of 58 notices are Open (16%).
Deadline → award
i

How long this buyer takes to decide after bids close.

Middle value in days from the bid deadline to the award date, on this buyer’s own tenders.

Based on 17 decided tenders across all categories, last 24 months.

Last 24 months.

169 daysrobust · n=17
Notice amendments
i

How often this buyer changes a notice after publishing it.

Middle number of amendments per notice. Deadline extensions and corrections both count.

Based on 58 notices across all categories, last 24 months.

Last 24 months.

025 of 58 notices amended
Award vs estimate
i

Do this buyer’s awards land above or below its own estimates.

Each lot’s published estimate against its award, on this buyer’s competitions, like for like.

Based on 5 lots with both an estimate and an award, last 24 months.

A past pattern, not a price to bid.

Last 24 months.

0% at estimaterobust · n=5

Who wins here
i

Which suppliers win the most here.

Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.

All published awards naming a supplier · ranked by distinct procedures, not pounds · panel and call-off entries inflate award records

SupplierProceduresShareLast 24mAward recordsLast activity
Jacobs UK Ltdframework/DPS on 447.3%04—
Mott MacDonaldframework/DPS on 447.3%04—
Binnies UK Ltdframework/DPS on 335.5%03—
ARCADIS CONSULTING (UK) LIMITEDframework/DPS on 335.5%03—
Turner & Townsend Project Management Limitedframework/DPS on 335.5%03—
RPS Environmental Management Limitedframework/DPS on 123.6%2213 May 2026
GEL ENGINEERING LIMITEDframework/DPS on 223.6%1416 Sept 2026
Utilitec Services Limitedframework/DPS on 223.6%1216 Mar 2026

The three most frequent suppliers are named on 9% of 55 awarded procedures (each procedure counted once, so a panel shared by several of them is not double-counted); 217 distinct suppliers hold at least one. Descriptive concentration of published awards, not a statement of preference.

Published award value (24m)
i

How much this buyer has awarded recently, by published values.

Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.

Published values, not actual spend. The biggest rows are listed so you can check.

£15mSum of published VAT-exclusive values on 3 of 3 published single-supplier values; the five largest make 100%; a further 3 published a VAT-inclusive amount only, kept apart.
Typical single-supplier award (24m)
i

The middle published award value for this buyer.

Middle value of the same awards as the total above.

Last 24 months.

£5.0m middle valuemoderate · n=3Middle half £4.9m–£5.0m.
Largest published awards
i

The biggest published awards.

Awards to a single supplier with a published value, largest first, so you can check the totals against the notice.

A repeated framework total can appear here. Open the notice to check.

SupplierAwardedTermPublished value
TC2261 Debt Management System ReplacementQUALCO UK19 Jan 20263 yrs · up to 5 yrs£5,000,000
≈ £1.7m/yr
Enterprise Content Management Product SelectionSER Solutions United Kingdom Limited15 Jun 20265 yrs · up to 8 yrs£5,000,000
≈ £1.0m/yr
Electric Metering ServicesStark Software International Limited28 Sept 20263 yrs · up to 8.6 yrs£4,800,000
≈ £1.6m/yr

Contracts ending
i

Contracts that finish in the next 18 months.

Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.

An end date does not confirm a new procurement.

106 of 211 contracts carry an end date, 106 estimated from the duration · not a retender forecast

ContractHolderEndsPublished value
Primary SupplierAinscough Crane Hire Limited18 Nov 2026 estimatedNot published
Secondary SupplierEmerson Crane Hire Ltd18 Nov 2026 estimatedNot published

Recent procedures

Latest 50 of 134 procedures where this authority buys, is the authority the work is for, or runs the procurement

ProcedureStatusPublishedPublished value
Governance Risk and Compliance ToolIT services: consultingPlanning12 Jun 2026—
Portfolio, Programme and Project Management (P3M) System to support Asset Lifecycle and Capital DeliveryFrameworkSoftware package and information systemsCancelled9 Jun 2026£5,600,000
Access Security Products (Hardening Products)Framework7 lotsAccess coversOpen29 May 2026£30,300,000
Waste Tankering and Cleaning ServicesFramework3 lotsSludge transport servicesAwarded / complete14 May 2026£0
Sludge InspectionComposition and purity testing and analysis servicesAwarded / complete13 May 2026£1,200,000
Clean Water Network Data Logging & Leak Detection ProductsFramework3 lotsAcoustic devicesOpen8 May 2026£139,800,000
Fire Alarm Installation and Associated WorksFrameworkFire-alarm system installation workOpen29 Apr 2026£25,000,000
Design and manufacture of an Innovative Anaerobic Wastewater Treatment systemSewage digestersPlanning7 Apr 2026—
Supply, Repair, Installation and Maintenance of Sewer Depth and Event Duration MonitorsFramework5 lotsSewerage workAwarded / complete19 Mar 2026£50,200,000
Trunk Mains AMP8 Roll Out: Distributed Acoustic Sensing (DAS) Fibre Sensing SolutionSensorsOpen12 Mar 2026£7,000,000
Sewer MappingFramework3 lotsSewer survey servicesAwarded / complete6 Mar 2026£5,996,000
Control and AutomationFramework8 lotsElectrical installation workOpen25 Feb 2026£435,000,000
Facilities Management ServicesFramework4 lotsBuilding and facilities management servicesOpen23 Feb 2026£160,000,000
Site Investigation Survey FrameworkFramework4 lotsArchitecturalOpen23 Feb 2026£176,000,000
K298 Maple Lodge STW Quality AMP 7 New PermitWastewater treatment plant construction workAwarded / complete17 Feb 2026£280,000,000
Fire Alarm Installation and MaintenanceFrameworkFire-alarm system installation workCancelled3 Feb 2026£28,000,000
Main Works Contract for White Horse ReservoirFrameworkAccess road construction workOpen22 Jan 2026£5,700,000,000
Debt Management System ReplacementSoftware implementation servicesAwarded / complete19 Jan 2026£0
Electric Vehicles and Charging InfrastructureFramework2 lotsBattery chargersOpen19 Dec 2025£2,000,000
Lifecycle and WelfareFramework7 lotsAsbestos removal servicesOpen18 Dec 2025£175,040,000

Search all 134 procedures for this authority →

About this data
  • Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
  • One profile per authority. Different spellings and registration numbers of the same body are merged into this profile. It includes tenders the authority ran for other bodies and tenders run on its behalf; spend is credited to the body that pays.
  • Values are published values. Award values are what the authority published, excluding VAT and framework ceilings. They are not a budget or total spend.
  • Contract end dates. 106 of 211 published contracts have an end date; 106 of those are estimated as the signature (or publication) date plus the published duration and are marked “estimated”. They feed “Contracts ending”, the same rule as the retender radar.
  • Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.