Official UK procurement notice
Sustainable Housing Development Framework
Authority: Oxford City Council (Local council)
What is being bought2 lots · detail below
Published requirement descriptionOxford City Housing Limited (OCHL) and Oxford City Council (OCC) is establishing a framework agreement with construction contractors which are SMEs, national and international construction companies. The framework appointees will need to be able to work collaboratively with the Authority and to deliver a wide range of high quality residential sustainable energy efficient developments with a focus on a fabric first approach with "Passivhaus" principles for all options other than the 40% beyond future building regulations, and design that meets the Authority's long-term objectives (the "Sustainable Housing Development Framework").This Framework will be open and available to all Oxford City Council wholly owned Companies, other Local Authorities
[www.local.gov.uk ↗] and registered providers of Social Housing [ www.gov.u ↗
k/government/publications/current-registered-providers-of-social-housing/list-of-registeredproviders-
17-september-2020].
CPV: Construction work · Design and construction · Public
How this framework works
From the published notice- Places
- up to 8 suppliers · 7 bids on the busiest of 2 lots (0.9 per place) · 7 appointed
Lots and requirements (2)Procurement structure
2 lots · no lot values published · a supplier may bid for at most 1 and win at most 1 of them · same evaluation weights on every lotLot #1The Sustainable Housing Development Framework will be divided into the following two (2)Awarded
The Sustainable Housing Development Framework will be divided into the following two (2)
Lots:
a) Lot 1 Small Sized Projects- Value does not exceed £7,999,999.00.
b) Lot 2 Large Sized Projects- Value exceeding £8,000,000.00.
Lot #2The Sustainable Housing Development Framework will be divided into the following two (2)Awarded
The Sustainable Housing Development Framework will be divided into the following two (2)
Lots:
a) Lot 1 Small Sized Projects- Value does not exceed £7,999,999.00.
b) Lot 2 Large Sized Projects- Value exceeding £8,000,000.00.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published sub-criteria (2)
- Technical: 60%
- price: 40%
Published award criteria (2)
- Technical: 60
- Price: 40
- Price carries 40 of 100 points: a 10% discount moves about 4 points. The method statement decides this lot, not the discount.
- “Sustainable Housing Development Framework” is a framework: the contest is a place on its panel, up to 8 suppliers, not a single contract.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record · publisher note attached- Procedure method
- Restricted procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- No (one-off requirement)
- First published
- 12 Feb 2021, 17:01 GMT
- Last source update
- 14 Dec 2021, 11:37 GMT
- Authority reference
DN526366- FTS notice number
2021/S 000-031070- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-0292fdFind a Tender
Publisher note: This Framework will be open and available to all Oxford City Council wholly owned Companies, other Local Authorities [https://www.local.gov.uk/] and registered providers of Social Housing [ https://www.gov.uk/government/publications/current-registered-providers-of-social-housing/list-of-registered-providers-17-september-2020]. PQQ documentation and Framework ovearching Agreement will be published on the following portal by Tuesday 16th February 2021 https://procontract.due-north.com/ Reference number DN526366
How it was run
Official notice- Appointment period ends
- 26 Mar 2021, 12:00 GMT
- Submission channel
- {"electronicSubmission"}
- Accepted languages
- en
Timeline
26 Mar 2021 → 14 Dec 2021 · 3 dates- Admission / appointment period endsperiod end, not a bid countdown26 Mar 2021, 12:00 GMT
- Invitations to tender expected23 Apr 2021, 00:00 BST
- Notice published14 Dec 2021, 11:37 GMT
Notice history
1 event · 2 releases on Find a Tender- Status changed to complete14 Dec 2021, 11:37 GMT
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast7 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.
Contracts
Contract 031070-2021-1-1
- Signed
- 14 Dec 2021
- Value
- —
- Status
- active
Contract 031070-2021-1-4
- Signed
- 14 Dec 2021
- Value
- —
- Status
- active
Contract 031070-2021-2-2
- Signed
- 14 Dec 2021
- Value
- —
- Status
- active
Contract 031070-2021-2-5
- Signed
- 14 Dec 2021
- Value
- —
- Status
- active
Contract 031070-2021-3-3
- Signed
- 14 Dec 2021
- Value
- —
- Status
- active
Contract 031070-2021-3-6
- Signed
- 14 Dec 2021
- Value
- —
- Status
- active
Contract 031070-2021-4-7
- Signed
- 14 Dec 2021
- Value
- —
- Status
- active
Bid statistics published by the authority
| Lot | Bids | SME | VCSE | Valid bid range |
|---|---|---|---|---|
| 1 · The Sustainable Housing Development Framework will be divided into the following two (2) | 3bids · 3 electronic | 2 | — | £500,000,000 – £1,000,000,000 |
| 2 · The Sustainable Housing Development Framework will be divided into the following two (2) | 7bids · 7 electronic | 2 | — | £500,000,000 – £1,000,000,000 |
| Whole notice | — | — | — | £1,000,000,000 – £1,000,000,000 |
Contracting authority & participating public bodies
Dispute resolution & review bodies
- OCHL Company SecretaryReview body
Framework contractors & participating bidders
7 commercial parties on the notice- Barratt Developments PLCFramework contractor
- Buildeco LimitedFramework contractor
- Engie Regeneration LimitedFramework contractor
- Feltham Construction LimitedFramework contractor
- Geoffrey Osborne LimitedFramework contractor
- Hill Holdings LimitedFramework contractor
- Impact Modular LimitedFramework contractor
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.